Cargando…

Lean management system LMS:2012 : a framework for continual lean improvement /

"The success of a Lean manufacturing program depends far more on organization-wide leverage of Lean manufacturing tools than it does on the tools themselves. To this the organization must add the human relations aspects that earn buy-in and engagement by all members of the workforce, to the ext...

Descripción completa

Detalles Bibliográficos
Clasificación:Libro Electrónico
Autor principal: Levinson, William A., 1957-
Formato: Electrónico eBook
Idioma:Inglés
Publicado: Boca Raton : CRC Press, ©2013.
Temas:
Acceso en línea:Texto completo (Requiere registro previo con correo institucional)

MARC

LEADER 00000cam a2200000Ia 4500
001 OR_ocn802261803
003 OCoLC
005 20231017213018.0
006 m o d
007 cr cnu---unuuu
008 120730s2013 flua ob 001 0 eng d
010 |a  2012017891 
040 |a N$T  |b eng  |e pn  |c N$T  |d VPI  |d TXA  |d E7B  |d YDXCP  |d OCLCQ  |d B24X7  |d OCLCF  |d UMI  |d CAUOI  |d COO  |d CDX  |d UAB  |d IDEBK  |d BWS  |d CRCPR  |d EBLCP  |d DEBSZ  |d OCLCQ  |d MOR  |d IDB  |d PIFBY  |d OTZ  |d OCLCQ  |d MERUC  |d OCLCQ  |d U3W  |d ERL  |d OCLCQ  |d CEF  |d NLE  |d AU@  |d OCLCQ  |d XC$  |d UKMGB  |d S9I  |d UKAHL  |d OCLCQ  |d LEAUB  |d VT2  |d EYM  |d OCLCO  |d OCLCQ  |d OCLCO 
015 |a GBB7A1397  |2 bnb 
016 7 |a 018373204  |2 Uk 
019 |a 804665531  |a 810039623  |a 816678836  |a 880575204  |a 889581293  |a 988442302  |a 991987462  |a 994896593  |a 1031052275  |a 1058097885  |a 1063630244  |a 1086521788  |a 1156362112  |a 1192349648  |a 1240513483 
020 |a 9781466505384  |q (electronic bk.) 
020 |a 1466505389  |q (electronic bk.) 
020 |a 9781466575790 
020 |a 1466575794 
020 |z 9781466505377 
020 |z 1466505370 
020 |z 9781138434769 
020 |a 1138434760 
020 |a 9781138434769 
024 7 |a 10.1201/b12529  |2 doi 
029 1 |a AU@  |b 000050065990 
029 1 |a AU@  |b 000053284649 
029 1 |a AU@  |b 000060649710 
029 1 |a DEBBG  |b BV042742133 
029 1 |a DEBSZ  |b 397356625 
029 1 |a GBVCP  |b 73876504X 
029 1 |a NZ1  |b 14687476 
029 1 |a NZ1  |b 14697629 
029 1 |a NZ1  |b 14934277 
029 1 |a UKMGB  |b 018373204 
029 1 |a AU@  |b 000070744042 
035 |a (OCoLC)802261803  |z (OCoLC)804665531  |z (OCoLC)810039623  |z (OCoLC)816678836  |z (OCoLC)880575204  |z (OCoLC)889581293  |z (OCoLC)988442302  |z (OCoLC)991987462  |z (OCoLC)994896593  |z (OCoLC)1031052275  |z (OCoLC)1058097885  |z (OCoLC)1063630244  |z (OCoLC)1086521788  |z (OCoLC)1156362112  |z (OCoLC)1192349648  |z (OCoLC)1240513483 
037 |a CL0500000433  |b Safari Books Online 
050 4 |a TS155  |b .L3673 2012eb 
072 7 |a BUS  |x 087000  |2 bisacsh 
072 7 |a TEC  |x 009060  |2 bisacsh 
072 7 |a TEC  |x 018000  |2 bisacsh 
082 0 4 |a 658.5/33  |2 23 
084 |a BUS000000  |a BUS053000  |a TEC020000  |2 bisacsh 
049 |a UAMI 
100 1 |a Levinson, William A.,  |d 1957- 
245 1 0 |a Lean management system LMS:2012 :  |b a framework for continual lean improvement /  |c William A. Levinson. 
260 |a Boca Raton :  |b CRC Press,  |c ©2013. 
300 |a 1 online resource (xii, 189 pages) :  |b illustrations 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
347 |a data file  |2 rda 
520 |a "The success of a Lean manufacturing program depends far more on organization-wide leverage of Lean manufacturing tools than it does on the tools themselves. To this the organization must add the human relations aspects that earn buy-in and engagement by all members of the workforce, to the extent that workers will react immediately and decisively to the presence of waste. The synergy of the human and technological aspects of Lean form what Henry Ford called a universal code for the achievement of world-class results in any enterprise, and which he put into practice to deliver unprecedented