Pipelines 2015 : recent advances in underground pipeline engineering and construction : proceedings of the Pipelines 2015 Conference, August 23-26, 2015, Baltimore, Maryland /
Proceedings of Pipelines 2015, held in Baltimore, Maryland, August 23-26, 2015. Sponsored by the Pipelines Division of ASCE. This collection contains 174 peer-reviewed papers on recent advances in underground pipeline engineering and construction. Topics include: trenchless installation; pipeline pl...
Clasificación: | Libro Electrónico |
---|---|
Autores Corporativos: | , |
Otros Autores: | , |
Formato: | Electrónico Congresos, conferencias eBook |
Idioma: | Inglés |
Publicado: |
Reston, Virginia :
American Society of Civil Engineers,
[2015]
|
Temas: | |
Acceso en línea: | Texto completo |
Tabla de Contenidos:
- Sugarloaf Pipeline, Kp41 Tunnel Design and Construction
- Challenges and Rewards of a Successful Compound Curve Microtunnel Drive
- Microtunneling Technology Implemented for the Replacement of an Aging One Mile PCCP 36-inch Force Main to Minimize Environmental Impacts
- Kaw WTP Water Transmission Main : Serving North Lawrence and Beyond
- Permitting Requirements Drive Trenchless Design and Project Risk : An HDD Pressure Pipeline Case History
- HDD Utilized to Complete Key Crossings for Transmission Lines from New Woodbridge Energy Center
- How to Manufacture an Endless Pipe Onsite
- Hitting the Bulls-Eye : How to Cut-In a 108" Outlet to a 108" Vertical Shaft 230' Beneath a Lake
- Alternative Pipe Material Choice Provides Trenchless Solution
- Teamwork in Trenchless Projects : The Martha Lake Gateway Experience
- Experimental Examination of the Mathematical Model for Predicting the Borehole Pressure during Horizontal Directional Drilling
- Victory Pipeline Duchesne County Utah Water Conservancy District
- Big Pipe Tight Quarters : Lessons Learned from Large Diameter Urban Pipelines
- Arching Effects in Box Jacking Projects.
- Pipe Haunching Study Using Non-Linear Finite Element Analysis Including the Use of Soilcrete
- Trenchless Rehabilitation Saves Grottoes, VA, Culverts and Money Without Disrupting Traffic
- Trenchless Technologies Decision Support System Using Integrated Hierarchical Artificial Neural Networks and Genetic Algorithms
- Water Pipeline from Turkey to Cyprus 1,600 mm Diameter Polyethylene 100 Pipeline and Its Flange-Technology Solution
- Make Way for Progress The Challenges of Relocating Large Diameter Water Mains for Light Rail System Expansion
- Under the River and through the Woods : Design and Construction of Two Large Diameter Horizontal Directional Drills for the City of Corpus Christi
- Lessons Learned from Horizontal Directional Drilling Installation of HDPE Sewer Forcemains in Anne Arundel County, Maryland
- HDD River Crossing Improves Reliability of Water System and Meets Growing Demand
- Thermal Contraction Lesson Results in Steel Tunnel Liner Damage
- An Engineer's Guide to Nondestructive Weld Examination
- Streamlining the Submittal Process Do's and Don'ts
- Liquefaction-Induced Differential Settlement and Resulting Loading and Structural Analysis of Buried Steel and Cast Iron Pipelines
- Guidance from Tunnel Impact Analyses for DC Clean Rivers Project : Design Build Bidding to Protect Critical Pipelines
- Seismic Fragility Functions for Sewerage Pipelines.
- Identifying Seismic Vulnerability Factors for Wastewater Pipelines after the Canterbury (NZ) Earthquake Sequence 2010-2011
- Shaking Table Test for Axial Behavior of Buried Inner Rehabilitated Pipes Affected by Aging Pipes in Liquefied Ground
- Design and Fabrication Requirements of a High-Pressure Steel Pipeline
- Analysis of a Steel Pipeline in a Seismically Active Region
- Analysis and Behavior of Steel Pipe Welded Lap Joints in Geohazard Areas
- Performance of Polypropylene Corrugated Pipe in North America
- The Modified Use of the Rehabilitation of Water Mains Manual, AWWA M28 and ASTM F1216, to Design Large Diameter Pressure Pipes Using FRP Systems
- Why Design Engineers Do Not Follow AWWA M9 Chapter 9? Here Are Some Suggestions to Encourage Its Use
- 2014 Updates to ASTM C12
- Numerical Analysis of Pipe-in-Pipe Filled with Various Materials
- Design and Construction Case History South Catamount Transfer Pipeline Float-Sink
- Improved Design and Constructability through Five Installation Methods for One HDPE Pipeline Project
- CSO Projects What Is the Right Solution? A Case Study for South Bend, Indiana
- Deep Water Coastal Stormwater Outfalls : Designing for the Surf Zone
- Fast Track Relief to Midland's Emergency Thirst
- Share the Road : Challenges and Opportunities Facing Joint Pipeline and Roadway Construction Contracts
- Challenges Associated with the Implementation of the Carlsbad Desalination Conveyance System.
