|
|
|
|
LEADER |
00000cam a2200000 i 4500 |
001 |
OR_ocn954283654 |
003 |
OCoLC |
005 |
20231017213018.0 |
006 |
m o d |
007 |
cr |n||||||||| |
008 |
160730s2014 pau o 000 0 eng d |
040 |
|
|
|a EBLCP
|b eng
|e pn
|c EBLCP
|d YDXCP
|d OCLCQ
|d N$T
|d OCLCF
|d MERUC
|d K6U
|d OCLCQ
|d D6H
|d AGLDB
|d OCLCQ
|d COO
|d OCLCQ
|d S9I
|d STF
|d C6I
|d OCLCQ
|d OCLCO
|d OCLCQ
|
019 |
|
|
|a 951337971
|
020 |
|
|
|a 9781628250725
|q (electronic bk.)
|
020 |
|
|
|a 1628250720
|q (electronic bk.)
|
020 |
|
|
|z 1628250429
|
020 |
|
|
|z 9781628250428
|
029 |
1 |
|
|a AU@
|b 000053211255
|
029 |
1 |
|
|a AU@
|b 000062696317
|
029 |
1 |
|
|a DEBBG
|b BV043895068
|
035 |
|
|
|a (OCoLC)954283654
|z (OCoLC)951337971
|
050 |
|
4 |
|a HD30.28
|
072 |
|
7 |
|a BUS
|x 082000
|2 bisacsh
|
072 |
|
7 |
|a BUS
|x 041000
|2 bisacsh
|
072 |
|
7 |
|a BUS
|x 042000
|2 bisacsh
|
072 |
|
7 |
|a BUS
|x 085000
|2 bisacsh
|
082 |
0 |
4 |
|a 658.4012
|2 23
|
049 |
|
|
|a UAMI
|
100 |
1 |
|
|a Biesek, Guilherme,
|e author.
|
245 |
1 |
0 |
|a Building options at project front-end strategizing :
|b the power of capital design for evolvability /
|c Guilherme Bieske, Nuno Gil.
|
260 |
|
|
|a Newtown Square, PA :
|b Project Management Institute,
|c 2014.
|
300 |
|
|
|a 1 online resource (214 pages)
|
336 |
|
|
|a text
|b txt
|2 rdacontent
|
337 |
|
|
|a computer
|b c
|2 rdamedia
|
338 |
|
|
|a online resource
|b cr
|2 rdacarrier
|
347 |
|
|
|a data file
|
588 |
0 |
|
|a Print version record.
|
505 |
0 |
|
|a Title Page; Copyright Page; Table of Contents; Manuscript Summary; Acknowledgements; List of Tables; List of Figures; Chapter 1-Introduction; 1.1 -- Problem Articulation; 1.2 -- Conceptual Context and Research Gap; 1.3 -- Research Purpose, Objectives, and Research Questions; 1.4 -- Manuscript Structure; Chapter 2-Literature Review; 2.1 -- Capital Management of Projects: Integrating Risk Management and Design Flexibility at Front-End Strategizing; 2.2 -- Real Options: Theory and Practice; 2.3 -- Final Considerations; Chapter 3-Research Method; 3.1 -- Research Design.
|
505 |
8 |
|
|a 3.2 -- Research Validity and ReliabilityChapter 4-Exploratory Study: Uncovering Design for Evolvability Practices in Single-Funder Capital Project Environments; 4.1 -- Introduction; 4.2 -- Research Context; 4.3 -- Front-End Strategizing; 4.4 -- Using Options Logic in Capital Design for Evolvability; 4.5 -- Assessing the Flexibility Built-In; 4.6 -- Final Observations; Chapter 5-Design for Evolvability in Multi-Funder Environments: Insights from an Embedded Case Study at Network Rail; 5.2 -- The NR Capital Project Context; 5.3 -- Design for Evolvability in NR Capital Projects.
