Cargando…

Construction project management research compendium. Volume 6 /

Detalles Bibliográficos
Clasificación:Libro Electrónico
Otros Autores: Arain, Faisal Manzoor (Editor )
Formato: Electrónico eBook
Idioma:Inglés
Publicado: New York : Nova Publishers, [2016]
Temas:
Acceso en línea:Texto completo

MARC

LEADER 00000cam a2200000 i 4500
001 EBSCO_ocn959981297
003 OCoLC
005 20231017213018.0
006 m o d
007 cr cnu---unuuu
008 161006s2016 nyu ob 001 0 eng d
040 |a N$T  |b eng  |e rda  |e pn  |c N$T  |d EBLCP  |d YDX  |d SNK  |d DKU  |d AUW  |d IGB  |d D6H  |d OCLCF  |d VTS  |d RRP  |d AGLDB  |d G3B  |d S8J  |d S9I  |d STF  |d OCLCQ  |d OCLCO  |d K6U  |d OCLCQ  |d OCLCO 
019 |a 962244194 
020 |a 9781634855556  |q (electronic bk.) 
020 |a 1634855558  |q (electronic bk.) 
020 |z 9781634855198 
029 1 |a AU@  |b 000059028731 
035 |a (OCoLC)959981297  |z (OCoLC)962244194 
050 4 |a TH438 
072 7 |a BUS  |x 082000  |2 bisacsh 
072 7 |a BUS  |x 041000  |2 bisacsh 
072 7 |a BUS  |x 042000  |2 bisacsh 
072 7 |a BUS  |x 085000  |2 bisacsh 
082 0 4 |a 658.404  |2 23 
049 |a UAMI 
245 0 0 |a Construction project management research compendium.  |n Volume 6 /  |c Faisal M. Arain, editor. 
264 1 |a New York :  |b Nova Publishers,  |c [2016] 
300 |a 1 online resource 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
588 0 |a Online resource; title from PDF title page (Ebsco, viewed September 18, 2014). 
504 |a Includes bibliographical references and index. 
588 0 |a Print version record. 
505 0 |a Preface; Confidence Based Scheduling Procedure (CBSP): A Pragmatic Approach to Manage Project Schedule Uncertainty; Abstract; Introduction; Review of Probability Based Methods in Scheduling; Confidence Based Scheduling Procedure (CBSP); CBSP-Part 1: Probability Distribution of Project Completion Time; CBSP-Part 2: Criticality of Paths (PCI) and Criticality of Activities (ACI); Using Confidence Based Scheduling Procedure; How Do CBSP's Results Measure Up with PERT's?; Discussion; Conclusion; References 
505 8 |a Adoption of Design and Build Procurement Method: An Empirical Study on Wynn Macau ResortAbstract; Introduction; The Current Practices of Procurement Methods; Research Methodology; Characteristics in Adopting Design and Build Procurement; Attractive Features in Adopting Design and Build Contract; Shortcomings in Adopting Design and Build Contract; Success Criteria for Design and Build Projects; Conclusion; References; Lean Project Planning:; Using Lean Principles in Project Planning; Abstract; 1. Frame of Reference; 2. Review of Last Planner System; 3. Introducing Lean Project Planning 
505 8 |a 3.1. From CONWIP in Manufacturing to CONWIP in Projects3.2. Planning as Communication; 3.3. Improving Maneuverability by Project Planning; 4. Closure; Acknowledgments; References; Monitoring Project Progress:; Project Managers' Perspectives; Abstract; Introduction; Research Methodology; Results; I. Pilot Estimate Results; II. Main Findings from the Questionnaire Survey; III. Main Factors Associated with Percent Complete Factors; a) Lack of Accuracy; b) Lack of Consistency with Actual Project Status; c) Lack of Knowledge and Experience in Project Scheduling and Estimating 
505 8 |a D) Lack of Dedicated Resources to Perform Percent Complete CalculationsIV. The Percent Complete Application Performance Levels; a) Perform Excellently (PE); b) Perform Ordinary (PO); c) Perform Poorly (PP); V. Percent Complete Paradox; a) Using of Percent Complete Applications with Poor Performances in Project Payments; b) Use of Percent Complete in Project Status Evaluation; c) Use of Percent Complete Application in Legal Documents; d) Use of Percent Complete for All Types of Project; Conclusion; References; An Annualized Rate of Return-Based Concession Duration Model for BOT Contracts 
505 8 |a Abstract1. Introduction; 2. The BOT Concession Period Interval Model (BOTCcM); 3. Limitations in Equation (1); 4. An Annualized ROR Based Concession Duration Model for BOT Contracts; 5. The Case; Conclusion; References; Principle Factors Contributing to Construction Delays in the State of Qatar; Abstract; Introduction; Literature Review; Research Methodology and Data Analysis; Results and Discussion; Conclusion and Recommendations; References; Perceptions Regarding Greek Construction Project Designers' Cognitive Abilities, Personality and Knowledge; Abstract; 1. Introduction 
590 |a eBooks on EBSCOhost  |b EBSCO eBook Subscription Academic Collection - Worldwide 
650 0 |a Construction projects  |x Management. 
650 0 |a Project management. 
650 6 |a Projets de construction  |x Gestion. 
650 6 |a Gestion de projet. 
650 7 |a BUSINESS & ECONOMICS  |x Industrial Management.  |2 bisacsh 
650 7 |a BUSINESS & ECONOMICS  |x Management.  |2 bisacsh 
650 7 |a BUSINESS & ECONOMICS  |x Management Science.  |2 bisacsh 
650 7 |a BUSINESS & ECONOMICS  |x Organizational Behavior.  |2 bisacsh 
650 7 |a Project management  |2 fast 
700 1 |a Arain, Faisal Manzoor,  |e editor. 
776 0 8 |i Print version:  |t Construction project management research compendium. Volume 6.  |d New York : Nova Publishers, [2016]  |z 9781634855198 
856 4 0 |u https://ebsco.uam.elogim.com/login.aspx?direct=true&scope=site&db=nlebk&AN=1365770  |z Texto completo 
938 |a ProQuest Ebook Central  |b EBLB  |n EBL4713617 
938 |a EBSCOhost  |b EBSC  |n 1365770 
938 |a YBP Library Services  |b YANK  |n 13013185 
994 |a 92  |b IZTAP