Cargando…

Pipelines 2015 : recent advances in underground pipeline engineering and construction : proceedings of the Pipelines 2015 Conference, August 23-26, 2015, Baltimore, Maryland /

Proceedings of Pipelines 2015, held in Baltimore, Maryland, August 23-26, 2015. Sponsored by the Pipelines Division of ASCE. This collection contains 174 peer-reviewed papers on recent advances in underground pipeline engineering and construction. Topics include: trenchless installation; pipeline pl...

Descripción completa

Detalles Bibliográficos
Clasificación:Libro Electrónico
Autores Corporativos: Pipelines (Conference) Baltimore, Md.), American Society of Civil Engineers. Pipeline Division (sponsoring body.)
Otros Autores: Sever, V. Firat (Editor ), Osborne, Lynn (Editor )
Formato: Electrónico Congresos, conferencias eBook
Idioma:Inglés
Publicado: Reston, Virginia : American Society of Civil Engineers, [2015]
Temas:
Acceso en línea:Texto completo
Tabla de Contenidos:
  • Sugarloaf Pipeline, Kp41 Tunnel Design and Construction
  • Challenges and Rewards of a Successful Compound Curve Microtunnel Drive
  • Microtunneling Technology Implemented for the Replacement of an Aging One Mile PCCP 36-inch Force Main to Minimize Environmental Impacts
  • Kaw WTP Water Transmission Main : Serving North Lawrence and Beyond
  • Permitting Requirements Drive Trenchless Design and Project Risk : An HDD Pressure Pipeline Case History
  • HDD Utilized to Complete Key Crossings for Transmission Lines from New Woodbridge Energy Center
  • How to Manufacture an Endless Pipe Onsite
  • Hitting the Bulls-Eye : How to Cut-In a 108" Outlet to a 108" Vertical Shaft 230' Beneath a Lake
  • Alternative Pipe Material Choice Provides Trenchless Solution
  • Teamwork in Trenchless Projects : The Martha Lake Gateway Experience
  • Experimental Examination of the Mathematical Model for Predicting the Borehole Pressure during Horizontal Directional Drilling
  • Victory Pipeline Duchesne County Utah Water Conservancy District
  • Big Pipe Tight Quarters : Lessons Learned from Large Diameter Urban Pipelines
  • Arching Effects in Box Jacking Projects.
  • Pipe Haunching Study Using Non-Linear Finite Element Analysis Including the Use of Soilcrete
  • Trenchless Rehabilitation Saves Grottoes, VA, Culverts and Money Without Disrupting Traffic
  • Trenchless Technologies Decision Support System Using Integrated Hierarchical Artificial Neural Networks and Genetic Algorithms
  • Water Pipeline from Turkey to Cyprus 1,600 mm Diameter Polyethylene 100 Pipeline and Its Flange-Technology Solution
  • Make Way for Progress The Challenges of Relocating Large Diameter Water Mains for Light Rail System Expansion
  • Under the River and through the Woods : Design and Construction of Two Large Diameter Horizontal Directional Drills for the City of Corpus Christi
  • Lessons Learned from Horizontal Directional Drilling Installation of HDPE Sewer Forcemains in Anne Arundel County, Maryland
  • HDD River Crossing Improves Reliability of Water System and Meets Growing Demand
  • Thermal Contraction Lesson Results in Steel Tunnel Liner Damage
  • An Engineer's Guide to Nondestructive Weld Examination
  • Streamlining the Submittal Process Do's and Don'ts
  • Liquefaction-Induced Differential Settlement and Resulting Loading and Structural Analysis of Buried Steel and Cast Iron Pipelines
  • Guidance from Tunnel Impact Analyses for DC Clean Rivers Project : Design Build Bidding to Protect Critical Pipelines
  • Seismic Fragility Functions for Sewerage Pipelines.
