|
|
|
|
LEADER |
00000cam a2200000 i 4500 |
001 |
SCIDIR_ocn881847697 |
003 |
OCoLC |
005 |
20231120111628.0 |
006 |
m o d |
007 |
cr cnu---unuuu |
008 |
140627s1988 enk o 000 0 eng d |
040 |
|
|
|a OPELS
|b eng
|e rda
|e pn
|c OPELS
|d N$T
|d E7B
|d YDXCP
|d OCLCQ
|d EBLCP
|d DEBSZ
|d MERUC
|d OCLCQ
|d UKAHL
|d UAB
|d OCLCQ
|d VLY
|d INARC
|d OCLCQ
|d OCLCO
|d OCLCQ
|d OCLCO
|
019 |
|
|
|a 896795493
|a 1162548174
|
020 |
|
|
|a 9781483135656
|q (electronic bk.)
|
020 |
|
|
|a 1483135659
|q (electronic bk.)
|
020 |
|
|
|z 0434901733
|
020 |
|
|
|z 9780434901739
|
035 |
|
|
|a (OCoLC)881847697
|z (OCoLC)896795493
|z (OCoLC)1162548174
|
050 |
|
4 |
|a TS176
|
072 |
|
7 |
|a TEC
|x 009060
|2 bisacsh
|
072 |
|
7 |
|a TEC
|x 018000
|2 bisacsh
|
072 |
|
7 |
|a TEC
|x 020000
|2 bisacsh
|
072 |
|
7 |
|a TEC
|x 040000
|2 bisacsh
|
082 |
0 |
4 |
|a 670.42
|2 22
|
100 |
1 |
|
|a Bolton, W.
|q (William),
|d 1933-
|
245 |
1 |
0 |
|a Production technology :
|b processes, materials and planning /
|c W. Bolton.
|
264 |
|
1 |
|a London :
|b Heinemann Professional,
|c 1988.
|
300 |
|
|
|a 1 online resource ([280] pages)
|
336 |
|
|
|a text
|b txt
|2 rdacontent
|
337 |
|
|
|a computer
|b c
|2 rdamedia
|
338 |
|
|
|a online resource
|b cr
|2 rdacarrier
|
588 |
0 |
|
|a Print version record.
|
505 |
0 |
|
|a Front Cover; Production Technology: Processes, materials and planning; Copyright Page; Table of Contents; Preface; Part I: Manufacturing Processes; Chapter 1. Forming processes -- metals; 1.1 Introduction; 1.2 Casting; 1.3 Manipulative processes; 1.4 Powder technique; 1.5 Cutting and grinding; 1.6 Metal removal; 1.7 Surface finishes; Problems; Chapter 2. Forming processes -- polymers; 2.1 Polymer materials; 2.2 Forming processes; 2.3 Choosing a process; Problems; Chapter 3. Assembly operations; 3.1 Assembly processes for metals; 3.2 Assembly methods for plastics; 3.3 Assembly operations.
|
505 |
8 |
|
|a 3.4 Limits and fitsProblems; Chapter 4. Automation; 4.1 Numerical control of machine tools; 4.2 Robotics; 4.3 Flexible manufacturing systems (FMS); 4.4 Computer-aided design (CAD); 4.5 Computer-aided manufacture (CAM); Problems; Part II: Engineering Materials; Chapter 5. Properties of materials; 5.1 The tensile test; 5.2 Impact tests; 5.3 Bend tests; 5.4 Hardness measurements; 5.5 Fatigue; 5.6 Creep; 5.7 Corrosion; 5.8 Thermal properties; Problems; Chapter 6. Structure of metals; 6.1 Crystals; 6.2 Plastic deformation of metals; 6.3 Cold working; 6.4 Hot working; 6.5 Cast and wrought products.
|
505 |
8 |
|
|a 6.6 Effect of grain size on propertiesProblems; Chapter 7. Structure of alloys; 7.1 Alloys; 7.2 Solutions; 7.3 Solidification; 7.4 Equilibrium diagrams and solubility; 7.5 Non-equilibrium conditions; 7.6 Precipitation; Problems; Chapter 8. Ferrous alloys; 8.1 Iron alloys; 8.2 The iron-carbon system; 8.3 Critical change points; 8.4 The effect of carbon content; 8.5 Alloy steels; 8.6 Heat treatment of steel; 8.7 Coding systems for steels; 8.8 Cast irons; Problems; Chapter 9. Non-ferrous alloys; 9.1 The range of alloys; 9.2 Aluminium; 9.3 Copper; 9.4 Magnesium; 9.5 Nickel; 9.6 Titanium; Problems.
|
505 |
8 |
|
|a Chapter 10. Non-metals10.1 Polymer structure; 10.2 Thermoplastics; 10.3 Thermosetting polymers; 10.4 Elastomers; 10.5 Thermal, electrical, optical and chemical properties of polymers; 10.6 Ceramics; 10.7 Composites; Problems; Part III: Production Planning; Chapter 11. Production planning and control; 11.1 Introduction; 11.2 Plant layout; 11.3 Maintenance planning; 11.4 Capacity planning; 11.5 Aggregate planning; 11.6 Scheduling; 11.7 Inventory management; 11.8 Materials requirements planning; 11.9 Schedules and loads; 11.10 Network analysis; 11.11 Progressing; 11.12 Production control.
|
505 |
8 |
|
|a ProblemsChapter 12. Quality control; 12.1 Quality; 12.2 Quality control; 12.3 Acceptance sampling; 12.4 Process control; Problems; Chapter 13. Work design; 13.1 Work study; 13.2 Method study; 13.3 Ergonomics; 13.4 Principles of motion economy; 13.5 Job design; 13.6 Health and safety of workers; Problems; Chapter 14. Costing; 14.1 Cost accounting; 14.2 Direct labour costs; 14.3 Direct materials costs; 14.4 Overhead costs; 14.5 Depreciation; 14.6 Job costing; 14.7 Batch costing; 14.8 Process costing; 14.9 Marginal costing; 14.10 Break-even analysis; 14.11 Selection of process; Problems; Index.
|
546 |
|
|
|a English.
|
650 |
|
0 |
|a Production engineering.
|
650 |
|
1 |
|a Production engineering.
|
650 |
|
6 |
|a Technique de la production.
|0 (CaQQLa)201-0030177
|
650 |
|
7 |
|a TECHNOLOGY & ENGINEERING
|x Industrial Engineering.
|2 bisacsh
|
650 |
|
7 |
|a TECHNOLOGY & ENGINEERING
|x Industrial Technology.
|2 bisacsh
|
650 |
|
7 |
|a TECHNOLOGY & ENGINEERING
|x Manufacturing.
|2 bisacsh
|
650 |
|
7 |
|a TECHNOLOGY & ENGINEERING
|x Technical & Manufacturing Industries & Trades.
|2 bisacsh
|
650 |
|
7 |
|a Production engineering
|2 fast
|0 (OCoLC)fst01078282
|
776 |
0 |
8 |
|i Print version:
|a Bolton, W. (William), 1933-
|t Production technology
|z 0434901733
|w (OCoLC)16921992
|
856 |
4 |
0 |
|u https://sciencedirect.uam.elogim.com/science/book/9780434901739
|z Texto completo
|