Cargando…

North American Tunneling 2020 Proceedings

Detalles Bibliográficos
Clasificación:Libro Electrónico
Otros Autores: Campbell, Brett, Madsen, Paul, Rush, Jim, Preedy, Matthew, Markman, Dawn Dobson
Formato: Electrónico eBook
Idioma:Inglés
Publicado: Littleton : Society for Mining, Metallurgy & Exploration, Incorporated, 2020.
Temas:
Acceso en línea:Texto completo
Tabla de Contenidos:
  • Cover
  • Copyright
  • Contents
  • Preface
  • TRACK 1: TECHNOLOGY
  • Session 1: Ground Support
  • Union Square Market Street Station: Deep Battered Drilled Shafts as Permanent Ground Support
  • Innovative High Durability Non-Steel Fiber Reinforced Segments
  • Jacked Pre-Cast Caisson Shaft Construction Methodologies
  • Session 2: TBM Technology
  • EPBM Proactive Tracking and Progressive Optimization
  • Project Clear: Efficient Hard Rock Tunneling Below St. Louis, Missouri
  • Small Diameter Tunnelling: Limitations and Machine Concepts
  • Using Predictive Modeling for TBM Process Control
  • TBM Hardening and Anti-Wear Implements Against Ground Abrasion
  • Session 3: Innovative Solutions
  • TBMs for Norwegian Small Hydropower Projects
  • Long-Distance Annulus Backfilling of Rehabilitated Sewer Tunnel with Limited Grouting Access
  • Boring a Tunnel Under a Train Station Using Ground Freezing-Line 14-T03-Extension of a Subway Line in Paris (France)
  • An Introduction to Low-Density Cellular Concrete and Advanced Engineered Foam Technology
  • Deep Shaft Sinking Through Limestone, Mudstone, and Halite
  • Altered Tunnel Start Due to Significant Surface Erosion in the Portal Area-A Creative Approach at Tunnel Herrschaftsbuck in Germany
  • Deep Shaft Sinking Through Limestone, Mudstone, and Halite
  • An Introduction to Low-Density Cellular Concrete and Advanced Engineered Foam Technology
  • Boring a Tunnel Under a Train Station Using Ground Freezing-Line 14-T03-Extension of a Subway Line in Paris (France)
  • Long-Distance Annulus Backfilling of Rehabilitated Sewer Tunnel with Limited Grouting Access
  • TBMs for Norwegian Small Hydropower Projects
  • Session 4: Design Innovations
  • Unreinforced Slurry Walls as Temporary Support of Excavation for Circular Shafts
  • How Uncertain Are the Geological-Geotechnical Soil Transition Boundaries?
  • Designing and Implementing Risk Mitigation for Existing Critical Utilities by Means of Construction Sequencing
  • Reaching New Depths: Innovations in Technological Site Characterization Tools for Integrated Tunnel Design and Construction
  • Advancements in Durable Segments for Utility Tunnels
  • Session 5: Digital Technology
  • EPB Shield TBM Automation Using the Autonomous Vehicle Framework
  • Innovative Tools to Control Tunnel Project Risks
  • BIM Implementation in the Design of Underground Structures for the Réseau Express Métropolitain (REM) Project in Canada
  • Settlement Monitoring During Tunneling Using Continuous InSAR and Trend Detection Analysis
  • TRACK 2: PLANNING
  • Session 1: Tunnel Diversity
  • Recent Experience with Bond Market Investors on P3 Project with Tunnel Works
  • Aged Tunnel Rehabilitation Options: Using Geotechnical Techniques to Assess Site Conditions and Provide Modeling Inputs: A Case Study from Detroit