  • Identifying Seismic Vulnerability Factors for Wastewater Pipelines after the Canterbury (NZ) Earthquake Sequence 2010-2011
  • Shaking Table Test for Axial Behavior of Buried Inner Rehabilitated Pipes Affected by Aging Pipes in Liquefied Ground
  • Design and Fabrication Requirements of a High-Pressure Steel Pipeline
  • Analysis of a Steel Pipeline in a Seismically Active Region
  • Analysis and Behavior of Steel Pipe Welded Lap Joints in Geohazard Areas
  • Performance of Polypropylene Corrugated Pipe in North America
  • The Modified Use of the Rehabilitation of Water Mains Manual, AWWA M28 and ASTM F1216, to Design Large Diameter Pressure Pipes Using FRP Systems
  • Why Design Engineers Do Not Follow AWWA M9 Chapter 9? Here Are Some Suggestions to Encourage Its Use
  • 2014 Updates to ASTM C12
  • Numerical Analysis of Pipe-in-Pipe Filled with Various Materials
  • Design and Construction Case History South Catamount Transfer Pipeline Float-Sink
  • Improved Design and Constructability through Five Installation Methods for One HDPE Pipeline Project
  • CSO Projects What Is the Right Solution? A Case Study for South Bend, Indiana
  • Deep Water Coastal Stormwater Outfalls : Designing for the Surf Zone
  • Fast Track Relief to Midland's Emergency Thirst
  • Share the Road : Challenges and Opportunities Facing Joint Pipeline and Roadway Construction Contracts
  • Challenges Associated with the Implementation of the Carlsbad Desalination Conveyance System.
  • New Day, New Conflict (The Challenges of Water/Wastewater Design for a Multi-Billion Dollar Highway Design-Build Project)
  • Ductile Iron or Welded Steel? A Comparative Analysis between Pipe Materials for the Replacement of a Large Diameter Transmission Main
  • C303 A Pipe Material in Search of a History and Searching for a Name
  • Exploring Use of Large-Diameter HDPE Pipe for Water Main Applications
  • It's a Blasting Good Time! Installation of a 30-inch HDPE Transmission Main in a Corrosive Environment, through Rock, under a River, and Adjacent to an Active Failing Pipe
  • Evaluation of Corrugated HDPE Pipes Manufactured with Recycled Content underneath Railroads
  • Survey of Water Utilities on Their Experiences with Use of Large-Diameter HDPE Pipe for Water Main Applications
  • Can a Design Engineer Rely on D/t Ratio as a Rational Indicator to Manage Stresses and Strains in Welded Steel Pipe During Handling?
  • Stulling of Large Diameter Steel Water Pipe What It Is and What It Is Not
  • Extremely Controlled Rock Blasting Near Critical Pipes Where Mechanical Excavation Is Not Practical
  • Completion and Startup of Utah Lake System Pipelines
  • Compacting Pipeline Embedment Soils with Saturation and Vibration
  • Sayreville Relief Force Main : 10 Years of Monitoring and Proactive Management
  • Incorporating GIS-Based Structural Evaluation Tools into Pipeline Asset Management
  • Structural Integrity of Damaged Cast Iron Pipelines and Identifying When Damaged Pipes Should be Repaired or Replaced
  • Water Resources Integration Program Update : Water Delivery and Operational Flexibility with a 60-inch, 45-mile Pipeline
  • Interconnections of the Lakeview Pipeline and Inland Feeder from Concept to Operation in 10 Months.
  • Proposed Simplified Changes to ANSI/AWWA C304 Standard for Design of Prestressed Concrete Cylinder Pipe
  • Cost Savings Using Optimization Methods for Water Conveyance Systems Case Study for Recharge Fresno Program
  • Setting the Record Straight ISO S4 Testing for AWWA C900 Pipe
  • Development of a Testing Protocol for Fatigue Testing of Large Diameter HDPE Pipes
  • Reduce Diameter, Increase Capacity!
  • How to Estimate Flow Area Reduction and Excessive Roughness Effects in Aged Pipelines
  • Combating Subsidence by Delivering Surface Water to Three Million Water Users The Successes and On-Going Efforts
  • Flow-Based Modeling for Enhancing Seismic Resilience of Water Supply Networks
  • Benefits and Lessons Learned from Implementing Real-Time Water Modeling for Jacksonville Electric Authority and Western Virginia Water Authority
  • Development of a Wastewater Pipeline Performance Prediction Model
  • Pressure and Transient Monitoring of Water Transmission Pipelines and Wastewater Force Mains
  • The Link between Transient Surges and Minimum Pressure Criterion in Water Distribution Systems
  • Metrics for the Rapid Assessment of Transient Severity in Pipelines.
