Cargando…

Site reliability engineering : How Google runs production systems /

In this collection of essays and articles, key members of Google's Site Reliability Team explain how and why their commitment to the entire lifecycle has enabled the company to successfully build, deploy, monitor, and maintain some of the largest software systems in the world.

Detalles Bibliográficos
Clasificación:Libro Electrónico
Otros Autores: Beyer, Betsy (Editor ), Jones, Chris, Petoff, Jennifer, Murphy, Niall Richard
Formato: Electrónico eBook
Idioma:Inglés
Publicado: Sebastopol, CA : O'Reilly Media, 2016.
Temas:
Acceso en línea:Texto completo (Requiere registro previo con correo institucional)

MARC

LEADER 00000cam a2200000 i 4500
001 OR_ocn945577030
003 OCoLC
005 20231017213018.0
006 m o d
007 cr cnu|||unuuu
008 160325s2016 cau ob 001 0 eng d
040 |a N$T  |b eng  |e rda  |e pn  |c N$T  |d YDXCP  |d N$T  |d IDEBK  |d TEFOD  |d UMI  |d OCLCF  |d OCC  |d CDX  |d KSU  |d DEBSZ  |d DEBBG  |d EBLCP  |d OCLCQ  |d COO  |d HCO  |d UOK  |d CEF  |d NTG  |d WYU  |d C6I  |d UAB  |d UKAHL  |d NJT  |d OCLCQ  |d MM9  |d OCLCO  |d OCLCQ  |d OCLCO  |d ORMDA 
019 |a 945736622  |a 1172184445 
020 |a 9781491951187  |q (electronic bk.) 
020 |a 1491951184  |q (electronic bk.) 
020 |a 9781491951170  |q (electronic bk.) 
020 |a 1491951176  |q (electronic bk.) 
020 |z 9781491929124 
029 1 |a AU@  |b 000066233243 
029 1 |a DEBBG  |b BV043969151 
029 1 |a DEBSZ  |b 480366454 
029 1 |a GBVCP  |b 858775573 
029 1 |a AU@  |b 000073551030 
035 |a (OCoLC)945577030  |z (OCoLC)945736622  |z (OCoLC)1172184445 
037 |a 44B89DBE-A3D2-4FC8-8EFB-1AE11B6B1BCB  |b OverDrive, Inc.  |n http://www.overdrive.com 
037 |a 9781491929117  |b O'Reilly Media 
050 4 |a TS173 
072 7 |a TEC  |x 009000  |2 bisacsh 
072 7 |a TEC  |x 035000  |2 bisacsh 
082 0 4 |a 620.00452  |2 23 
049 |a UAMI 
245 0 0 |a Site reliability engineering :  |b How Google runs production systems /  |c edited by Betsy Beyer ... and others. 
264 1 |a Sebastopol, CA :  |b O'Reilly Media,  |c 2016. 
300 |a 1 online resource 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
504 |a Includes bibliographical references and index. 
588 0 |a Vendor-supplied metadata. 
505 0 |a Cover; Copyright; Table of Contents; Foreword; Preface; Conventions Used in This Book; Using Code Examples; O'Reilly Safari; How to Contact Us; Acknowledgments; Part I. Introduction; Chapter 1. Introduction; The Sysadmin Approach to Service Management; Google's Approach to Service Management: Site Reliability Engineering; Tenets of SRE; Ensuring a Durable Focus on Engineering; Pursuing Maximum Change Velocity Without Violating a Service's SLO; Monitoring; Emergency Response; Change Management; Demand Forecasting and Capacity Planning; Provisioning; Efficiency and Performance 
505 8 |a The End of the BeginningChapter 2. The Production Environment at Google, from the Viewpoint of an SRE; Hardware; System Software That "Organizes" the Hardware; Managing Machines; Storage; Networking; Other System Software; Lock Service; Monitoring and Alerting; Our Software Infrastructure; Our Development Environment; Shakespeare: A Sample Service; Life of a Request; Job and Data Organization; Part II. Principles; Chapter 3. Embracing Risk; Managing Risk; Measuring Service Risk; Risk Tolerance of Services; Identifying the Risk Tolerance of Consumer Services 
