Power plant instrumentation and control handbook : a guide to thermal power plants /
Power Plant Instrumentation and Control Handbook, Second Edition, provides a contemporary resource on the practical monitoring of power plant operation, with a focus on efficiency, reliability, accuracy, cost and safety. It includes comprehensive listings of operating values and ranges of parameters...
Clasificación: | Libro Electrónico |
---|---|
Autores principales: | , |
Formato: | Electrónico eBook |
Idioma: | Inglés |
Publicado: |
London, United Kingdom :
Academic Press, an imprint of Elsevier,
2019.
|
Edición: | Second edition. |
Temas: | |
Acceso en línea: | Texto completo |
Tabla de Contenidos:
- <P><b>I. Introduction </b>1. Introduction; 2. Fundamental Knowledge about Basic Process; 3. Process Parameters and Ranges</p> <p><b>II. Main Equipment </b>1. Overview of Types, Functions, and Description of Main Equipment; 2. Steam Generator: Boiler; 3. Turbine Types; 4. Generator; 5. Boiler Feed Pump and Condensate Extraction Pump with Associated Measurements; 6. Deaerators and Heaters; 7. Function and Description of CW and ACW Systems; 8. Demineralizing Plant's Function and Description; 9. Basic System Functions and Description of Coal Handling; 10. Basic System Functions and Description of ASH Handling</p> <p><b>III. Plant P & ID Discussions </b>1. Introduction (P & ID); 2. Main Steam (P & ID); 3. Reheat Steam (P & IDs): Cold and Hot Reheat; 4. Extraction Steam (P & IDs): Bleed Steam; 5. Auxiliary Steam (P & IDs); 6. Feed Water System (P & ID); 7. Condensate System (P & IDs); 8. Heater Drain and Vent (P & IDs); 9. Air and Flue Gas System (P & IDs); 10. Cogeneration P 11. Miscellaneous Other Systems (P & ID)</p> <p><b>IV. General Instruments </b>1. Introduction; 2. Pressure Measurement: Various Measuring Points and Range Selection; 3. Temperature Measurement: Various Measuring Points and Range Selection; 4. Flow Measurement, Various Measuring Points, Various Types, and Range Selection; 5. Level Measurement</p> <p><b>V. Special Instrument </b>1. Special Instruments; 2. Vibration and Turbovisory Instruments; 3. Gas Analyzers; 4. Steam and Water Analysis System; 5. Sample Conditioning System; 6. Blow Down and Dosing Control; 7. Analyzers for Air Pollution Monitoring and Control (NOX Control)</p> <p><b>VI. Final Control Element </b>1. Valves and Actuators; 2. Control Valve Types; 3. Dampers and Miscellaneous other FCEs; 4. Actuators; 5. Accessories</p> <p><b>VII. Intelligent Control System </b>1. Basics (Discussion on Intelligent Network System); 2. PLC System: Introduction; 3. Annunciation and Sequence of Events: Preamble; 4. Integrated DCS-DDC MIS: Preamble; 5. MMI and Recording: Introduction; 6. MIS: Introduction</p> <p><b>VIII. Boiler Control System </b>1. Basic Control Requirements; 2. Steam Pressure Control with Load Index; 3. Air Flow Control; 4. Fuel Flow Control; 5. Coal Mill Control-Mill Air Flow for TT Boiler; 6. Furnace Draft Control; 7. Drum-Level and Feedwater Controls; 8. Superheater Temperature Control; 9. Reheat Temperature Control; 10. Miscellaneous Boiler Controls, including Overfire Air Dampers; 11. HP-LP Bypass System; 12. Boiler OLCS: Introduction to Interlock and Protection of Boiler BMS, SADC, and SB Control</p> <p><b>IX. Turbo Generator Control System </b>1. Introduction; 2. Electro Hydraulic Governor Control System; 3. Turbine Protection System; 4. ATRS; 5. ATT System; 6. Thermal Stress Evaluator; 7. LPBP System; 8. Turbine Controls: Seal Steam Pressure Control System; 9. Hydrogen Seal Oil System and Differential Pressure Control; 10. Generator Control System; 11. Condenser Level and Deaerator Level Control System; 12. Various TG Options and Miscellaneous TG Controls</p> <p><b>X. Coordinated Control System </b>1. Introduction; 2. Coordinate Control Mode; 3. Turbine Follow Mode; 4. Boiler Follow Mode; 5. Run Back System; 6. Discussions and Explanations</p> <p><b>XI. Balance of Plant Control System </b>1. Balance of Plant: Introduction; 2. BFP Recirculation Control; 3. CEP Recirculation Control; 4. GSC Minimum Flow Control; 5. Deaerator (Pressure) Control; 6. LP Heater Level Control; 7. HP Heater Level Control; 8. Ejector Control and TAS</p> <p><b>XII. Installation Practices </b>1. Introduction; 2. Pipe Valve Fitting Material Specification and Rating; 3. Mechanical Installation of Instruments; 4. Electrical Installation of Instruments</p> <p><b>XIII: Advanced Ultra-Supercritical Thermal Power Plant and Associated Auxiliaries</b></p> <p><b>XIV: Plant safety life cycle and Safety Integrated level</b></p> <p>Appendix I. Process and Mechanical Standard Table; II. Electrical Data and Tables; III. ISA Standard, Materials, Human Engineering, and Control Room; IV. Network Control and Communication; V. Super/Ultra Super Critical Power Plants; VI. Integrated Gasifier and Combined Cycle Plant (Pollution Control); VII. A Few Operational Features of the Unit</p>