Cargando…

Modern power station practice. Volume 2, Mechanical (Boilers, Fuel- and Ash-handling plant) /

Modern Power Station Practice.

Detalles Bibliográficos
Clasificación:Libro Electrónico
Autor Corporativo: Great Britain. Central Electricity Generating Board
Formato: Electrónico eBook
Idioma:Inglés
Publicado: Oxford : Pergamon Press, 1971.
Edición:Second revised and enlarged edition.
Temas:
Acceso en línea:Texto completo

MARC

LEADER 00000cam a2200000 i 4500
001 SCIDIR_ocn897134088
003 OCoLC
005 20231120111917.0
006 m o d
007 cr cnu---unuuu
008 141201s1971 enkaf ob 000 0 eng d
040 |a OPELS  |b eng  |e rda  |e pn  |c OPELS  |d N$T  |d E7B  |d S4S  |d EBLCP  |d DEBSZ  |d YDXCP  |d MERUC  |d STF  |d OCLCQ  |d VLY  |d OCLCQ  |d OCLCO  |d OCLCQ  |d OCLCO 
019 |a 898101600  |a 948766910  |a 1162064683 
020 |a 9781483279329  |q (electronic bk.) 
020 |a 1483279324  |q (electronic bk.) 
020 |z 9780080160603 
035 |a (OCoLC)897134088  |z (OCoLC)898101600  |z (OCoLC)948766910  |z (OCoLC)1162064683 
050 4 |a TK1191 
072 7 |a TEC  |x 009070  |2 bisacsh 
082 0 4 |a 621.312/13  |2 22 
245 0 0 |a Modern power station practice.  |n Volume 2,  |p Mechanical (Boilers, Fuel- and Ash-handling plant) /  |c published for and on behalf of the Central Electricity Generating Board. 
246 3 0 |a Mechanical (Boilers, Fuel- and Ash-handling plant) 
250 |a Second revised and enlarged edition. 
264 1 |a Oxford :  |b Pergamon Press,  |c 1971. 
300 |a 1 online resource (xix, 432 pages, 14 leaves of plates) :  |b illustrations 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
504 |a Includes bibliographical references. 
588 0 |a Print version record. 
505 0 |a Front Cover; Mechanical (Boilers, Fuel -- and Ash -- Handling Plant); Copyright Page; Table of Contents; LIST OF ILLUSTRATIONS; Chapter 1. Boiler Unit-Furnace and Combustion Equipment; 1.1. Broad Fundamentals of Boiler Design and Factors affecting Selection; 1.2. Influence of Boiler Size on Type of Firing to be Adopted; 1.3. Influence of Nature of Coal on Choice of Firing Equipment; 1.4. P.F. Milling Plant-Types; 1.5. P.F. Burner Types and Location in Furnace; 1.6. Mill/Burner Arrangements; 1.7. Factors affecting Milling Plant Performance; 1.8. Standby Capacity. 
505 8 |a 1.9. Operation and Maintenance Aspects (P.F.)1.10. Initial and R. & M. Costs (P.F.); 1.11. Stoker Firing; 1.12. Arrangements of Oil-handling Plant; 1.13. Oil-burner Types; 1.14. Oil-burner Arrangements, Ignition and Control; 1.15. Operation and Maintenance Aspects (Oil); 1.16. Combustion; 1.17. Furnaces; 1.18. Future Trends; Exercises; Chapter 2. Boiler Unit-Steam and Water Circuits; 2.1. Introduction; 2.2. Disposition of the Heating Surfaces; 2.3. Water-flow Circuits; 2.4. Natural and Assisted Circulation; 2.5. Circulating Pumps; 2.6. Drum Internals; 2.7. Steam Purity; 2.8. Water Capacity. 
505 8 |a 2.9. Once-through Boilers2.10. Supercritical Boilers; 2.11. Furnace Heat Absorption; 2.12. Convection Zone Heat Absorption; 2.13. Arrangement of Tube Banks; 2.14. Heat Transfer inside Tubes; 2.15. Steam Temperature Control; 2.16. Steam Side Pressure Losses; 2.17. Scantlings; 2.18. Water Side or ""On-load"" Corrosion; 2.19. Steam Side Corrosion; 2.20. Boiler Fouling; 2.21. Gas Side Corrosion; 2.22. Requirements for Two-shift Operation; 2.23. Maintenance; 2.24. Future Developments; Appendix A. Heat Transfer for Boiler Tube Bank Design; Appendix B. Boiler Steam Drum Scantling Calculations. 
505 8 |a Chapter 5. Fuel- and Ash-handling Plant5.1. Introduction to Coal-handling Plant; 5.2. Reception; 5.3. Transfer Arrangements; 5.4. Introduction to Oil-handling Plant; 5.5. General Design Considerations; 5.6. Supplying Oil to the Boiler House; 5.7. Safety Precautions; 5.8. Operation and Maintenance of Oil-handling Plant; 5.9. Introduction to Ash- and Dust-handling and Disposal; 5.10. Type of Ash- and Dust-handling Plant; 5.11. Design of Ash-handling Plant; 5.12. Dust-handling Plant; Exercises; References; Contents of Volumes 1-8. 
520 |a Modern Power Station Practice. 
546 |a English. 
650 0 |a Electric power-plants  |x Design and construction. 
650 7 |a TECHNOLOGY & ENGINEERING  |x Mechanical.  |2 bisacsh 
650 7 |a Electric power-plants  |x Design and construction  |2 fast  |0 (OCoLC)fst00905658 
710 1 |a Great Britain.  |b Central Electricity Generating Board. 
776 0 8 |i Print version:  |a Great Britain. Central Electricity Generating Board.  |t Modern power station practice.  |b Second revised and enlarged edition  |z 0080160603  |w (DLC) 75086200  |w (OCoLC)761363980 
856 4 0 |u https://sciencedirect.uam.elogim.com/science/book/9780080160603  |z Texto completo