Pipelines 2012 : innovations in design, construction, operations, and maintenance - doing more with less : proceedings of the Pipelines 2012 Conference, August 19-22, 2012, Miami Beach, Florida /

Proceedings of the Pipelines 2012 Conference, held in Miami Beach, Florida, August 19-22, 2012. Sponsored by the Pipeline Division of ASCE. This collection contains 141 papers, each reviewed by at least two reviewers, discussing management, safety, operation, and maintenance issues pertaining to pip...

Descripción completa

Detalles Bibliográficos
Clasificación:Libro Electrónico
Otros Autores: Card, Robert J. (Editor ), Kenny, Michael K. (Editor )
Formato: Electrónico eBook
Idioma:Inglés
Publicado: Reston, Virginia : American Society of Civil Engineers, [2012]
Temas:
Acceso en línea:Texto completo
Tabla de Contenidos:
  • Performance Testing of Underground Storage Tank against Buckling
  • Organizing and Managing the Implementation of Large Diameter Tapping and Plugging Technology for a Major Sanitary Improvement Project in Ho Chi Minh City, Vietnam
  • Ductile Iron Corrosion Theories and Science
  • Design and Development of a Web-Based National Database for Water and Wastewater Pipeline Infrastructure Systems
  • Fatigue of Plastic Water Pipe : A Technical Review with Recommendations for PE4710 Pipe Design Fatigue
  • Novel Resilience Assessment Methodology for Water Distribution Systems
  • Contingency and Emergency : Prior Planning, "Real Live" Execution, and Post Mortem of the Results
  • Water Transmission Main Condition Assessment in the Last Frontier : A Magnanimous Endeavor for the Anchorage Water and Wastewater Utility
  • Protection of Petroleum and Natural Gas Pipelines Crossing Debris Flow Watersheds A Case Study in the Qinling Mountains, Western China
  • Meeting the Challenge of Pipeline Emergency Repair
  • PressureCast Steel Pipe Combined Load Test Set-Up and Execution
  • Unidirectional Flushing (UDF) : It's Not Just about Cleaning the System Anymore Benefits and Advantages that West Springfield, Massachusetts Achieved with Their Program
  • Transmission Main and Plastic Pipe Leak Detection Using Advanced Correlation Technology : Case Studies
  • Installation of a 42 Inch HDPE Pipeline at Seminole County's Regional Water Treatment Facility at Yankee Lake
  • Risk Management in Real Time Transient Control Testing on a Large Conveyance System
  • Integration of HDPE 4710 Materials for Potable Water Distribution Systems
  • Five Years and Counting : The Evolution of WSSC's PCCP Management Program
  • City of Westminster's Sewer Collection System Assessment Program : A Case Study
  • GIS : A Decision Making Tool for Pipeline Asset Management in Atlanta
  • Intake Screen Alternatives for the IPL Project Planning for Mussels and Variable Intake Depths
  • Variability of Pipe Coating Pull-Off Adhesion Measurements on Cylindrical Steel Pipelines
  • Evaluation of Statically-Loaded Large Diameter Steel Pipe Embedded with Lime Stabilized Native Clay Soils
  • Seismic Fragility Evaluation of Water Pipelines : Part 1 Current Practice
  • Galveston's Life Line Considerations When Designing an Aerial Crossing
  • Who Says You Need Multiple Wire Breaks for a PCCP Pipe to Fail?
  • Condition Evaluation of Asbestos Cement Water Mains
  • Numbers Don't Lie : PCCP Performance and Deterioration Based on a Statistical Review of a Decade of Condition Assessment Data
  • From Pilot to Permanent : Evolution of LWC's PCCP Condition Assessment Program
  • A Methodology for Condition Assessment of Pressure Water Mains
  • Implementation of Sustainability Initiatives and the Envision Rating System on the Omaha CSO Program
  • PCCP Condition Assessment Methodology : What Is Right for You?
