- Introduction
- Chapter 1 Types of Claims
- 1.1 What Are Claims?
- 1.2 Measurement Claims
- 1.3 Changes to the Character Timing, Quality and Content
- 1.4 Revised Rates and Prices
- 1.5 Access and Possession of the Site
- 1.6 Changes
- 1.6.1 Varied Works
- 1.6.2 Changes to Scope
- 1.6.3 Quality of Materials
- 1.6.4 Design Changes/Increased Scope of Work
- 1.6.5 Value Engineering
- 1.6.6 Preferential Engineering
- 1.6.7 Varied Temporary Works
- 1.6.8 Unforeseen Conditions
- 1.6.9 Contaminated Materials (e.g. Asbestos or Hydrocarbons)
- 1.6.10 Adverse Weather
- 1.6.11 Force Majeure Events
- 1.6.12 Suspension Orders/Stop Work Orders
- 1.6.13 Late Approval/Failure to Approve
- 1.6.14 Late Information/Revised Information
- 1.6.15 Antiquities or Archaeological Discoveries
- 1.6.16 The Prevention Principle
- 1.6.17 Tolerance Creep
- 1.6.18 Utilities and Services
- 1.6.19 Insurance Matters
- 1.6.20 Disruption Claims
- 1.6.21 Mitigation Claims
- 1.6.22 Acceleration Claims
- 1.6.23 Delayed or Wrongful Withholding of Payment by the Employer
- 1.6.24 Termination of the Contract
- Chapter 2 Basis of Claims
- 2.1 Contractual Basis
- 2.2 Initial Investigation
- 2.3 Causation and Liability
- 2.4 Review of Contract Clauses
- Chapter 3 Contracts
- 3.1 The Construction and Interpretation of Contracts
- 3.1.1 A Note on Ejusdem Generis
- 3.2 Formation of the Contract and Disputed Terms
- 3.2.1 Judicial Implied Terms
- 3.3 Interpretation of Statutes
- 3.4 Standard Forms
- 3.5 Modifications to Standard Forms
- 3.6 Bespoke/Unique Contracts
- Chapter 4 Available Documents
- 4.1 Documents Likely to Be Available
- 4.1.1 Tender Information
- 4.1.2 Tender and Final Contract
- 4.1.3 Contract Documents
- 4.1.4 Commencement and Access
- 4.1.5 Contract Records
- 4.1.5.1 Correspondence
- 4.1.5.2 Minutes of Meetings
- 4.1.5.3 Construction Records
- 4.1.5.4 Drawing Registers
- 4.1.6 Approval/Acceptance of Submissions
- 4.1.6.1 Programmes, Method Statements and Temporary Works Designs
- 4.1.6.2 Construction Permits, Inspections and Approvals
- 4.1.6.3 Taking-Over Certificates or Completion Certificates for the Works or Sections of the Works
- Chapter 5 Records and Notices
- 5.1 Records
- 5.2 Contemporary Records
- 5.3 Source Data
- 5.3.1 Expenditure
- 5.3.1.1 People
- 5.3.1.2 Plant and Equipment
- 5.3.2 Progress Reports
- 5.4 Other Relevant Evidence
- 5.4.1 Diaries and Other Records
- 5.4.2 Plant and Equipment
- 5.4.3 Other Records
- 5.4.4 Unexpected Events and/or Ground Conditions
- 5.5 Maximising Recovery
- 5.6 Missing Records
- 5.7 Notices
- 5.8 Time Bar Provisions and Timing of Notices
- 5.9 Disclaimers and Reservation of Rights
- Chapter 6 Programmes
- 6.1 Planning and Programming Techniques
- 6.1.1 Introduction
- 6.1.1.1 Why Prepare Programmes?