Cargando…

Applied gaseous fluid drilling engineering : design and field case studies /

Detalles Bibliográficos
Clasificación:Libro Electrónico
Autor principal: Guo, Boyun
Otros Autores: Meng, Yingfeng, Wei, Na
Formato: Electrónico eBook
Idioma:Inglés
Publicado: Cambridge, MA : Gulf Professional Publishing, [2022]
Temas:
Acceso en línea:Texto completo

MARC

LEADER 00000cam a2200000 a 4500
001 SCIDIR_on1269096262
003 OCoLC
005 20231120010606.0
006 m o d
007 cr |n|||||||||
008 210926s2022 mau o 001 0 eng d
040 |a YDX  |b eng  |e pn  |c YDX  |d OPELS  |d OCLCO  |d OCLCF  |d OCLCQ  |d OCLCO  |d K6U  |d SFB  |d OCLCQ  |d OCLCO 
019 |a 1269201588  |a 1287274329  |a 1287871382 
020 |a 9780323903288  |q (electronic bk.) 
020 |a 0323903282  |q (electronic bk.) 
020 |z 9780323856751 
020 |z 0323856756 
035 |a (OCoLC)1269096262  |z (OCoLC)1269201588  |z (OCoLC)1287274329  |z (OCoLC)1287871382 
050 4 |a TN871.2 
082 0 4 |a 622.3381  |2 23 
100 1 |a Guo, Boyun. 
245 1 0 |a Applied gaseous fluid drilling engineering :  |b design and field case studies /  |c Boyun Guo, Yingfeng Meng and Na Wei. 
260 |a Cambridge, MA :  |b Gulf Professional Publishing,  |c [2022] 
300 |a 1 online resource 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
500 |a Includes index. 
588 0 |a Print version record. 
505 0 |a Front Cover -- Applied Gaseous Fluid Drilling Engineering -- Copyright Page -- Dedication -- Contents -- Preface -- 1 Introduction -- 1.1 Fluid systems -- 1.2 Major applications -- 1.3 Benefits and limitations -- 1.4 IADC guidelines -- 1.5 Summary -- References -- Problems -- 2 Gaseous drilling fluid systems -- 2.1 Introduction -- 2.2 Gaseous fluid systems -- 2.2.1 Gas system -- 2.2.1.1 Air -- 2.2.1.2 Nitrogen -- 2.2.1.3 Natural gas -- 2.2.2 Foam system -- 2.2.3 Gasified liquid system -- 2.3 Selection of fluid systems -- 2.3.1 Comparison of fluid systems -- 2.3.2 Applications of fluid systems -- 2.3.2.1 Gas system -- 2.3.2.2 Foam system -- 2.3.2.3 Gasified liquid system -- 2.3.3 Safety issues -- 2.3.4 Economics considerations -- 2.4 Summary -- References -- Problems -- 3 Multiphase fluid hydrology -- 3.1 Introduction -- 3.2 Multiphase flow -- 3.2.1 Gas drilling system -- 3.2.1.1 Upward flow in annulus -- 3.2.1.1.1 Vertical hole section -- 3.2.1.1.2 Curve hole section -- 3.2.1.1.3 Slant hole section -- 3.2.1.1.4 Horizontal hole section -- 3.2.1.2 Gas flow through bit -- 3.2.1.3 Downward flow in drill string -- 3.2.1.3.1 Vertical hole section -- 3.2.1.3.2 Curve hole section -- 3.2.1.3.3 Slant hole section -- 3.2.1.3.4 Horizontal hole section -- 3.2.2 Foam drilling system -- 3.2.3 Gasified liquid drilling system -- 3.3 Bottom-hole pressure -- 3.3.1 Gas drilling system -- 3.3.2 Foam drilling system -- 3.3.3 Gasified liquid drilling system -- 3.4 Surface injection pressure -- 3.4.1 Gas drilling system -- 3.4.2 Foam drilling system -- 3.4.3 Gasified liquid drilling system -- 3.5 Summary -- References -- Problems -- 4 Surface and downhole equipment -- 4.1 Introduction -- 4.2 Gas drilling system -- 4.2.1 Surface equipment -- 4.2.2 Downhole equipment -- 4.3 Foam drilling system -- 4.4 Gasified liquid drilling system -- 4.4.1 Surface equipment. 
