|
|
|
|
LEADER |
00000cam a2200000Ii 4500 |
001 |
SCIDIR_ocn907924109 |
003 |
OCoLC |
005 |
20231120111953.0 |
006 |
m o d |
007 |
cr cnu|||unuuu |
008 |
150423s2015 ne o 000 0 eng d |
040 |
|
|
|a N$T
|b eng
|e rda
|e pn
|c N$T
|d N$T
|d IDEBK
|d DG1
|d E7B
|d YDXCP
|d CDX
|d COO
|d UMI
|d DEBBG
|d EBLCP
|d DEBSZ
|d OCLCF
|d ESU
|d UAB
|d OCLCQ
|d K6U
|d MERUC
|d STF
|d D6H
|d OCLCQ
|d CEF
|d OCLCQ
|d UKMGB
|d AU@
|d OCLCQ
|d WYU
|d U3W
|d CUY
|d LOA
|d ZCU
|d OTZ
|d ICG
|d COCUF
|d DKC
|d OCLCQ
|d LQU
|d RDF
|d OCLCQ
|d UK7LJ
|d LDP
|d HS0
|d UWK
|d NLE
|d SXB
|d OCLCQ
|d OCLCO
|d OCLCQ
|
015 |
|
|
|a GBB552829
|2 bnb
|
016 |
7 |
|
|a 017166221
|2 Uk
|
019 |
|
|
|a 908074999
|a 910341711
|a 1105174611
|a 1105569336
|a 1156000418
|a 1156930315
|a 1162131451
|a 1165193477
|a 1166186285
|a 1167835521
|a 1171200169
|
020 |
|
|
|a 9780128026014
|q (electronic bk.)
|
020 |
|
|
|a 0128026014
|q (electronic bk.)
|
020 |
|
|
|a 0128023821
|
020 |
|
|
|a 9780128023822
|
020 |
|
|
|z 9780128023822
|
035 |
|
|
|a (OCoLC)907924109
|z (OCoLC)908074999
|z (OCoLC)910341711
|z (OCoLC)1105174611
|z (OCoLC)1105569336
|z (OCoLC)1156000418
|z (OCoLC)1156930315
|z (OCoLC)1162131451
|z (OCoLC)1165193477
|z (OCoLC)1166186285
|z (OCoLC)1167835521
|z (OCoLC)1171200169
|
050 |
|
4 |
|a TA190
|
072 |
|
7 |
|a BUS
|x 082000
|2 bisacsh
|
072 |
|
7 |
|a BUS
|x 041000
|2 bisacsh
|
072 |
|
7 |
|a BUS
|x 042000
|2 bisacsh
|
072 |
|
7 |
|a BUS
|x 085000
|2 bisacsh
|
082 |
0 |
4 |
|a 658.4/04
|2 22
|
100 |
1 |
|
|a Watts, Frank B.,
|e author.
|
245 |
1 |
0 |
|a Configuration management for senior managers :
|b essential product configuration and lifecycle management for manufacturing /
|c Frank B. Watts.
|
264 |
|
1 |
|a Amsterdam :
|b Elsevier :
|b BH,
|c [2015]
|
264 |
|
4 |
|c �2015
|
300 |
|
|
|a 1 online resource
|
336 |
|
|
|a text
|b txt
|2 rdacontent
|
337 |
|
|
|a computer
|b c
|2 rdamedia
|
338 |
|
|
|a online resource
|b cr
|2 rdacarrier
|
588 |
0 |
|
|a Vendor-supplied metadata.
|
505 |
0 |
|
|a Front Cover; Configuration Management for Senior Managers; Copyright; Contents; List of Figures; Preface; Policies and Critical Practices; POLICIES; CRITICAL PRACTICES; PLATINUM POLICY; Chapter One -- Introduction; Chapter Two -- Why CM; THE DIRTY HALF DOZEN; PROCESS SPEED; THROW IT OVER THE WALL; QUALITY CONTROL FOR ENGINEERING; SUMMARY; Chapter Three -- CM System, Where to Start; PROCESS MEASUREMENTS; DISTRIBUTED CM; ORGANIZATION; CHAIN OF COMMAND; CM MANAGER; ISO STANDARDS AND CERTIFICATION; DOD/MILITARY STANDARDS; BEST OF THE BEST PRACTICES; STANDARDS RESPONSIBILITY; PEOPLE REQUIRED.
|
505 |
8 |
|
|a FUNCTION NAMERESPONSIBILITIES; REENGINEER OR CONTINUOUS IMPROVEMENT; PLAN TO IMPROVE; SUMMARY; Chapter Four -- CM and Software; SOFTWARE'S CURRENT CONDITION; MODERN TREND; PROCESS REDESIGN BEFORE SOFTWARE; CM'S ROLL IN SOFTWARE; WHAT CM SHOULD CONTROL-AND NOT; SOFTWARE (SW) AND FIRMWARE (FW) CONTROL; SUMMARY; Chapter Five -- Standard Foundation Blocks; STANDARDS WRITING; GENERAL STANDARDS; ACRONYMS AND DEFINITIONS; PART NUMBERS-SIGNIFICANT OR NOT; CLASS CODING; INTERCHANGEABILITY AND THE PART NUMBER; INTERCHANGEABILITY/PART NUMBER/REV CHANGE; ITEM/DOCUMENT NUMBERING.