bottom line results. This book expands upon and systemizes this universal code into a structure or framework that promotes organizational self-audits and continuous improvement. The book's first section offers a foundation of four simple but comprehensive Lean key performance indicators (KPIs): waste of the time of things (as in cycle time), waste of the time of people, waste of energy, and waste of materials. The Toyota Production System's seven wastes are all measurable in terms of these four KPIs, which also cover the key metrics of Eliyahu Goldratt's Theory of Constraints: throughput, inventory, and operating expense. The first section then adds a proactive improvement cycle that sets out to look for trouble by isolating processes for analytical purposes and then measuring (and balancing) inputs with outputs to force all wastes to become visible. It is in fact technically impossible for any waste of material or energy to hide from what chemical engineers call a material and energy balance. Application of this book's content should therefore satisfy most provisions of the ISO 14001 environmental management system standard and the new ISO 50001 energy management system standard. The second section consists of an unofficial (and therefore customizable) standard against which the organization can audit its Lean management system. The unofficial standard is designed to be compatible with ISO 9001:2008 so internal auditors can assess both systems simultaneously. Each provision includes numerous examples of questions that promote audits in a narrative form as opposed to yes/no checklists or Likert scale ratings. The unofficial standard can also be downloaded (without the assessment questions) from the publisher's Web site. The third section elaborates in detail on the second and provides numerous real-world examples of applications"--  |c Provided by publisher. 
504 |a Includes bibliographical references and index. 
588 0 |a Print version record. 
505 0 |a Section 1. Overview -- section 2. LMS : 2012 -- section 3. Details and expanded explanation. 
546 |a English. 
590 |a O'Reilly  |b O'Reilly Online Learning: Academic/Public Library Edition 
650 0 |a Lean manufacturing. 
650 0 |a Continuous improvement process. 
650 0 |a Costs, Industrial. 
650 6 |a Production allégée. 
650 6 |a Amélioration continue. 
650 6 |a Coût de production. 
650 7 |a BUSINESS & ECONOMICS  |x General.  |2 bisacsh 
650 7 |a BUSINESS & ECONOMICS  |x Quality Control.  |2 bisacsh 
650 7 |a TECHNOLOGY & ENGINEERING  |x Manufacturing.  |2 bisacsh 
650 7 |a BUSINESS & ECONOMICS  |x Production & Operations Management.  |2 bisacsh 
650 7 |a TECHNOLOGY & ENGINEERING  |x Industrial Engineering.  |2 bisacsh 
650 7 |a TECHNOLOGY & ENGINEERING  |x Industrial Technology.  |2 bisacsh 
650 7 |a Continuous improvement process  |2 fast 
650 7 |a Costs, Industrial  |2 fast 
650 7 |a Lean manufacturing  |2 fast 
776 0 8 |i Print version:  |a Levinson, William A., 1957-  |t Lean management system LMS:2012.  |d Boca Raton : CRC Press, 2012  |z 9781466505377  |w (DLC) 2012017891  |w (OCoLC)756596240 
856 4 0 |u https://learning.oreilly.com/library/view/~/9781466505384/?ar  |z Texto completo (Requiere registro previo con correo institucional) 
938 |a Askews and Holts Library Services  |b ASKH  |n AH24089294 
938 |a Books 24x7  |b B247  |n bkb00047262 
938 |a Coutts Information Services  |b COUT  |n 26434705 
938 |a CRC Press  |b CRCP  |n PDP0KE16063PDF 
938 |a EBL - Ebook Library  |b EBLB  |n EBL981558 
938 |a ebrary  |b EBRY  |n ebr10582657 
938 |a EBSCOhost  |b EBSC  |n 470789 
938 |a ProQuest MyiLibrary Digital eBook Collection  |b IDEB  |n cis26434705 
938 |a YBP Library Services  |b YANK  |n 7582601 
994 |a 92  |b IZTAP