Modern power station practice. Volume 2, Mechanical (Boilers, Fuel- and Ash-handling plant) /
Modern Power Station Practice.
Clasificación: | Libro Electrónico |
---|---|
Autor Corporativo: | |
Formato: | Electrónico eBook |
Idioma: | Inglés |
Publicado: |
Oxford :
Pergamon Press,
1971.
|
Edición: | Second revised and enlarged edition. |
Temas: | |
Acceso en línea: | Texto completo |
Tabla de Contenidos:
- Front Cover; Mechanical (Boilers, Fuel
- and Ash
- Handling Plant); Copyright Page; Table of Contents; LIST OF ILLUSTRATIONS; Chapter 1. Boiler Unit-Furnace and Combustion Equipment; 1.1. Broad Fundamentals of Boiler Design and Factors affecting Selection; 1.2. Influence of Boiler Size on Type of Firing to be Adopted; 1.3. Influence of Nature of Coal on Choice of Firing Equipment; 1.4. P.F. Milling Plant-Types; 1.5. P.F. Burner Types and Location in Furnace; 1.6. Mill/Burner Arrangements; 1.7. Factors affecting Milling Plant Performance; 1.8. Standby Capacity.
- 1.9. Operation and Maintenance Aspects (P.F.)1.10. Initial and R. & M. Costs (P.F.); 1.11. Stoker Firing; 1.12. Arrangements of Oil-handling Plant; 1.13. Oil-burner Types; 1.14. Oil-burner Arrangements, Ignition and Control; 1.15. Operation and Maintenance Aspects (Oil); 1.16. Combustion; 1.17. Furnaces; 1.18. Future Trends; Exercises; Chapter 2. Boiler Unit-Steam and Water Circuits; 2.1. Introduction; 2.2. Disposition of the Heating Surfaces; 2.3. Water-flow Circuits; 2.4. Natural and Assisted Circulation; 2.5. Circulating Pumps; 2.6. Drum Internals; 2.7. Steam Purity; 2.8. Water Capacity.
- 2.9. Once-through Boilers2.10. Supercritical Boilers; 2.11. Furnace Heat Absorption; 2.12. Convection Zone Heat Absorption; 2.13. Arrangement of Tube Banks; 2.14. Heat Transfer inside Tubes; 2.15. Steam Temperature Control; 2.16. Steam Side Pressure Losses; 2.17. Scantlings; 2.18. Water Side or ""On-load"" Corrosion; 2.19. Steam Side Corrosion; 2.20. Boiler Fouling; 2.21. Gas Side Corrosion; 2.22. Requirements for Two-shift Operation; 2.23. Maintenance; 2.24. Future Developments; Appendix A. Heat Transfer for Boiler Tube Bank Design; Appendix B. Boiler Steam Drum Scantling Calculations.
- Chapter 5. Fuel- and Ash-handling Plant5.1. Introduction to Coal-handling Plant; 5.2. Reception; 5.3. Transfer Arrangements; 5.4. Introduction to Oil-handling Plant; 5.5. General Design Considerations; 5.6. Supplying Oil to the Boiler House; 5.7. Safety Precautions; 5.8. Operation and Maintenance of Oil-handling Plant; 5.9. Introduction to Ash- and Dust-handling and Disposal; 5.10. Type of Ash- and Dust-handling Plant; 5.11. Design of Ash-handling Plant; 5.12. Dust-handling Plant; Exercises; References; Contents of Volumes 1-8.