- New Day, New Conflict (The Challenges of Water/Wastewater Design for a Multi-Billion Dollar Highway Design-Build Project)
- Ductile Iron or Welded Steel? A Comparative Analysis between Pipe Materials for the Replacement of a Large Diameter Transmission Main
- C303 A Pipe Material in Search of a History and Searching for a Name
- Exploring Use of Large-Diameter HDPE Pipe for Water Main Applications
- It's a Blasting Good Time! Installation of a 30-inch HDPE Transmission Main in a Corrosive Environment, through Rock, under a River, and Adjacent to an Active Failing Pipe
- Evaluation of Corrugated HDPE Pipes Manufactured with Recycled Content underneath Railroads
- Survey of Water Utilities on Their Experiences with Use of Large-Diameter HDPE Pipe for Water Main Applications
- Can a Design Engineer Rely on D/t Ratio as a Rational Indicator to Manage Stresses and Strains in Welded Steel Pipe During Handling?
- Stulling of Large Diameter Steel Water Pipe What It Is and What It Is Not
- Extremely Controlled Rock Blasting Near Critical Pipes Where Mechanical Excavation Is Not Practical
- Completion and Startup of Utah Lake System Pipelines
- Compacting Pipeline Embedment Soils with Saturation and Vibration
- Sayreville Relief Force Main : 10 Years of Monitoring and Proactive Management
- Incorporating GIS-Based Structural Evaluation Tools into Pipeline Asset Management
- Structural Integrity of Damaged Cast Iron Pipelines and Identifying When Damaged Pipes Should be Repaired or Replaced
- Water Resources Integration Program Update : Water Delivery and Operational Flexibility with a 60-inch, 45-mile Pipeline
- Interconnections of the Lakeview Pipeline and Inland Feeder from Concept to Operation in 10 Months.
- Proposed Simplified Changes to ANSI/AWWA C304 Standard for Design of Prestressed Concrete Cylinder Pipe
- Cost Savings Using Optimization Methods for Water Conveyance Systems Case Study for Recharge Fresno Program
- Setting the Record Straight ISO S4 Testing for AWWA C900 Pipe
- Development of a Testing Protocol for Fatigue Testing of Large Diameter HDPE Pipes
- Reduce Diameter, Increase Capacity!
- How to Estimate Flow Area Reduction and Excessive Roughness Effects in Aged Pipelines
- Combating Subsidence by Delivering Surface Water to Three Million Water Users The Successes and On-Going Efforts
- Flow-Based Modeling for Enhancing Seismic Resilience of Water Supply Networks
- Benefits and Lessons Learned from Implementing Real-Time Water Modeling for Jacksonville Electric Authority and Western Virginia Water Authority
- Development of a Wastewater Pipeline Performance Prediction Model
- Pressure and Transient Monitoring of Water Transmission Pipelines and Wastewater Force Mains
- The Link between Transient Surges and Minimum Pressure Criterion in Water Distribution Systems
- Metrics for the Rapid Assessment of Transient Severity in Pipelines.
