Cargando…

Technical Insights from Benchmarking Different Methods for Predicting Pipe Failure Rates in Water Cooled Reactors : Final Report of a Coordinated Research Project.

This publication presents the outcome of an IAEA coordinated research project (CRP) on methodologies for assessing pipe failure rates in advanced water cooled reactors. The goal of the CRP was to provide Member States with a strong technical basis for establishing nuclear power plant piping reliabil...

Descripción completa

Detalles Bibliográficos
Clasificación:Libro Electrónico
Autor principal: IAEA
Autor Corporativo: International Atomic Energy Agency (Autor)
Formato: Electrónico eBook
Idioma:Inglés
Publicado: Vienna : IAEA, 2021.
Colección:IAEA TECDOC Series.
Temas:
Acceso en línea:Texto completo

MARC

LEADER 00000cam a2200000Mi 4500
001 KNOVEL_on1372504010
003 OCoLC
005 20231027140348.0
006 m o d
007 cr cnu||||||||
008 220302s2021 au o ||| 0 eng d
040 |a SFB  |b eng  |e rda  |e pn  |c SFB  |d EBLCP  |d OCLCQ  |d OCLCF 
019 |a 1302011868  |a 1303087336 
020 |a 1523150017 
020 |a 9781523150014 
020 |a 9201410212 
020 |a 9789201410214 
029 1 |a AU@  |b 000074012050 
035 |a (OCoLC)1372504010  |z (OCoLC)1302011868  |z (OCoLC)1303087336 
050 4 |a HD62.15  |b .I584 2021 
082 0 4 |a 658.562  |2 23 
049 |a UAMI 
100 1 |a IAEA. 
110 2 |a International Atomic Energy Agency,  |e author,  |e issuing body. 
245 1 0 |a Technical Insights from Benchmarking Different Methods for Predicting Pipe Failure Rates in Water Cooled Reactors :  |b Final Report of a Coordinated Research Project. 
264 1 |a Vienna :  |b IAEA,  |c 2021. 
264 4 |c Ã2021. 
300 |a 1 online resource (128 pages). 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
490 1 |a IAEA TECDOC Series ;  |v v.1988 
588 |a Description based on publisher supplied metadata and other sources. 
520 |a This publication presents the outcome of an IAEA coordinated research project (CRP) on methodologies for assessing pipe failure rates in advanced water cooled reactors. The goal of the CRP was to provide Member States with a strong technical basis for establishing nuclear power plant piping reliability parameters. To meet this goal two parallel and interrelated activities were carried out. In a first CRP activity, the participating institutions performed a series of benchmark studies. These studies, as described in this publication, were formulated for the purpose of evaluating different methodologies when applied to a common problem. The results were compared, and the reasons for differences were identified. This publication provides a description of the benchmark studies, the participants' individual methodologies applied, and simulations and analyses carried out, an independent synthesis of the results, and the main insights and conclusions from the exercise. 
590 |a Knovel  |b ACADEMIC - Electrical & Power Engineering 
590 |a Knovel  |b ACADEMIC - Mechanics & Mechanical Engineering 
650 0 |a Benchmarking (Management) 
650 0 |a Pipeline failures. 
650 0 |a Water cooled reactors  |x Safety measures. 
650 7 |a Benchmarking (Management)  |2 fast  |0 (OCoLC)fst00830291 
650 7 |a Pipeline failures.  |2 fast  |0 (OCoLC)fst01064623 
650 7 |a Water cooled reactors  |x Safety measures.  |2 fast  |0 (OCoLC)fst01171682 
776 0 8 |i Print version:  |a IAEA  |t Technical Insights from Benchmarking Different Methods for Predicting Pipe Failure Rates in Water Cooled Reactors  |d Vienna : IAEA,c2021  |z 9789201411211 
830 0 |a IAEA TECDOC Series. 
856 4 0 |u https://appknovel.uam.elogim.com/kn/resources/kpTIBDMPP1/toc  |z Texto completo 
938 |a ProQuest Ebook Central  |b EBLB  |n EBL6891124 
994 |a 92  |b IZTAP