  • Case Study : Hydraulic Modeling and Field Verification on the Rietspruit-Davel-Kriel Bulk Water Supply Pipeline
  • Managing Liquid Transients and Vibration within Pump Facilities
  • The Need for Holistic System-Wide Transient Assessment
  • Modeling Halfway Around the World : Advanced Hydraulic Model Calibration for a Large Utility
  • Analyzing Pump Energy through Hydraulic Modeling
  • Benefits of PACP® Version 7.0 Update NASSCO
  • The Condition Assessment of a 30-inch Ductile Iron Water Line by WaterOne of Johnson County, Kansas
  • Developing an Inline Pipe Wall Screening Tool for Assessing and Managing Metallic Pipe
  • Comprehensive Condition Assessment of Large Diameter Steel Pipe The Next Chapter in San Diego County Water Authority's Asset Management Program
  • The Case for Large Diameter Pipeline Condition Assessment
  • Condition Assessment Methods for 1920s Lock-Bar Steel Pipe
  • A Look Back : Analyzing the Results of LWC's PCCP Condition Assessment Pilot Projects
  • And the Kitchen Sink Using a Full Toolbox to Assess a Critical Bulk Water Asset in South Africa
  • Large Diameter Pipeline Asset Management for Sustaining Silicon Valley's Water Needs
  • A Repair Program to Minimize Failure Risk of Highly Distressed PCCP Circulating Water Lines
  • Condition Assessment of Sanitary Sewer Lines Using Acoustic Inspection
  • Development of Performance Index for Stormwater Pipeline Infrastructure.
  • Protocol for Water Pipeline Failure and Forensic Data Analysis
  • Condition Assessment of Aging, Hard to Access Sewer Mains
  • Boston Water and Sewer Commission : Data Integration to Support Asset Management
  • Pipeline Asset Integration Planning for a Major Water Supply System : The Southern Delivery System, Colorado Springs, CO
  • A Successful CCCP Rehabilitation on Two 96-inch CMP Culverts
  • New ASTM Standards to Encourage Wider Use of Laser Profilers and Video Micrometers in Post-Construction Inspection of Pipelines
  • Understanding the Benefits of Multi-Sensor Inspection
  • Looking Past the Pipe Wall : Quantifying Pipe Corrosion and Deterioration with Pipe Penetrating Radar
  • Case Study from Application of High-Resolution Ultra-Wideband Radar for QC/QA Analysis of Trenchless Pipe Rehabilitation and Pipeline Condition Assessment
  • Drinking Water Pipelines Defect Coding System
  • Capital Planning for Shawnee County, Kansas, the Easy Way
  • Assessment of a Critical Raw Water Infrastructure for the City of San Diego El Monte Pipeline Inspection and Condition Assessment Project
  • Evaluation of Acoustic Wave Based PCCP Stiffness Testing Results
  • Alternative Construction Methods and Pipe Material Provide Solutions for Cleveland WWTP Project
  • Padre Island Water Supply Project Minimizes Environmental Impact Using HDD Technology
  • Water Mains Degradation Analysis Using Log-Linear Models
  • Rehabilitation and Replacement of the East Layton Pipeline.
  • Validating "Fully Structural" : Development and Testing of a New Carbon Composite in situ Pressure Barrier for Trenchless Rehabilitation of Small-Diameter Pressure Pipelines
  • Integrated Technology Applications for Effective Utility Infrastructure Asset Management
  • Beyond Water Audits into Asset Management : The Process of Non-Revenue Water Reduction and Revenue Enhancement Activities
  • Fully Structural Renewal of 39-inch PCCP Water Transmission Main with Swagelining(tm) and HDPE
  • City of Baltimore SW Diversion 78-in. Diameter PCCP : 2,140 LF Continuous Carbon Fiber Pipe Rehabilitation
  • Miami-Dade Implements Hybrid FRP Trenchless Repair System
  • Composite versus Stand-Alone Design Methodologies for Carbon Fiber Lining Systems
  • Better Data Equals Better Decisions : New Developments in Multi-Sensor Condition Assessment Technologies
  • Application and Laboratory Tests of Stainless Steel Liner for Trenchless Rehabilitation of Water Mains in China
  • Non-Invasive and Remote Pipeline Rehabilitation Technology Using Reactive and Magnetic Particles
  • Engineering Rehabilitations Based on Non-Destructive Examinations
  • Asset Management : Performance, Sustainability, and Resiliency Model Development
  • Finite Element Modeling of Full-Scale Concrete Manholes under Soil Pressure
  • Comparative Analysis of Geopolymer Technology for Sewer System Rehabilitation
  • An Evaluation of Trenchless Point Repair Solutions for Pipes of Varying Inner Diameter and Offset Joints
  • Effective Repair of Incidental Construction Damage to 54-inch PCCP Line.