- Case Study : Hydraulic Modeling and Field Verification on the Rietspruit-Davel-Kriel Bulk Water Supply Pipeline
- Managing Liquid Transients and Vibration within Pump Facilities
- The Need for Holistic System-Wide Transient Assessment
- Modeling Halfway Around the World : Advanced Hydraulic Model Calibration for a Large Utility
- Analyzing Pump Energy through Hydraulic Modeling
- Benefits of PACP® Version 7.0 Update NASSCO
- The Condition Assessment of a 30-inch Ductile Iron Water Line by WaterOne of Johnson County, Kansas
- Developing an Inline Pipe Wall Screening Tool for Assessing and Managing Metallic Pipe
- Comprehensive Condition Assessment of Large Diameter Steel Pipe The Next Chapter in San Diego County Water Authority's Asset Management Program
- The Case for Large Diameter Pipeline Condition Assessment
- Condition Assessment Methods for 1920s Lock-Bar Steel Pipe
- A Look Back : Analyzing the Results of LWC's PCCP Condition Assessment Pilot Projects
- And the Kitchen Sink Using a Full Toolbox to Assess a Critical Bulk Water Asset in South Africa
- Large Diameter Pipeline Asset Management for Sustaining Silicon Valley's Water Needs
- A Repair Program to Minimize Failure Risk of Highly Distressed PCCP Circulating Water Lines
- Condition Assessment of Sanitary Sewer Lines Using Acoustic Inspection
- Development of Performance Index for Stormwater Pipeline Infrastructure.
- Protocol for Water Pipeline Failure and Forensic Data Analysis
- Condition Assessment of Aging, Hard to Access Sewer Mains
- Boston Water and Sewer Commission : Data Integration to Support Asset Management
- Pipeline Asset Integration Planning for a Major Water Supply System : The Southern Delivery System, Colorado Springs, CO
- A Successful CCCP Rehabilitation on Two 96-inch CMP Culverts
- New ASTM Standards to Encourage Wider Use of Laser Profilers and Video Micrometers in Post-Construction Inspection of Pipelines
- Understanding the Benefits of Multi-Sensor Inspection
- Looking Past the Pipe Wall : Quantifying Pipe Corrosion and Deterioration with Pipe Penetrating Radar
- Case Study from Application of High-Resolution Ultra-Wideband Radar for QC/QA Analysis of Trenchless Pipe Rehabilitation and Pipeline Condition Assessment
- Drinking Water Pipelines Defect Coding System
- Capital Planning for Shawnee County, Kansas, the Easy Way
- Assessment of a Critical Raw Water Infrastructure for the City of San Diego El Monte Pipeline Inspection and Condition Assessment Project
- Evaluation of Acoustic Wave Based PCCP Stiffness Testing Results
- Alternative Construction Methods and Pipe Material Provide Solutions for Cleveland WWTP Project
- Padre Island Water Supply Project Minimizes Environmental Impact Using HDD Technology
- Water Mains Degradation Analysis Using Log-Linear Models
- Rehabilitation and Replacement of the East Layton Pipeline.
- Validating "Fully Structural" : Development and Testing of a New Carbon Composite in situ Pressure Barrier for Trenchless Rehabilitation of Small-Diameter Pressure Pipelines
- Integrated Technology Applications for Effective Utility Infrastructure Asset Management
- Beyond Water Audits into Asset Management : The Process of Non-Revenue Water Reduction and Revenue Enhancement Activities
- Fully Structural Renewal of 39-inch PCCP Water Transmission Main with Swagelining(tm) and HDPE
- City of Baltimore SW Diversion 78-in. Diameter PCCP : 2,140 LF Continuous Carbon Fiber Pipe Rehabilitation
- Miami-Dade Implements Hybrid FRP Trenchless Repair System
- Composite versus Stand-Alone Design Methodologies for Carbon Fiber Lining Systems
- Better Data Equals Better Decisions : New Developments in Multi-Sensor Condition Assessment Technologies
- Application and Laboratory Tests of Stainless Steel Liner for Trenchless Rehabilitation of Water Mains in China
- Non-Invasive and Remote Pipeline Rehabilitation Technology Using Reactive and Magnetic Particles
- Engineering Rehabilitations Based on Non-Destructive Examinations
- Asset Management : Performance, Sustainability, and Resiliency Model Development
- Finite Element Modeling of Full-Scale Concrete Manholes under Soil Pressure
- Comparative Analysis of Geopolymer Technology for Sewer System Rehabilitation
- An Evaluation of Trenchless Point Repair Solutions for Pipes of Varying Inner Diameter and Offset Joints
- Effective Repair of Incidental Construction Damage to 54-inch PCCP Line.
