|
|
|
|
LEADER |
00000cam a2200000Mi 4500 |
001 |
KNOVEL_on1274901916 |
003 |
OCoLC |
005 |
20231027140348.0 |
006 |
m d |
007 |
cr ||||||||||| |
008 |
190504s2018 enk o ||| 0 eng d |
040 |
|
|
|a NLW
|b eng
|c NLW
|d SFB
|d OCLCF
|
019 |
|
|
|a 1373991886
|
020 |
|
|
|a 9781787250413
|
020 |
|
|
|a 1787250415
|
029 |
1 |
|
|a AU@
|b 000070440414
|
035 |
|
|
|a (OCoLC)1274901916
|z (OCoLC)1373991886
|
050 |
|
4 |
|a T59.5
|b .E547 2018
|
082 |
0 |
4 |
|a 670.427
|2 23
|
049 |
|
|
|a UAMI
|
245 |
0 |
0 |
|a Guidance on management of third party changes to plant :
|b control systems.
|
250 |
|
|
|a 1.
|
264 |
|
1 |
|a London :
|b Energy Institute,
|c December 2018.
|
300 |
|
|
|a 1 online resource
|
336 |
|
|
|a text
|2 rdacontent
|
337 |
|
|
|a computer
|2 rdamedia
|
338 |
|
|
|a online resource
|2 rdacarrier
|
500 |
|
|
|a The main purpose of this publication is to raise awareness of the risks concerning third party changes to control systems and assist organisations in managing this appropriately.
|
506 |
1 |
|
|a Legal Deposit;
|c Only available on premises controlled by the deposit library and to one user at any one time;
|e The Legal Deposit Libraries (Non-Print Works) Regulations (UK).
|5 WlAbNL
|
540 |
|
|
|a Restricted: Printing from this resource is governed by The Legal Deposit Libraries (Non-Print Works) Regulations (UK) and UK copyright law currently in force.
|5 WlAbNL
|
520 |
|
|
|a The Energy Institute's Power Utility Committee has identified a need for guidance to help operator assurance for the management of change (MoC) of third party implemented changes to plant control systems. Recognising the frequent use of third party support, the committee considers that guidelines on assurance against unauthorised or uncontrolled changes may be beneficial to equipment and plant operators. This is in the context of the legal responsibilities that owners and operators have with regard to the safe operation of their assets. It is considered likely that an owner or operator will have robust MoC processes in place for changes they initiate. This guidance is focused on how these MoC processes may be adapted to address changes initiated and implemented by a third party. This publication has drawn on many existing sources from the public domain, together with input from practitioners from the power utility industry and good practices from other high reliability industries.
|
590 |
|
|
|a Knovel
|b ACADEMIC - Process Design, Control & Automation
|
650 |
|
0 |
|a Automation.
|
650 |
|
7 |
|a Automation.
|2 fast
|0 (OCoLC)fst00822786
|
776 |
|
|
|z 1-78725-042-3
|
856 |
4 |
0 |
|u https://appknovel.uam.elogim.com/kn/resources/kpGMTPCPC2/toc
|z Texto completo
|
994 |
|
|
|a 92
|b IZTAP
|