Cargando…

Guidance on the development and commissioning of new combined cycle gas turbine (CCGT) plant.

This publication provides good practice for the safe commissioning of 'new build' CCGT plant projects. New build is plant that is being planned or has recently been constructed and being made ready (during the commissioning phase) for operation to an agreed specification and contract. It i...

Descripción completa

Detalles Bibliográficos
Clasificación:Libro Electrónico
Formato: Electrónico eBook
Idioma:Inglés
Publicado: London : Energy Institute, 2019
Edición:First edition.
Temas:
Acceso en línea:Texto completo

MARC

LEADER 00000cam a2200000 i 4500
001 KNOVEL_on1309010944
003 OCoLC
005 20231027140348.0
006 m o d
007 cr bn|||||||||
008 220406s2019 enka o 000 0 eng d
040 |a HUA  |b eng  |e rda  |c HUA  |d OCLCO  |d UAB  |d OCLCF  |d SFB 
020 |a 9781523139583  |q (electronic book) 
020 |a 1523139587  |q (electronic book) 
020 |z 9781787251144  |q (print) 
029 1 |a AU@  |b 000070440422 
035 |a (OCoLC)1309010944 
050 4 |a Internet Access  |b AER 
082 0 4 |a 621.433  |2 23 
049 |a UAMI 
110 2 |a Energy Institute (Great Britain).  |b Technical Team,  |e issuing body. 
245 1 0 |a Guidance on the development and commissioning of new combined cycle gas turbine (CCGT) plant. 
246 3 0 |a New combined cycle gas turbine (CCGT) plant 
246 3 0 |a CCGT plant 
250 |a First edition. 
264 1 |a London :  |b Energy Institute,  |c 2019 
300 |a 1 online resource (170 pages) :  |b illustrations (some color) 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
500 |a "June 2019" 
500 |a "This publication has been produced as a result of work carried out within the Technical Team of the EI"--Title page verso. 
504 |a Includes bibliographical references (pages 162-163) 
520 |a This publication provides good practice for the safe commissioning of 'new build' CCGT plant projects. New build is plant that is being planned or has recently been constructed and being made ready (during the commissioning phase) for operation to an agreed specification and contract. It is intended to provide high-level guidance to the asset owner's/operator's technical management team. The guidance provides a structured approach that can be utilised by the asset owner/operator to manage their project risk and record and report specific project and site knowledge. 
590 |a Knovel  |b ACADEMIC - Electrical & Power Engineering 
650 0 |a Gas-turbine power-plants  |x Management. 
650 6 |a Centrales à turbines à gaz  |x Gestion. 
650 7 |a Gas-turbine power-plants  |x Management.  |2 fast  |0 (OCoLC)fst00938543 
710 2 |a Energy Institute (Great Britain),  |e publisher. 
776 0 8 |i Print version:  |t Guidance on the development and commissioning of new combined cycle gas turbine (CCGT) plant.  |b First edition.  |d London : Energy Institute, 2019  |z 9781787251144 
856 4 0 |u https://appknovel.uam.elogim.com/kn/resources/kpGDCNCCG3/toc  |z Texto completo 
994 |a 92  |b IZTAP