|
505 |
8 |
|
|a INTERCHANGEABILITY DISCUSSEDINTERCHANGEABILITY DEFINED; IDEAL PART/DOCUMENT NUMBER; ASSIGNMENT OF PART NUMBER AND REVISION LEVEL; REVISION LEVELS; REVISION CONTROL; PART MARKING; COGNIZANT ENGINEER; APPROVED MANUFACTURERS LIST; DEVIATIONS; SPARE PARTS; PUBLICATIONS; NAMEPLATE/SERIAL NUMBER/LABELS; TRANSMISSIONS TO CUSTOMERS; SUMMARY; Chapter Six -- Signatures on CM Documents; INVOLVEMENT VERSUS SIGNATURE; ONE AUTHOR AND ONE ACCEPTOR; SIGNING THE BOM OR PARTS LIST; JUST IN TIME; WHO OBTAINS SIGNATURES?; QUALITY ASSURANCE ROLE; TECHNICAL RELEASE; SIGNATURE ALTERNATIVES; SUMMARY.
|
505 |
8 |
|
|a Chapter Seven -- Process ImprovementPROCESS SPEED-CASE HISTORY; CASE STUDY CHANGE PROCESS REENGINEERING; PROCESS TIME EXPECTATIONS; TEAMS; CHANGE BOARDS; FORMS; CUSTOMER ORDERS; BACKLOGS/WORK IN PROCESS; AGE REPORTS; SUMMARY; Chapter Eight -- Release Process; ENGINEERING AND COMPANY PHASES; PHASES OF RELEASE; RELEASE IN LEAD TIME; LEAD TIME RELEASE PERFORMANCE; TEAM IN RELEASE; SIGNATURES ON RELEASES; RELEASE PHASE CHART; RULES FOR RELEASE; PRODUCT SPECIFICATION RELEASE; CONTRACT/PLANNING PHASE; DESIGN AND DEVELOPMENT PHASE; PILOT PHASE; PRODUCTION PHASE; OBSOLETE; SOFTWARE RELEASE.
|
505 |
8 |
|
|a RELEASE PROCESS STANDARDSRELEASE METRICS; RELEASE PROCESS QUALITY; RELEASE PROCESS FLOW; RELEASE TIME AND VOLUME MEASUREMENT; SUMMARY; Chapter Nine -- Bill of Material Process; DESIGN DATA; NEW PRODUCT BOM; PRODUCT COST; PLM AND ERP; ONE BOM ENTRY; OPERATIONS BOM DATA; ENGINEERING-FRIENDLY PARTS LIST; BOM CONTENT; STRUCTURING THE BOM; EVOLVE THE BOM; JUST-IN-TIME BOM; STRUCTURING FIRMWARE AND SOFTWARE; FEATURES AND OPTIONS; THE PERFECT BOM; BOM WORK FLOW; BOM STANDARDS; BOM METRICS; SUMMARY; Chapter Ten -- Request for Change Process; SEPARATE REQUEST PROCESS; DOES YOUR REQUEST PROCESS WORK? ; Cost reduction and improvements.
|
520 |
|
|
|a Configuration Management for Senior Managers is written to help managers in product manufacturing and engineering environments identify the ways in which they can� streamline their products and processes through proactive documentation control and product lifecycle management. Experienced consultant Frank Watts gives a practitioner's view tailored to the needs of management, without the textbook theory that can be hard to translate into real-world change.
|
546 |
|
|
|a English.
|
650 |
|
0 |
|a Project management.
|
650 |
|
0 |
|a Configuration management.
|
650 |
|
0 |
|a Manufacturing industries.
|
650 |
|
6 |
|a Gestion de projet.
|0 (CaQQLa)201-0030828
|
650 |
|
6 |
|a Gestion de configurations.
|0 (CaQQLa)201-0277691
|
650 |
|
6 |
|a Industrie manufacturi�ere.
|0 (CaQQLa)201-0063190
|
650 |
|
7 |
|a BUSINESS & ECONOMICS
|x Industrial Management.
|2 bisacsh
|
650 |
|
7 |
|a BUSINESS & ECONOMICS
|x Management.
|2 bisacsh
|
650 |
|
7 |
|a BUSINESS & ECONOMICS
|x Management Science.
|2 bisacsh
|
650 |
|
7 |
|a BUSINESS & ECONOMICS
|x Organizational Behavior.
|2 bisacsh
|
650 |
|
7 |
|a Configuration management.
|2 fast
|0 (OCoLC)fst00874734
|
650 |
|
7 |
|a Manufacturing industries.
|2 fast
|0 (OCoLC)fst01008071
|
650 |
|
7 |
|a Project management.
|2 fast
|0 (OCoLC)fst01078797
|
776 |
0 |
8 |
|i Print version:
|z 9780128026014
|w (OCoLC)907924109
|
856 |
4 |
0 |
|u https://sciencedirect.uam.elogim.com/science/book/9780128023822
|z Texto completo
|