|
|
|
|
LEADER |
00000cam a22000004a 4500 |
001 |
musev2_110792 |
003 |
MdBmJHUP |
005 |
20230905054509.0 |
006 |
m o d |
007 |
cr||||||||nn|n |
008 |
220518s2023 ncu o 00 0 eng d |
010 |
|
|
|z 2022006716
|
020 |
|
|
|a 9781478092810
|
020 |
|
|
|z 9781478019145
|
020 |
|
|
|z 9781478023777
|
020 |
|
|
|z 9781478016502
|
040 |
|
|
|a MdBmJHUP
|c MdBmJHUP
|
100 |
1 |
|
|a Degani, Michael,
|d 1983-
|e author.
|
245 |
1 |
4 |
|a The City Electric :
|b Infrastructure and Ingenuity in Postsocialist Tanzania /
|c Michael Degani.
|
264 |
|
1 |
|a Durham :
|b Duke University Press,
|c 2023.
|
264 |
|
3 |
|a Baltimore, Md. :
|b Project MUSE,
|c 0000
|
264 |
|
4 |
|c ©2023.
|
300 |
|
|
|a 1 online resource.
|
336 |
|
|
|a text
|b txt
|2 rdacontent
|
337 |
|
|
|a computer
|b c
|2 rdamedia
|
338 |
|
|
|a online resource
|b cr
|2 rdacarrier
|
505 |
0 |
|
|a Introduction: Ethnography of(f) the Grid -- Emergency Power: A Brief History of the Tanzanian Energy Sector -- The Flickering Torch: Power and Loss After Socialism -- Of Meters and Modals -- Becoming Infrastructure: Vishoka and Self-Realization -- Conclusion: The Ingenuity of Infrastructure
|
506 |
0 |
|
|a Open Access
|f Unrestricted online access
|2 star
|
520 |
|
|
|a "Over the last twenty years of neoliberal reform, the power supply in Dar es Salaam, Tanzania's metropolis, has become less reliable even as its importance has increased. Though mobile phones, televisions, and refrigerators have flooded the city, the electricity required to run these devices is still supplied by the socialist-era energy company Tanesco, which is characterized by increased fees, aging infrastructure, and a sluggish bureaucracy. While some residents contemplate off-grid solutions, others repair, extend, or tap into the state network with the assistance of freelance electricians or moonlighting utility employees. In The City Electric Michael Degani explores how electricity and its piracy has become a key site for urban Tanzanians to enact, experience, and debate their social contract with the state. Moving from the politics of generation contracts down to the street level experience of blackouts and disconnection patrols, he reveals the logics of infrastructural modification and their effects on everyday life. As politicians, residents, electricians, and utility inspectors all redistribute flows of payment and power, they reframe the energy grid as both a technical system and an ongoing experiment in collective interdependence"--
|c Provided by publisher.
|
588 |
|
|
|a Description based on print version record.
|
610 |
2 |
7 |
|a Tanzania Electric Supply Company.
|2 fast
|0 (OCoLC)fst00566100
|
610 |
2 |
0 |
|a Tanzania Electric Supply Company.
|
650 |
|
7 |
|a Political corruption.
|2 fast
|0 (OCoLC)fst01069240
|
650 |
|
7 |
|a Electric utilities
|x Corrupt practices.
|2 fast
|0 (OCoLC)fst00905988
|
650 |
|
7 |
|a Electric utilities.
|2 fast
|0 (OCoLC)fst00905974
|
650 |
|
7 |
|a Electric power transmission.
|2 fast
|0 (OCoLC)fst00905596
|
650 |
|
7 |
|a Electric power distribution
|x Reliability.
|2 fast
|0 (OCoLC)fst00905457
|
650 |
|
7 |
|a HISTORY / Africa / East.
|2 bisacsh
|
650 |
|
7 |
|a SOCIAL SCIENCE / Anthropology / Cultural & Social.
|2 bisacsh
|
650 |
|
0 |
|a Political corruption
|z Tanzania
|z Dar es Salaam.
|
650 |
|
0 |
|a Electric utilities
|x Corrupt practices
|z Tanzania
|z Dar es Salaam.
|
650 |
|
0 |
|a Electric utilities
|z Tanzania
|z Dar es Salaam.
|
650 |
|
0 |
|a Electric power transmission
|z Tanzania
|z Dar es Salaam.
|
650 |
|
0 |
|a Electric power distribution
|z Tanzania
|z Dar es Salaam
|x Reliability.
|
651 |
|
7 |
|a Tanzania
|z Dar es Salaam.
|2 fast
|0 (OCoLC)fst01205797
|
655 |
|
7 |
|a Electronic books.
|2 local
|
710 |
2 |
|
|a Project Muse.
|e distributor
|
830 |
|
0 |
|a Book collections on Project MUSE.
|
856 |
4 |
0 |
|z Texto completo
|u https://projectmuse.uam.elogim.com/book/110792/
|