- Repairing the World's Largest Prestressed Concrete Pipe : A Case Study of the Central Arizona Project's Centennial Wash Siphon
- Motts Run Dam Outlet Rehabilitation A Case Study Illustrating Design and Construction Aspects
- Design and Construction of a Raw River Water Welded Steel Transmission Main for a New Water Supply System in Northern Virginia
- Lessons Learned in the Design, Manufacture, Shipping, and Installation of the 108-inch Integrated Pipeline (IPL) Section 15-1
- Steel Water Transmission Mains in Liquefiable Soils in Hillsboro, Oregon, Planning Considerations
- Addressing Rehabilitation Challenges for the Underwood Creek Force Main
- Decision-Making Guidance for Culvert Rehabilitation and Replacement Using Trenchless Techniques
- Hot Tapping and Plugging Procedures Enable Replacement of Concrete Pressure Pipelines Reaching the End of Service Life without Service Interruption
- Evaluating Chloramine Loss in Raw Water Supply Pipelines
- Evaluating the Effectiveness of the Sewer Root Control Program for the City of Baltimore
- Performing a Condition Assessment of a 24-inch Diameter Gas Line Supplying an Important Part of a Suburban Area of a Large Midwest City
- Influences on the Rate of Pressure Drop in Automatic Line Break Control Valves on a Natural Gas Pipeline
- More Precise Hydro-Static Test Evaluation of High Pressure Petroleum Pipelines Using Automated Data Collection Techniques
- Maximum Transient Pressures in Batch Pipelines due to Valve Closures
- Electrochemical Impedance Spectroscopy : Characterizing the Performance of Corrosion Protective Pipeline Coatings.
- Watertightness of CFRP Liners for Distressed Pipes
- Oil and Gas Pipeline Technology Finds Uses in the Water and Wastewater Industry
- Strategic Management of AC Pipe in Water Systems
- Pipe Bursting Asbestos Cement Pipe : The Process Is Established but What's Next
- Management of a Pipe of High Concern for Failure : Asbestos Cement Pipes
- A Comparison Study of Water Pipe Failure Prediction Models Using Weibull Distribution and Binary Logistic Regression
- Where are the Hot Zones : Prioritization with Historical Pipe Break
- Minimizing the Risk of Catastrophic Failure of PCCP in the City of Baltimore
- Extending the Life of Existing Pipelines through the Use of a Retrofit Cathodic Protection and Internal Lining Program
- Evaluating Remaining Strength of Thinning and Weakening Lined Cylinder PCCP Force Mains due to Hydrogen Sulfide Corrosion
- Pipelines at Bridge Crossings : Empirical-Based Seismic Vulnerability Index
- Benefits of Global Standards on the Use of Optical Fiber Sensing Systems for the Impact of Construction of New Utilities and Tunnels on Existing Utilities
- Integrated Fiber Optic Sensing System for Pipeline Corrosion Monitoring
- Effects of Ultraviolet (UV) and Thermal Cycling on Polyurethane (PUR) Coated Water Transmission Pipelines
- Development of Constrained Soil Modulus Values for Buried Pipe Design
- The Value of Value Engineering Functionality without Breaking the Bank on a Raw Water Transmission Project in Texas.
- Triple Bottom-Line Assessment of Alternatives for a Large-Diameter Transmission Main from a Congested 280-MGD Water Treatment Plant Site
- Value Engineering of Conveyance System Projects on a Large Wet Weather Program
- Tools for Successful Risk Management of Your Next Underground Project
- Assessing the Condition and Consequence of Failure of Pipes Crossing Major Transportation Corridors
- Risk Model for Large-Diameter Transmission Pipeline Replacement Program
- Understanding Risk and Resilience to Better Manage Water Transmission Systems
- Shifting the Paradigm from Replacement to Management
- Baltimore's First Step towards Advanced Pipeline Management
- Driving the Industry Forward Again : WSSC's Pipeline Management System
- Asset Management Mixing Bowl : Idea Sharing Amongst Owners
- Smart Pipeline Infrastructure Network for Energy and Water (SPINE)
- Developing Design Standards for a New Multi-Agency Regional Water Supply System
- What Pipeline Management Can Do for You A Review of the Costs and Benefits
- Developing a Pre-Certification Process for Using ISI Envision during the Planning Phase of a Pipeline Project
- Picking a Pipeline Route through a Densely Developed Urban Environment : The Challenges Are Not Technical
- DC Water Uses 3D FEM in Assessing Century Old Trunk Sewer
- Wilburton Sewer Improvements No Problems, Just Opportunities to Provide a Toolbox of Engineering Solutions
- Potts Ditch : Rerouting the Impossible.