Cargando…

Revisiting Public-Private Partnerships in the Power Sector.

Given the chronic power shortages faced by numerous developing countries, and the need everywhere to keep pace with demand, understanding the drivers of public private partnerships (PPPs) in energy is critical. While many private electricity projects have been delayed and financing costs have increa...

Descripción completa

Detalles Bibliográficos
Clasificación:Libro Electrónico
Autor principal: Vagliasindi, Maria
Formato: Electrónico eBook
Idioma:Inglés
Publicado: Washington : World Bank Publications, 2013.
Colección:World Bank studies.
Temas:
Acceso en línea:Texto completo

MARC

LEADER 00000cam a2200000Mu 4500
001 EBOOKCENTRAL_ocn841909122
003 OCoLC
005 20240329122006.0
006 m o d
007 cr |n|---|||||
008 130418s2013 dcu o 000 0 eng d
040 |a MHW  |b eng  |e pn  |c MHW  |d OCLCO  |d IDEBK  |d YDXCP  |d MEAUC  |d DEBSZ  |d CEF  |d OCLCQ  |d ZCU  |d MERUC  |d OCLCQ  |d ICG  |d OCLCO  |d OCLCF  |d OCLCQ  |d OCLCO  |d OCLCQ  |d COCUF  |d DKC  |d OCLCQ  |d LVT  |d OCLCO  |d OCLCQ  |d OCLCO  |d OCLCL 
019 |a 864596082  |a 1229171607 
020 |a 9780821397657 
020 |a 0821397656 
020 |a 9780821397626 
020 |a 0821397621 
029 1 |a AU@  |b 000052916444 
029 1 |a DEBBG  |b BV044174542 
029 1 |a DEBSZ  |b 397521235 
029 1 |a NZ1  |b 15303187 
035 |a (OCoLC)841909122  |z (OCoLC)864596082  |z (OCoLC)1229171607 
050 4 |a HD3850 
082 0 4 |a 361.2/5 
049 |a UAMI 
100 1 |a Vagliasindi, Maria. 
245 1 0 |a Revisiting Public-Private Partnerships in the Power Sector. 
260 |a Washington :  |b World Bank Publications,  |c 2013. 
300 |a 1 online resource (200 pages). 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
490 1 |a World Bank Studies 
588 0 |a Print version record. 
520 |a Given the chronic power shortages faced by numerous developing countries, and the need everywhere to keep pace with demand, understanding the drivers of public private partnerships (PPPs) in energy is critical. While many private electricity projects have been delayed and financing costs have increased, the impact of the global financial crisis was less severe than that of previous crises that originated in developing countries. This resilience stems from developing countries' need to expand generation capacity, electricity sector reforms and better regulatory frameworks, and short-term soluti. 
505 0 |a Front Cover; Title Page; Copyright; Contents; Tables; Figures; Boxes; Acknowledgments; Overview Chapter; How the Recent Financial Crisis Compares to Past Ones; How Does the Financial Crisis Affect the Financing Gaps?; How Do Climate Change Considerations Affect Investment Needs?; Sources of Financing of Investment for Conventional Power; Sources of Financing of Investment for Climate Change; References; Chapter 1 Investment Needs and Financing Challenges; A Profile of PPP Power Activities; The Role of Sectoral Governance; How the Econometric Study Was Done; Econometric Results; Notes. 
590 |a ProQuest Ebook Central  |b Ebook Central Academic Complete 
650 0 |a Public-private sector cooperation. 
650 0 |a Business networks. 
650 0 |a Strategic alliances (Business) 
650 6 |a Partenariat public-privé. 
650 6 |a Réseaux d'affaires. 
650 6 |a Alliances stratégiques (Affaires) 
650 7 |a Business networks  |2 fast 
650 7 |a Public-private sector cooperation  |2 fast 
650 7 |a Strategic alliances (Business)  |2 fast 
758 |i has work:  |a Revisiting public-private partnerships in the power sector (Text)  |1 https://id.oclc.org/worldcat/entity/E39PCH4CgdVkhtwDphfg4pM3wC  |4 https://id.oclc.org/worldcat/ontology/hasWork 
776 0 8 |i Print version:  |z 9780821397626 
830 0 |a World Bank studies. 
856 4 0 |u https://ebookcentral.uam.elogim.com/lib/uam-ebooks/detail.action?docID=1165941  |z Texto completo 
938 |a ProQuest MyiLibrary Digital eBook Collection  |b IDEB  |n cis25220641 
938 |a YBP Library Services  |b YANK  |n 9964622 
994 |a 92  |b IZTAP