Cargando…

Site control of materials : handling, storage, and protection /

Site Control of Materials.

Detalles Bibliográficos
Clasificación:Libro Electrónico
Autor principal: Johnston, John Edward
Formato: Electrónico eBook
Idioma:Inglés
Publicado: London ; Boston : Butterworths, 1981.
Temas:
Acceso en línea:Texto completo
Tabla de Contenidos:
  • Front Cover; Site Control of Materials: Handling, Storage and Protection; Copyright Page; Preface; Table of Contents; Chapter 1. The need for site controls; Changing patterns of supply and demand; Design; Waste; Management; Site management; Chapter 2. Obtaining the materials; Pre-contract arrangements; Manufacturers and suppliers; Programme of the works; Materials samples; Call-off procedures; Chapter 3. Materials handling; General objectives; Unit loads; Pallets; Deliveries; Offloading; Distribution; Waste in handling; Chapter 4. Plant and equipment for materials handling; Cranes.
  • Crane attachmentsHoists; Dumpers; Forklift trucks; Chapter 5. Storage of materials; Compound facilities; Stockpile arrangements; Ground preparation; Stacking materials; Protection; Site surplus; Withdrawing stores; Responsibilities of storage; Chapter 6. Stock controls on site; Materials controller; Checking procedures; Checkers' duties; Coordinating supplies; Materials schedules; Controlled distribution; Transfer of materials; Accounting procedures; Interim accounts; Chapter 7. Security of plant and materials; Security controls; Fencing to the compound; Security of site stores.
  • Security lightingFire precautions; Vehicle compounds; Immobilising plant on site; Personnel controls; Communications on site; Intruder alarm systems; Chapter 8. Preventing damage on site; Protection of finished work; Site controls; Site supervision; Out-of-hours supervision; Vandalism; Fire precautions in partly completed buildings; Police contacts; Appendix 1: Schedule of materials controls; Appendix 2: Schedules and return forms; 1 Samples register; 2 Brick schedule; 3 Door schedule; 4 Door schedule; 5 Materials received chart; 6 Components register; 7 Monthly materials receipts.
  • 8 Monthly interim claim9 Mechanical plant return; 10 Hired mechanical plant return; Index.