Cargando…

Planning, design, and implementation for new and upgraded water resource recovery facilities /

Detalles Bibliográficos
Clasificación:Libro Electrónico
Formato: Electrónico eBook
Idioma:Inglés
Publicado: Alexandria, VA : Water Environment Federation, 2021.
Edición:Second edition.
Colección:Manual of practice ; no. 28.
Temas:
Acceso en línea:Texto completo
Tabla de Contenidos:
  • Intro
  • TITLE PAGE
  • COPYRIGHT
  • CONTENTS
  • LIST OF FIGURES
  • LIST OF TABLES
  • PREFACE
  • CHAPTER 1 INTRODUCTION
  • 1.0 PURPOSE OF MANUAL
  • 2.0 USE AND ORGANIZATION OF MANUAL
  • CHAPTER 2 Planning Upgrades to Existing Facilities
  • 1.0 IDENTIFYING THE NEED FOR UPGRADING A WATER RESOURCE RECOVERY FACILITY
  • 2.0 DRIVERS FOR UPGRADING A WATER RESOURCE RECOVERY FACILITY
  • 2.1 REGULATORY REQUIREMENTS
  • 2.1.1 WATER QUALITY REQUIREMENTS AND CHANGES TO WATER QUALITY
  • 2.1.2 VIOLATION OF AN EXISTING PERMIT
  • 2.1.3 CONSENT DECREES OR ORDERS
  • 2.2 GROWTH AND DEVELOPMENT IN THE COMMUNITY
  • 2.3 REGIONALIZATION AND DECENTRALIZATION
  • 2.4 AGING INFRASTRUCTURE
  • 2.5 ASSET RESILIENCE
  • 2.6 MOVING TO RESOURCE RECOVERY
  • 2.6.1 ENERGY CONSERVATION, RECOVERY, AND PRODUCTION
  • 2.6.2 RESOURCE RECOVERY FROM LIQUID STREAM TREATMENT
  • 2.6.3 RESOURCE RECOVERY FROM SOLIDS STREAM TREATMENT
  • 2.7 OTHER DRIVERS
  • 3.0 WHAT IS THE PURPOSE OF FACILITY PLANNING?
  • 4.0 HOW IS A FACILITY PLAN DEVELOPED?
  • 5.0 OWNER'S IN-HOUSE APPROACH
  • 6.0 HOW TO PROCURE AN ENGINEERING FIRM
  • 6.1 THE OWNER'S ROLE IN THE PROCESS
  • 6.2 QUALIFICATIONS-BASED SELECTION CRITERIA
  • 6.2.1 REQUESTS FOR QUALIFICATIONS
  • 6.2.2 INTERVIEW PROCESS
  • 6.3 FINANCIAL CONSIDERATIONS
  • 6.4 SCOPE OF WORK
  • 6.5 FORM OF ESTABLISHING A CONTRACT
  • 7.0 REFERENCES
  • CHAPTER 3 UPGRADING FROM DECENTRALIZED FACILITIES
  • 1.0 INTRODUCTION
  • 2.0 CONSIDERATIONS FOR REGIONALIZATION
  • 2.1 WHO AND WHAT DRIVES THE DECISION
  • 2.2 APPLYING A STEP-WISE DECISION-MAKING PROCESS
  • 3.0 IDENTIFYING AND SECURING A SITE
  • 4.0 WATER RESOURCE RECOVERY CONSIDERATIONS
  • 5.0 SERVICE AREA UPGRADES
  • 6.0 REFERENCES
  • CHAPTER 4 THE FACILITY PLAN
  • 1.0 INTRODUCTION
  • 2.0 PROJECT CHARTERING
  • 2.1 CONSIDERING COMMUNITY AND SUSTAINABILITY
  • 2.2 PLANNING TEAM ENGAGEMENT
  • 2.3 BALANCING ELECTRONIC VERSUS HARD-COPY DOCUMENTATION
  • 2.4 ESTABLISHING SYNERGY WITH ASSET MANAGEMENT
  • 2.5 DEFINING PLANNING DRIVERS
  • 3.0 BASIS OF PLANNING
  • 3.1 PROJECTING FLOWS AND LOADS
  • 3.2 DEFINING EFFLUENT QUALITY CRITERIA
  • 3.3 DESCRIBING AND ASSESSING EXISTING FACILITIES
  • 3.3.1 COLLECTION SYSTEM AND INFLUENT INTERCEPTORS
  • 3.3.2 LIQUID STREAM PROCESSES
  • 3.3.3 SOLIDS STREAM PROCESSES
  • 3.3.4 BIOSOLIDS MANAGEMENT SYSTEMS
  • 3.3.5 SIDESTREAM PROCESSES
  • 3.3.6 ODOR CONTROL PROCESSES AND AIR QUALITY CONSIDERATIONS
  • 3.3.7 SUPPORT FACILITIES
  • 3.3.8 ELECTRICAL, INSTRUMENTATION, AND COMMUNICATION SYSTEMS
  • 3.4 DEVELOPING A TREATMENT CAPACITY BASELINE
  • 3.4.1 HYDRAULIC CAPACITY
  • 3.4.2 PROCESS CAPACITY
  • 3.5 CONSIDERING SITE CONDITIONS AND LAND USE ASPECTS
  • 3.6 CONDITION ASSESSMENT
  • 3.7 EFFLUENT MANAGEMENT CONSIDERATIONS
  • 3.8 BIOSOLIDS MANAGEMENT CONSIDERATIONS
  • 4.0 ALTERNATIVE EXPLORATION, ANALYSIS, AND SELECTION
  • 4.1 DEFINING THE SELECTION APPROACH AND CRITERIA
  • 4.2 DEVELOPING AND EXPLORING ALTERNATIVES
  • 4.3 CONDUCTING INITIAL SCREENING AND FATAL FLAW ANALYSIS
  • 4.4 DEVELOPING INTEGRATED SOLUTIONS AND SHORT-LISTING