  • Repairing the World's Largest Prestressed Concrete Pipe : A Case Study of the Central Arizona Project's Centennial Wash Siphon
  • Motts Run Dam Outlet Rehabilitation A Case Study Illustrating Design and Construction Aspects
  • Design and Construction of a Raw River Water Welded Steel Transmission Main for a New Water Supply System in Northern Virginia
  • Lessons Learned in the Design, Manufacture, Shipping, and Installation of the 108-inch Integrated Pipeline (IPL) Section 15-1
  • Steel Water Transmission Mains in Liquefiable Soils in Hillsboro, Oregon, Planning Considerations
  • Addressing Rehabilitation Challenges for the Underwood Creek Force Main
  • Decision-Making Guidance for Culvert Rehabilitation and Replacement Using Trenchless Techniques
  • Hot Tapping and Plugging Procedures Enable Replacement of Concrete Pressure Pipelines Reaching the End of Service Life without Service Interruption
  • Evaluating Chloramine Loss in Raw Water Supply Pipelines
  • Evaluating the Effectiveness of the Sewer Root Control Program for the City of Baltimore
  • Performing a Condition Assessment of a 24-inch Diameter Gas Line Supplying an Important Part of a Suburban Area of a Large Midwest City
  • Influences on the Rate of Pressure Drop in Automatic Line Break Control Valves on a Natural Gas Pipeline
  • More Precise Hydro-Static Test Evaluation of High Pressure Petroleum Pipelines Using Automated Data Collection Techniques
  • Maximum Transient Pressures in Batch Pipelines due to Valve Closures
  • Electrochemical Impedance Spectroscopy : Characterizing the Performance of Corrosion Protective Pipeline Coatings.
  • Watertightness of CFRP Liners for Distressed Pipes
  • Oil and Gas Pipeline Technology Finds Uses in the Water and Wastewater Industry
  • Strategic Management of AC Pipe in Water Systems
  • Pipe Bursting Asbestos Cement Pipe : The Process Is Established but What's Next
  • Management of a Pipe of High Concern for Failure : Asbestos Cement Pipes
  • A Comparison Study of Water Pipe Failure Prediction Models Using Weibull Distribution and Binary Logistic Regression
  • Where are the Hot Zones : Prioritization with Historical Pipe Break
  • Minimizing the Risk of Catastrophic Failure of PCCP in the City of Baltimore
  • Extending the Life of Existing Pipelines through the Use of a Retrofit Cathodic Protection and Internal Lining Program
  • Evaluating Remaining Strength of Thinning and Weakening Lined Cylinder PCCP Force Mains due to Hydrogen Sulfide Corrosion
  • Pipelines at Bridge Crossings : Empirical-Based Seismic Vulnerability Index
  • Benefits of Global Standards on the Use of Optical Fiber Sensing Systems for the Impact of Construction of New Utilities and Tunnels on Existing Utilities
  • Integrated Fiber Optic Sensing System for Pipeline Corrosion Monitoring
  • Effects of Ultraviolet (UV) and Thermal Cycling on Polyurethane (PUR) Coated Water Transmission Pipelines
  • Development of Constrained Soil Modulus Values for Buried Pipe Design
  • The Value of Value Engineering Functionality without Breaking the Bank on a Raw Water Transmission Project in Texas.
  • Triple Bottom-Line Assessment of Alternatives for a Large-Diameter Transmission Main from a Congested 280-MGD Water Treatment Plant Site
  • Value Engineering of Conveyance System Projects on a Large Wet Weather Program
  • Tools for Successful Risk Management of Your Next Underground Project
  • Assessing the Condition and Consequence of Failure of Pipes Crossing Major Transportation Corridors
  • Risk Model for Large-Diameter Transmission Pipeline Replacement Program
  • Understanding Risk and Resilience to Better Manage Water Transmission Systems
  • Shifting the Paradigm from Replacement to Management
  • Baltimore's First Step towards Advanced Pipeline Management
  • Driving the Industry Forward Again : WSSC's Pipeline Management System
  • Asset Management Mixing Bowl : Idea Sharing Amongst Owners
  • Smart Pipeline Infrastructure Network for Energy and Water (SPINE)
  • Developing Design Standards for a New Multi-Agency Regional Water Supply System
  • What Pipeline Management Can Do for You A Review of the Costs and Benefits
  • Developing a Pre-Certification Process for Using ISI Envision during the Planning Phase of a Pipeline Project
  • Picking a Pipeline Route through a Densely Developed Urban Environment : The Challenges Are Not Technical
  • DC Water Uses 3D FEM in Assessing Century Old Trunk Sewer
  • Wilburton Sewer Improvements No Problems, Just Opportunities to Provide a Toolbox of Engineering Solutions
  • Potts Ditch : Rerouting the Impossible.