|
505 |
8 |
|
|a 5.4 -- Final ConsiderationsChapter 6-A Proof-Of-Principle of a Method to Design for Evolvability; 6.1 -- Introduction; 6.2 -- Part 1-Analyzing Options; 6.3 -- Part 2-Designing Alternatives; 6.4 -- Part 3-Project Strategizing; 6.5 -- Design for Evolvability Champion; Chapter 7-A Two-Group Controlled Experiment: Lab-Based Simulation of the Salford Crescent Redevelopment Project; 7.1 -- The Value of Theory-Oriented Experimental Research; 7.2 -- The Purpose of a Lab-Based Simulation of Front-End Strategizing; 7.3 -- Details of the Capital Project Informing the Simulation Experiment.
|
505 |
8 |
|
|a 7.4 -- Generation of Experimental Data7.5 -- Analysis of the Simulation Results; Chapter 8-Final Considerations: Research Implications and Outlook; 8.1 -- Summary; 8.2 -- Contributions to Theory and Practice; 8.3 -- Limitations and Future Research Directions; 8.4 -- Final Considerations; References; Appendices; A -- Interview Protocol; B -- Questionnaire to Assess Overall Satisfaction with the Front-End Strategizing Process; C -- Instructor's Guide; D -- Estimating Volatility from Historical Data; E -- Generic and Bespoke Design Briefs; F -- Route Map for Cross-Pennine, Yorkshire & Humber and North West.
|
505 |
8 |
|
|a G -- TOC Franchises around the Salford Crescent AreaH -- Meeting Agenda; I -- Harvard-Style Case Study.
|
520 |
|
|
|a Based on project risk management concepts, real options theory, and experimental results, this book proposes a framework that will improve the quality of outcomes and increase the project team¿́¿s accountability during the design phase. --
|c Edited summary from book.
|
590 |
|
|
|a O'Reilly
|b O'Reilly Online Learning: Academic/Public Library Edition
|
650 |
|
0 |
|a Strategic planning.
|
650 |
|
0 |
|a Uncertainty.
|
650 |
|
0 |
|a Capital.
|
650 |
|
0 |
|a Requirements engineering.
|
650 |
|
6 |
|a Planification stratégique.
|
650 |
|
6 |
|a Incertitude.
|
650 |
|
6 |
|a Ingénierie des exigences.
|
650 |
|
7 |
|a BUSINESS & ECONOMICS
|x Industrial Management.
|2 bisacsh
|
650 |
|
7 |
|a BUSINESS & ECONOMICS
|x Management.
|2 bisacsh
|
650 |
|
7 |
|a BUSINESS & ECONOMICS
|x Management Science.
|2 bisacsh
|
650 |
|
7 |
|a BUSINESS & ECONOMICS
|x Organizational Behavior.
|2 bisacsh
|
650 |
|
7 |
|a Capital.
|2 fast
|0 (OCoLC)fst00846272
|
650 |
|
7 |
|a Requirements engineering.
|2 fast
|0 (OCoLC)fst01743780
|
650 |
|
7 |
|a Strategic planning.
|2 fast
|0 (OCoLC)fst01134371
|
650 |
|
7 |
|a Uncertainty.
|2 fast
|0 (OCoLC)fst01160832
|
700 |
1 |
|
|a Gil, Nuno,
|e author.
|
776 |
0 |
8 |
|i Print version:
|a Biesek, Guilherme.
|t Building Options at Project Front-End Strategizing: The Power of Capital Design for Evolvability.
|d Newtown Square, PA : Project Management Institute, ©2014
|z 9781628250428
|
856 |
4 |
0 |
|u https://learning.oreilly.com/library/view/~/9781628250725/?ar
|z Texto completo (Requiere registro previo con correo institucional)
|
938 |
|
|
|a EBL - Ebook Library
|b EBLB
|n EBL4603782
|
938 |
|
|
|a EBSCOhost
|b EBSC
|n 1244299
|
938 |
|
|
|a YBP Library Services
|b YANK
|n 13017611
|
994 |
|
|
|a 92
|b IZTAP
|