  • Enhancing Asset Management Priority Ranking A Case Study
  • Condition Assessment of 23 Lift Stations
  • Integrated Monitoring Strategy for Large Diameter Pre-Stressed Concrete Pipelines A Case Study at Waternet, the Netherlands
  • Protecting the Magic City
  • Pilot Large Diameter Pipeline Seismic Fragility Assessment
  • Restoring Water Network Reliability and Control in the City of Baltimore
  • New Approaches to Inspect Water Pipelines Running under Rivers, Lakes, Levies, and Critical Transport Infrastructure
  • Reducing the Cost of Failure : Time is the Unforgiving Enemy during Pipeline Ruptures
  • The Problem of Leakage Detection on Large Diameter Mains
  • Condition Assessment of a Ductile Iron Force Main Using Guided Wave Technology : Case Study of Underwood Creek Force Main, Milwaukee Metropolitan Sewerage District
  • Failure Risk of Bar-Wrapped Pipe with Broken Bars and Corroded Cylinder
  • Sewer Main Condition Assessment in the Last Frontier
  • LRFD Approach to CFRP Renewal of Prestressed Concrete Cylinder Pipes
  • Rehabilitation of Large Diameter PCCP : Relining and Sliplining with Steel Pipe
  • Miami-Dade Case Study : Managing and Minimizing Pipeline Outages through the Use of Carbon Fiber
  • Field Comparison of the Axis Vacuum Microtunneling Technology vs. Open Cut Excavation in Glenview, Illinois.
  • Technology How Far Can We Go?
  • Southeast Collector Trunk Sewer Route Selection : The Regional Municipalities of York and Durham, Ontario, Canada
  • Consideration of Embodied Energy in Sustainability Evaluation of Pipeline Projects
  • Chemical Amendment of Excavated Trench Material for Sustainable Reuse
  • Condition Assessments Using Pipe Penetrating Radar : The Metro Wastewater Reclamation District, Denver, CO Harvard Gulch Interceptor Case Study
  • Route Selection for a $2.2 Billion Pipeline
  • Replacement of a Critical Water Supply Pipeline in a Dense Urban Landscape
  • M-DWASD Design-Build Procurement for Government Cut Pipeline Replacement Project
  • Stockton Delta Water Project Construction Challenges
  • A New Generation of FRP Laminates for Repair of Pipelines in the Gas Industry
  • Design and Construction Challenges for a 36 Inch Diameter 18 Mile Reclaimed Water Pipeline
  • Two Successful Installations of Large Diameter Rigid-Design Concrete Pressure Pipelines in Very Soft Soils
  • Augmenting Owner's Staff with As-Needed Contracts for Large Diameter Pipeline Construction Management
  • Pipeline Infrastructure Renewal at Miami-Dade Water and Sewer Department
  • Delivering a Critical Raw Water Transmission Line Using Design-Build : The Perspective from Gilbert, AZ
  • From Tiny Hole to Huge Problem Overnight Emergency Culvert Pipe Repair
  • Lessons Learned from the Commissioning of a 21,000 HP Pump Station in San Diego
  • Hiding a 96 Inch Pipeline in Your Neighbor's Backyard
  • Pipe Collapse in an Amusement Park Now What Do You Do?
