Cargando…

Rapid Excavation and Tunneling Conference 2015 proceedings /

Detalles Bibliográficos
Clasificación:Libro Electrónico
Autor Corporativo: Rapid Excavation and Tunneling Conference
Otros Autores: Johnson, Mark (Mark C.) (Editor ), Oginski, Shemek (Editor )
Formato: Electrónico Congresos, conferencias eBook
Idioma:Inglés
Publicado: Englewood, Colorado : Society for Mining Metallurgy & Exploration, 2015.
Temas:
Acceso en línea:Texto completo
Tabla de Contenidos:
  • Cover; Title Page; Copyright; Contents; Preface; Executive Committee; Session Chairs; International Committee; Part 1: Caverns and Large Spans; Holmestrand Underground Railway Station from Vision to Reality; New York City Grand Central Subway Station Planned Modifications and Improvements; Second Avenue Subway Project: Design and Construction of Large Cavern Final Linings and Penetrations at 86th Street Station; Roof Displacements in Pump Station Cavern in the Chagrin Shale; St. Louis' Sewer Tunnel Vision; Part 2: Contracting Practices.
  • I-70 Twin Tunnels Widening Using Drill and Blast Under CM/GC ContractSupport of Excavation for Roosevelt Station: Successful Partnering Overcomes Challenging Construction Change; Seattle Light Rail Tunnels Quality Control and Assurance: Stakeholder Collaboration Delivers Successful Project; Integrated Design Process for First Street Tunnel; Partnering Through Risk Management: Lake Mead Intake No. 3 Risk Management Approach; Construction-You Need Risk-Based Cost Estimating; Part 3: Design and Planning I.
  • Critical Connections: Planning and Preparation Needed for the Eastside Access Project's Westbound Bypass Jacked Shield TunnelSouth Hartford CSO Tunnel and Pump Station; High Speed Two (HS2)-General Overview of Project with Focus on Tunnelling Challenges; Evolution of Large-Diameter TBM Road Tunnel Design; Project Configuration and Design Challenges for the City of Ottawa Combined Sewage Storage Tunnel Project; Modelling of Ground Deformation Control Induced by Slurry Shield Tunnelling; Part 4: Design and Planning II.
  • Continuing a Legacy of Large-Diameter Hard Rock Tunneling in Chicago-The Des Plaines Inflow TunnelElements of the Istanbul Strait Highway Tunnel; Design and Construction Considerations for the Blacklick Creek Sanitary Interceptor Sewer Project in Franklin County, Ohio; Deep Tunnel Pump Station-Design/Construction; Decision Process and Criteria for Selection of a Preferred Tunnelling Method; Part 5: Design-Build Projects; Urban Challenges of the Downtown Los Angeles Regional Connector Tunnel Project; Concrete Operations at the 86th Street Station for the 2nd Avenue Subway Line.
  • PPP Mode for Procurement of Lines 2 and 4 of Lima MetroUnique Characteristics of the Design and Construction of the Second Midtown Tunnel in Hampton Roads, Virginia; Practical Aspects of Final Design Development Using Design-Build Procurement; The Planning and Procurement Process of the Northeast Boundary Tunnel (NEBT) Project: DC Water-District of Columbia; Part 6: Difficult Ground; Challenges and Methods Utilized to Excavate Rock for an Escalator Incline Through a Luxury High-Rise Building in Manhattan.