505 8 |a 4.4.2 Downhole equipment -- 4.5 Summary -- References -- Problems -- 5 Selection of gas compressors -- 5.1 Introduction -- 5.2 Characteristics of compressors -- 5.2.1 Reciprocating compressors -- 5.2.2 Centrifugal compressors -- 5.3 Compressor selection -- 5.3.1 Flow rate requirement -- 5.3.1.1 Criteria for hole cleaning -- 5.3.1.1.1 Minimum velocity criterion for particles -- 5.3.1.1.2 Minimum kinetic energy criterion for particles -- 5.3.1.1.3 Minimum velocity criterion for droplets -- 5.3.1.1.4 Minimum kinetic energy criterion for droplets -- 5.3.2 Pressure requirement -- 5.3.3 Horsepower requirement -- 5.4 Summary -- References -- Problems -- 6 Hydraulics design -- 6.1 Introduction -- 6.2 Gas drilling -- 6.2.1 Misting water -- 6.2.2 Gas flow rate -- 6.2.3 Bit nozzle size -- 6.3 Foam drilling -- 6.3.1 Gas injection rate -- 6.3.2 Liquid injection rate -- 6.4 Gasified liquid drilling -- 6.4.1 UBD pressure differential -- 6.4.2 Collapse pressure -- 6.4.3 Formation fluid influx -- 6.4.4 Construction of GLRW -- 6.5 Role of circulation temperature -- 6.6 Summary -- References -- Problems -- 7 Operation procedures -- 7.1 Introduction -- 7.2 Gas drilling -- 7.2.1 Initiating gas drilling -- 7.2.2 Initiating mist drilling -- 7.2.3 Making connections -- 7.2.4 Tripping pipe -- 7.2.5 Strengthening borehole -- 7.2.6 Cutting "mud ring" -- 7.2.7 Removing formation fluids -- 7.2.8 Preventing bit balling -- 7.2.9 Minimizing borehole washout and crooked hole -- 7.2.10 Loading the hole for cementing -- 7.3 Foam drilling -- 7.3.1 Improving foam stability -- 7.3.2 Handling returned foam -- 7.4 Gasified liquid drilling -- 7.5 Identification of common problems in UBD -- 7.6 Controlling equivalent circulation density and equivalent mud weight -- 7.6.1 Controlling ECD -- 7.6.2 Controlling EMW -- 7.7 Common procedures for gaseous fluid drilling. 
505 8 |a 7.7.1 Controlling corrosion -- 7.7.2 Ensuring safety -- 7.8 Summary -- References -- Problems -- 8 Unconventional gas drilling systems -- 8.1 Introduction -- 8.2 Reverse circulation system -- Solution -- 8.3 Flow diverting system -- 8.4 Gas recycling system -- 8.5 Summary -- References -- Problems -- 9 Field application cases -- 9.1 Introduction -- 9.2 Increasing drilling performance -- 9.3 Improving well productivity -- 9.4 Summary -- References -- Appendix A: API drill pipe dimensional data -- Appendix B: API drill collar weight data -- Appendix C: API casing dimensional data -- Appendix D: Minimum required gas flow rate for hole cleaning -- Appendix E: Derivation of a general heat transfer model for gas drilling -- Appendix F: Derivation of a general heat transfer model for reverse circulation gas drilling -- Index -- Back Cover. 
650 0 |a Drilling muds. 
650 0 |a Boring. 
650 6 |a Boues de forage.  |0 (CaQQLa)201-0101382 
650 6 |a Forage.  |0 (CaQQLa)201-0008554 
650 7 |a drilling (process)  |2 aat  |0 (CStmoGRI)aat300053151 
650 7 |a Boring  |2 fast  |0 (OCoLC)fst00836649 
650 7 |a Drilling muds  |2 fast  |0 (OCoLC)fst00898124 
700 1 |a Meng, Yingfeng. 
700 1 |a Wei, Na. 
776 0 8 |i Ebook version :  |z 9780323903288 
776 0 8 |i Print version:  |a Guo, Boyun.  |t Applied gaseous fluid drilling engineering.  |d Cambridge, MA : Gulf Professional Publishing, [2022]  |z 0323856756  |z 9780323856751  |w (OCoLC)1250304707 
856 4 0 |u https://sciencedirect.uam.elogim.com/science/book/9780323856751  |z Texto completo