Plant design and operations /
This book provides practical guidance on the design, operation, and maintenance of process facilities to managers, engineers, operators, and maintenance specialists. It is supported by useful, real-world examples and experience from a wide range of facilities and industries and includes guidance on...
Clasificación: | Libro Electrónico |
---|---|
Autor principal: | |
Formato: | Electrónico eBook |
Idioma: | Inglés |
Publicado: |
Waltham, Massachusetts ; Oxford, England :
GPP,
2015.
|
Colección: | Engineering professional collection
|
Temas: | |
Acceso en línea: | Texto completo (Requiere registro previo con correo institucional) |
Tabla de Contenidos:
- Front Cover; Plant Design and Operations; Copyright Page; Contents; 1 Operations; Introduction; Professional Advice; Regulations, Standards, and Guidance; Regulations; Industry Standards; ISO; ANSI; Guidance Documents; Units of Measurement; Risk Reduction; Risk Analysis; Quantification; Flammable and Combustible Materials; Flammable Range; Flammable Limits; Flash Point; Combustible Liquids; Class II liquids; Class III liquids; Flammable Liquids; Ignition Sources; Area Classification; Housekeeping; General Neatness; Proper Placement; Grass and Brush; Equipment and Piping.
- Storage and Handling of Flammable LiquidsRegulations and standards; Handling requirements; Nonprocess Operations; Outside Storage; Coal and Coke Storage; Drum Storage; Drainage; Fire Protection and Prevention; Cylinders; Loading Racks; Simultaneous Operations; Managing SIMOPs; SIMOPs Matrix; Conducting the SIMOPs; Kickoff meeting; Communication meetings; Closeout; Examples; Example 1-Facility Design; Example 2-Heat Exchanger; 2 Maintenance and inspection; Introduction; Types of maintenance; Repair Maintenance; Condition-Based Maintenance; Scheduled Maintenance.
- Reliability-Centered MaintenanceMaintenance task organization; Step 1-Plan the Work; Step 2-Conduct a JHA; Step 3-Issue a Work Permit; Step 4-Shutdown and Isolate Equipment; Step 5-First Break; Step 6-Perform the Work; Step 7-Close Out the Work/Permit; Step 8-Handover to Operations; Readiness review; Mechanical completion; Physically complete and clean; Tight; Inspected, tested, and documented; Pressure tests; Maximum Allowable Working Pressure; Test Medium; Tightness Tests; Strength Tests; Testing Procedures; Hydrostatic (liquid); Pneumatic (gas); Installing blinds; Pressure Test Manual.
- Online cleaning and repairInspection; Regulations and Standards; Inspection Frequency; Inspection Records; Risk-Based Inspection; Analyze risk; Spare Parts; Determine costs; Allocate resources; 3 Energy control procedures; Introduction; Regulations and standards; OSHA 29 CFR 1910.119; OSHA 29 CFR 1910.146; API 2015; API 2026; API 2217A; ANSI Z117.1; Removal of the hazard; Equipment and piping; Venting and Draining Requirements; Manways; Electrical Equipment; Mechanical Equipment; Pipe Plugs; Minimizing contact with air; Limiting Oxygen Concentration; Blanketing; Tank Filling and Emptying.
- Heavy Sludge DepositsSpills and Overflows; Flame Propagation Through Drains; Catching Samples; Air-Blowing of Hydrocarbon Lines; Positive isolation; Level 1-Closed Valve; Control valves; Blowdown valves; Shutdown valves (offshore); Level 2-Closed Valve with Open Bleeder; Level 3-Double Block and Bleed; Level 4-Block and Bleed with Line Break; Level 5-Block, Bleed, and Spectacle Blind; Level 6-Double Block and Bleed with Blind; Level 7-Double Block and Bleed with Line Break; Lockout/tagout; Group Lockout; Lockboxes; Car Seals; Padlocks; Tags; Removing Locks and Tags; Electrical Isolation.