Cargando…

Turnaround management /

Manufacturing and process plants must be regularly closed down for planned maintenance operations. This may entail the complete shutdown and re-start of large-scale serial and batch operations and must be performed in as short a period of time as is cost-effective. This is the process of turnaround,...

Descripción completa

Detalles Bibliográficos
Clasificación:Libro Electrónico
Autor principal: Lenahan, Tom
Formato: Electrónico eBook
Idioma:Inglés
Publicado: Oxford ; Boston, Mass. : Butterworth Heinemann, 1999.
Temas:
Acceso en línea:Texto completo

MARC

LEADER 00000cam a2200000 a 4500
001 SCIDIR_ocn232352529
003 OCoLC
005 20231117015006.0
006 m o d
007 cr cnu---unuuu
008 080620s1999 enka o 001 0 eng d
040 |a N$T  |b eng  |e pn  |c N$T  |d OCLCQ  |d UBY  |d IDEBK  |d E7B  |d OCLCQ  |d MERUC  |d OCLCQ  |d OCLCF  |d NLGGC  |d YDXCP  |d OPELS  |d DEBSZ  |d OCLCQ  |d AGLDB  |d OCLCQ  |d STF  |d VNS  |d D6H  |d OCLCQ  |d VTS  |d OCLCQ  |d LEAUB  |d M8D  |d VLY  |d OCLCO  |d OCLCQ  |d OCLCO 
019 |a 162589885  |a 505068658  |a 646740830  |a 823833328  |a 823902071  |a 824093113  |a 824144301  |a 1035705846  |a 1162233486 
020 |a 9780080519791  |q (electronic bk.) 
020 |a 0080519792  |q (electronic bk.) 
020 |a 1281279714 
020 |a 9781281279712 
020 |a 9786611279714 
020 |a 6611279717 
020 |z 0750642831 
020 |z 9780750642835 
035 |a (OCoLC)232352529  |z (OCoLC)162589885  |z (OCoLC)505068658  |z (OCoLC)646740830  |z (OCoLC)823833328  |z (OCoLC)823902071  |z (OCoLC)824093113  |z (OCoLC)824144301  |z (OCoLC)1035705846  |z (OCoLC)1162233486 
050 4 |a HD69.P75  |b L457 1999eb 
072 7 |a TEC  |x 018000  |2 bisacsh 
072 7 |a TEC  |x 009060  |2 bisacsh 
072 7 |a BUS  |x 087000  |2 bisacsh 
082 0 4 |a 658.5  |2 22 
100 1 |a Lenahan, Tom. 
245 1 0 |a Turnaround management /  |c Tom Lenahan. 
260 |a Oxford ;  |a Boston, Mass. :  |b Butterworth Heinemann,  |c 1999. 
300 |a 1 online resource (vi, 183 pages) :  |b illustrations 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
500 |a Includes index. 
588 0 |a Print version record. 
505 0 |a Front Cover; Turnaround management; Copyright Page; Contents; Preface; Foreword; Acknowledgements; Chapter 1. Turnaround overview: context and strategy; Chapter 2. Initiating the turnaround; Chapter 3. Validating the work scope; Chapter 4. Pre-shutdown work; Chapter 5. Contractor packages; Chapter 6. Planning the turnaround; Chapter 7. The turnaround organization; Chapter 8. Site logistics; Chapter 9. The cost profile; Chapter 10. The safety plan; Chapter 11. The quality plan; Chapter 12. The communications package; Chapter 13. Executing the turnaround; Chapter 14. Terminating the turnaround. 
520 |a Manufacturing and process plants must be regularly closed down for planned maintenance operations. This may entail the complete shutdown and re-start of large-scale serial and batch operations and must be performed in as short a period of time as is cost-effective. This is the process of turnaround, and as the processes are often high value and the maintenance operations intensive, complex and costly, it is vital that it be planned and carried out effectively. Tom Lenahan is an acknowledged expert in this field, who has worked and consulted internationally, and his book will show the maintenan. 
546 |a English. 
650 0 |a Project management. 
650 6 |a Gestion de projet.  |0 (CaQQLa)201-0030828 
650 7 |a TECHNOLOGY & ENGINEERING  |x Industrial Technology.  |2 bisacsh 
650 7 |a TECHNOLOGY & ENGINEERING  |x Industrial Engineering.  |2 bisacsh 
650 7 |a BUSINESS & ECONOMICS  |x Production & Operations Management.  |2 bisacsh 
650 7 |a Project management  |2 fast  |0 (OCoLC)fst01078797 
776 0 8 |i Print version:  |a Lenahan, Tom.  |t Turnaround management.  |d Oxford ; Boston, Mass. : Butterworth Heinemann, 1999  |z 0750642831  |z 9780750642835  |w (DLC) 99034593  |w (OCoLC)41445852 
856 4 0 |u https://sciencedirect.uam.elogim.com/science/book/9780750642835  |z Texto completo