505 8 |a Identifying the Risk Tolerance of Infrastructure ServicesMotivation for Error Budgets1An early version of this section appeared as an article in ; login: (August 2015, vol. 40, no. 4).; Forming Your Error Budget; Benefits; Chapter 4. Service Level Objectives; Service Level Terminology; Indicators; Objectives; Agreements; Indicators in Practice; What Do You and Your Users Care About?; Collecting Indicators; Aggregation; Standardize Indicators; Objectives in Practice; Defining Objectives; Choosing Targets; Control Measures; SLOs Set Expectations; Agreements in Practice 
505 8 |a Chapter 5. Eliminating ToilToil Defined; Why Less Toil Is Better; What Qualifies as Engineering?; Is Toil Always Bad?; Conclusion; Chapter 6. Monitoring Distributed Systems; Definitions; Why Monitor?; Setting Reasonable Expectations for Monitoring; Symptoms Versus Causes; Black-Box Versus White-Box; The Four Golden Signals; Worrying About Your Tail (or, Instrumentation and Performance); Choosing an Appropriate Resolution for Measurements; As Simple as Possible, No Simpler; Tying These Principles Together; Monitoring for the Long Term; Bigtable SRE: A Tale of Over-Alerting 
505 8 |a Gmail: Predictable, Scriptable Responses from HumansThe Long Run; Conclusion; Chapter 7. The Evolution of Automation at Google; The Value of Automation; Consistency; A Platform; Faster Repairs; Faster Action; Time Saving; The Value for Google SRE; The Use Cases for Automation; Google SRE's Use Cases for Automation; A Hierarchy of Automation Classes; Automate Yourself Out of a Job: Automate ALL the Things!; Soothing the Pain: Applying Automation to Cluster Turnups; Detecting Inconsistencies with Prodtest; Resolving Inconsistencies Idempotently; The Inclination to Specialize 
520 |a In this collection of essays and articles, key members of Google's Site Reliability Team explain how and why their commitment to the entire lifecycle has enabled the company to successfully build, deploy, monitor, and maintain some of the largest software systems in the world. 
590 |a O'Reilly  |b O'Reilly Online Learning: Academic/Public Library Edition 
610 2 0 |a Google (Firm) 
610 2 7 |a Google (Firm)  |2 fast 
650 0 |a Reliability (Engineering) 
650 0 |a Computer engineering. 
650 6 |a Fiabilité. 
650 6 |a Ordinateurs  |x Conception et construction. 
650 7 |a TECHNOLOGY & ENGINEERING  |x Engineering (General)  |2 bisacsh 
650 7 |a TECHNOLOGY & ENGINEERING  |x Reference.  |2 bisacsh 
650 7 |a Computer engineering  |2 fast 
650 7 |a Reliability (Engineering)  |2 fast 
700 1 |a Beyer, Betsy,  |e editor. 
700 1 |a Jones, Chris. 
700 1 |a Petoff, Jennifer. 
700 1 |a Murphy, Niall Richard. 
776 0 8 |i Print version:  |a Site reliability engineering  |d Beijing : O'Reilly, 2016  |h xxiv, 524 Seiten 
856 4 0 |u https://learning.oreilly.com/library/view/~/9781491929117/?ar  |z Texto completo (Requiere registro previo con correo institucional) 
938 |a Askews and Holts Library Services  |b ASKH  |n AH30618889 
938 |a Askews and Holts Library Services  |b ASKH  |n AH30618890 
938 |a Coutts Information Services  |b COUT  |n 34239035 
938 |a ProQuest Ebook Central  |b EBLB  |n EBL4543978 
938 |a EBSCOhost  |b EBSC  |n 1204854 
938 |a ProQuest MyiLibrary Digital eBook Collection  |b IDEB  |n cis34239035 
938 |a YBP Library Services  |b YANK  |n 12904057 
994 |a 92  |b IZTAP