|
|
|
|
LEADER |
00000cam a2200000Ii 4500 |
001 |
SCIDIR_ocn701840383 |
003 |
OCoLC |
005 |
20231117015007.0 |
006 |
m o d |
007 |
cr |n|---||||| |
008 |
110202s2004 vtua ob 001 0 eng d |
040 |
|
|
|a NRU
|b eng
|e rda
|e pn
|c NRU
|d OCLCQ
|d E7B
|d IDEBK
|d OCLCF
|d YDXCP
|d KNOVL
|d DEBSZ
|d N$T
|d MERUC
|d DEBBG
|d EBLCP
|d OPELS
|d NLGGC
|d ZCU
|d UKDOC
|d MM9
|d OCLCO
|d OCLCQ
|d OCLCO
|d LIP
|d OCLCQ
|d BUF
|d CDN
|d STF
|d D6H
|d CEF
|d RRP
|d AU@
|d OCLCQ
|d LEAUB
|d OCLCO
|d OL$
|d OCLCQ
|d ERF
|d OCLCO
|d UKBTH
|d OCLCQ
|d S2H
|d OCLCO
|d EUN
|d OCLCO
|d OCLCQ
|d INARC
|d OCLCQ
|d OCLCO
|
019 |
|
|
|a 137341252
|a 162590184
|a 171114361
|a 441789333
|a 503558700
|a 647497812
|a 708234815
|a 814451259
|a 856952224
|a 858444446
|a 990758582
|a 1113671812
|
020 |
|
|
|a 9780080480862
|
020 |
|
|
|a 0080480861
|
020 |
|
|
|z 0750650834
|
020 |
|
|
|z 9780750650830
|
035 |
|
|
|a (OCoLC)701840383
|z (OCoLC)137341252
|z (OCoLC)162590184
|z (OCoLC)171114361
|z (OCoLC)441789333
|z (OCoLC)503558700
|z (OCoLC)647497812
|z (OCoLC)708234815
|z (OCoLC)814451259
|z (OCoLC)856952224
|z (OCoLC)858444446
|z (OCoLC)990758582
|z (OCoLC)1113671812
|
050 |
|
4 |
|a TD678
|b .S48 2004eb
|
080 |
|
|
|a 628.2
|
082 |
0 |
4 |
|a 628/.2 22
|
245 |
0 |
0 |
|a Sewers :
|b replacement and new construction /
|c edited by Geoffrey F. Read.
|
264 |
|
1 |
|a Burlington :
|b Elsevier,
|c 2004.
|
300 |
|
|
|a 1 online resource (xii, 574 pages) :
|b illustrations
|
336 |
|
|
|a text
|b txt
|2 rdacontent
|
337 |
|
|
|a computer
|b c
|2 rdamedia
|
338 |
|
|
|a online resource
|b cr
|2 rdacarrier
|
504 |
|
|
|a Includes bibliographical references and index.
|
505 |
0 |
|
|a Front Cover; Title Page; Copyright; Table of Contents; About the Editor; Preface; 1 -- Development of Sewerage Rehabilitation; 2 -- New Construction; 3 -- Site Investigation; 4 -- Site Investigation and Mapping of Buried Assets; 5 -- Traffic Managment and Public Relations; 6 -- Aspects of Sewer Design; 7 -- Open-Cut and Heading Construction; 8 -- Tunnel Construction; 9 -- On-line Sewer Replacement in Tunnel; 10 -- Pipejacking; 11 -- Management of Construction; 12 -- Impact Moling; 13 -- The Pipe Ramming Technique; 14 -- The Pipebursting Technique; 15 -- Horizontal Directional Drilling; 16 -- Vacuum Sewerage.
|
505 |
8 |
|
|a 17 -- Social or Indirect Costs of Public Utility Works18 -- Factors Affecting Choice of Technique; 19 -- Civil Engineering Contract Management; 20 -- Project Management; 21 -- Sewer Safety; 22 -- Contract Supervision; Index.
|
520 |
|
|
|a Sewers: Replacement and New Construction is a detailed guide to the management and construction of new sewer systems. Different construction and replacement techniques, such as jacking, moling and ramming, are described and evaluated. The importance of proper site preparation and management is emphasised, and detailed guidance is given to pre-construction investigation as well as to managing traffic and public relations during the construction period. Geoffrey Read, one of the UK's leading experts on sewer construction, has compiled the most detailed account available on this subject, using mate.
|
588 |
0 |
|
|a Print version record.
|
506 |
|
|
|a Access restricted to Ryerson students, faculty and staff.
|5 CaOTR
|
546 |
|
|
|a English.
|
650 |
|
0 |
|a Sewerage
|x Design and construction.
|
650 |
|
7 |
|a TECHNOLOGY & ENGINEERING
|x Environmental
|x General.
|2 bisacsh
|
650 |
|
7 |
|a Sewerage
|x Design and construction
|2 fast
|0 (OCoLC)fst01114090
|
650 |
|
7 |
|a Abwasserkanal
|2 gnd
|0 (DE-588)4211329-5
|
700 |
1 |
|
|a Read, Geoffrey F.,
|e editor.
|
776 |
0 |
8 |
|i Print version:
|t Sewers.
|d Oxford [England] ; Burlington, MA : Elsevier Butterworth-Heinemann, 2004
|z 0750650834
|w (DLC) 2004040939
|w (OCoLC)54029232
|
856 |
4 |
0 |
|u https://sciencedirect.uam.elogim.com/science/book/9780750650830
|z Texto completo
|