Cargando…

Securing the outdoor construction site : strategy, prevention, and mitigation /

Annotation

Detalles Bibliográficos
Clasificación:Libro Electrónico
Autor principal: Carney, Kevin Wright (Autor)
Formato: Electrónico eBook
Idioma:Inglés
Publicado: Amsterdam : Butterworth-Heinemann is an imprint of Elsevier, 2015.
Temas:
Acceso en línea:Texto completo

MARC

LEADER 00000cam a2200000 i 4500
001 SCIDIR_ocn921933607
003 OCoLC
005 20231120112023.0
006 m o d
007 cr cnu|||unuuu
008 150923s2015 ne a o 000 0 eng d
040 |a N$T  |b eng  |e rda  |e pn  |c N$T  |d N$T  |d YDXCP  |d OPELS  |d IDEBK  |d CDX  |d OCLCF  |d EBLCP  |d DEBSZ  |d IDB  |d OCLCQ  |d MERUC  |d OCLCQ  |d WRM  |d U3W  |d D6H  |d OCLCQ  |d WYU  |d CUY  |d ZCU  |d ICG  |d DKC  |d OCLCQ  |d LQU  |d ABC  |d DCT  |d UKMGB  |d OCLCQ  |d S2H  |d OCLCO  |d OCLCQ  |d OCLCO 
015 |a GBB5A6344  |2 bnb 
016 7 |a 017472746  |2 Uk 
019 |a 922703360  |a 929521608  |a 932328801  |a 1105183916  |a 1105567653  |a 1125077103 
020 |a 9780128026021  |q (electronic bk.) 
020 |a 0128026022  |q (electronic bk.) 
020 |z 9780128023839 
020 |z 012802383X 
035 |a (OCoLC)921933607  |z (OCoLC)922703360  |z (OCoLC)929521608  |z (OCoLC)932328801  |z (OCoLC)1105183916  |z (OCoLC)1105567653  |z (OCoLC)1125077103 
050 4 |a TH900 
072 7 |a SOC  |x 004000  |2 bisacsh 
082 0 4 |a 364.16/2 
100 1 |a Carney, Kevin Wright,  |e author. 
245 1 0 |a Securing the outdoor construction site :  |b strategy, prevention, and mitigation /  |c Kevin Wright Carney. 
264 1 |a Amsterdam :  |b Butterworth-Heinemann is an imprint of Elsevier,  |c 2015. 
300 |a 1 online resource :  |b illustrations 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
588 0 |a Vendor-supplied metadata. 
505 0 |a Front Cover; Securing the Outdoor Construction Site; Copyright Page; Dedication; Contents; Introduction; Who Should Read This Book; About the Author; Acknowledgments; 1 The Impact of Construction Site Theft; The Interstate 5 Project in Norwalk: Part One; The Bridge at Hesperia: Part One; Danger to Security Personnel at the Site; You Get What You Inspect, Not What You Expect; Chapter Points by Discipline; 2 What Is Being Stolen?; Machinery and Vehicles; Mitigating Strategies to Prevent Vehicle and Equipment Theft; Metals; The Interstate 5 Project at Norwalk: Part two; Materials. 
505 8 |a Chapter Points by Discipline3 Rolling the Dice; The Bottom Line; Have a Security Planning Meeting; Do-It-Yourself Security; The Proposal; Chapter Points by Discipline; 4 Naming the Losses; Expect the Unexpected; Who are the Thieves?; The Background Investigation; The Theft Triangle; Theft by Outsiders; Embezzlement; Theft of Machinery; Theft of Materials; Fire; Injury Accidents; Fatalities; Vehicle Collisions; Flooding; Earthquakes; Watercraft Accidents; Aircraft Accidents; Chapter Points by Discipline; 5 Assessing the Risks and Potential Losses; The Site Survey and Vulnerability Assessment. 
505 8 |a Construction Plans and the Site VisitSite Survey and Vulnerability Report; The Indispensable After-Action Report; Chapter Points by Discipline; 6 Recovering After the Loss; Planning for the Loss; Action Plan; Advance Arrangements; Mutual Aid Agreements; Additional Personnel; Recovering Reputation; Chapter Points by Discipline; 7 Loss Mitigation Strategies and Tactics; Security Contractor versus Proprietary Security; Selecting Your Security Services Contractor; The Importance of Photographs; The Importance of Camera Systems; The Critical Importance of Lighting; Walking the Site. 
505 8 |a Protectable GroupingMultiple Officer Sites; Chapter Points by Discipline; 8 Gadgets; The Bridge at Apple Valley; Convergence; Cameras; Lighting; Tracking Devices; Fencing and Gates and Other Physical Barriers; Alarms and Motion Detectors; Communication Devices; Security Vehicles; Chapter Points by Discipline; 9 Establishing Standards; Have a Plan; Protectable Grouping; Equipment and Materials Marshalling; Divided Sites; Machinery Security; Materials Storage; Employee Screening; Access Control; Crime Statistics for Construction Sites; Chapter Points by Discipline; 10 Construction Equipment 101. 
505 8 |a Real Construction People, Please Bear with UsAerial Work Platform; Air Compressor; Arrow Sign; Asphalt Batch Plant; Backhoe; Backhoe Loader; Bidwell Machine; Bobcat; Bulldozer; Cherry Picker or Bucket Lift; Concrete Batch Plant; Concrete (or Cement) Mixer; Concrete (or Cement) Mixer Truck; Dredge; Dump Truck; Excavators; Bucket Wheel Excavator; Compact Excavator; Compactor (Handheld); Compact Track Loader; Dragline Excavator; Long-Reach Excavator; Feller Buncher; Forklift Truck (Forklift); Generator; Grader; Jackhammer; Light Tower; Loader; Paver; Pickup Truck; Pile Driver; Reclaimer. 
520 8 |a Annotation  |b Kevin Carney offers a holistic view of security planning for vulnerable capital projects, providing the strategic and tactical plans needed to protect large areas with a minimum investment in personnel and equipment. 
650 0 |a Construction equipment. 
650 0 |a Securities theft. 
650 6 |a Construction  |x �Equipement.  |0 (CaQQLa)201-0018202 
650 6 |a Vol de valeurs mobili�eres.  |0 (CaQQLa)201-0120899 
650 7 |a construction equipment.  |2 aat  |0 (CStmoGRI)aat300022242 
650 7 |a SOCIAL SCIENCE  |x Criminology.  |2 bisacsh 
650 7 |a Construction equipment  |2 fast  |0 (OCoLC)fst00875912 
650 7 |a Securities theft  |2 fast  |0 (OCoLC)fst01110849 
776 0 8 |i Print version:  |a Carney, Kevin.  |t Securing the Outdoor Construction Site : Strategy, Prevention, and Mitigation.  |d : Elsevier Science, �2015 
856 4 0 |u https://sciencedirect.uam.elogim.com/science/book/9780128023839  |z Texto completo