  • San Francisco Public Utilities Commission's Water System Improvement Program : Bay Division Pipeline 5 East Bay Reaches Construction Contract Challenges in a Difficult Economy
  • 60" Demonstration Installation of PressureCast Steel Pipe for the Tarrant Regional Water District
  • Replacing Live Pipelines Planning for Construction Issues and Sequencing Can Keep Your System Up and Running
  • Recycled Water for the Thirsty High Desert
  • Longest Polyurethane Lined and Coated Steel Pipeline in North America : The Provo Reservoir Canal Enclosure Project
  • Experimental Examination of Selected Limit States of Structural Liners at Locations of Ring Fracture
  • Reconstruction in an Urban Environment: Kimberley Lane 8" Water Line HDD and 54" Sanitary Sewer CIPP Rehabilitation
  • Basis of Design for Proposed 42 Inch Reclaimed Water Main
  • Repair of a Punctured 48 in. Diameter Prestressed Concrete Cylinder Pipe on a Sixty Degree Slope
  • Getting Ready for a Larger Panama Canal Assessing a Critical Large Diameter Force Main
  • Buried Flexible Pipes : Deflections and Stresses Caused by an Increase in Soil Cover Highway Crossing
  • Proactive Upgrade of Steel Pipelines during Scheduled Plant Outages
  • Case Study of Productivity Analysis for Horizontal Directional Drilling
  • The Effects of Pipe Stiffness on HDD Pull Loads
  • Sustainable Flowable Fill
  • How to Accelerate Design and Construction for Large Water Supply Projects
  • Collaborative Bidding Approach for the Tollgate Creek Interceptor
  • Three Heads are Better Than One : Efficient Solutions to Achieve the Best Value for a 6 Mile Water Main in an Urban Setting
  • Planning and Modeling Solutions for a Complex Collection System : The Baton Rouge SSO Control and Wastewater Facilities Program
  • Pipe Materials and Joint Selection for Trenchless Construction
  • Classification and Specification of Bedding and Backfill for Buried Pipelines
  • Tangent Outlet Design for Welded Steel Pipe
  • Molecular Design of High Density Polyethylene for Pipes
  • Reinforced Concrete Pipe Design under Extreme Loading Conditions Using ASCE Standard 15-98 and Beyond
  • Untangling the Mysteries of Air Valves
  • Hydraulic Modeling for Emergency Water Supply and Disaster Planning
  • Finite Element Analysis of Combined-Load Performance of PressureCast Steel Pipe
  • Dynamic Behavior of Buried Flexible Pipes of Varying Thickness Using the Shaking Table Test
  • Designing a Critical Interceptor in an Earthquake Prone Floodplain with Limited Access : The Santa Ana River Interceptor Relocation Project
  • Selecting Water Main Materials for the Los Angeles Department of Water and Power.
  • Common and Challenging Questions in Water System Infrastructure Management
  • Emergency Relocation of 20 Inch Sewer Force Main (HDD)
  • Introducing a New Honeycomb-FRP Pipe
  • Structural Design of Buried Pipes
  • Surge in a Bi-Directional 48" Steel, Potable Water Pipeline
  • Design to Prevent Long Running Cracks in Plastic Pipe for Water Applications
  • Scoring and Selecting Rehabilitation Methodologies : How to Pick the Winning Number?
  • Proven Pipeline Rehabilitation System Using Steel Liners for the San Diego County Water Authority
  • Pipe Performance and Experiences during Seismic Events in New Zealand over the Last 25 Years
  • Steel Cylinder Reinforcement (SCR) for Pipeline Repair or Upgrades
  • Determining the Effectiveness of Chlorine-Based Biofilm Control in Large Diameter Pipelines
  • Large Steel Penstock Relining : The Blue Ridge Dam Rehabilitation
  • Cathodic Protection of Ductile Iron and Steel Water Pipelines
  • The Design and Construction Considerations for PCCP Rehabilitation Using FRP Composites
  • The Development of a Novel Steel Reinforced Composite (SRC) Liner for the Rehabilitation of Deteriorated PCCP
  • Can It Handle the Pressure? Condition Assessment, Structural Evaluation, and Repair of an Existing 72 Inch PCCP Pipeline
  • Beyond the Wires : A Sustainable Approach to Prestressed Concrete Cylinder Pipe Management
  • Redeveloping Phoenix's PCCP Assessment Progra : A Pragmatic Approach
  • Interaction of Water Transport Pipelines with Their Surroundings and Third Party Activities
  • Innovative Condition Assessment of Strategic Aqueducts
  • Study on the Applicability of Currently Used Soil-Pipe Interaction Equations for Segmented Buried Pipelines Subjected to Fault Movement
  • Answering 5 Basic Asset Management Questions for Pre-Stressed Concrete Water Transport Mains
  • Refurbishment of the Vyrnwy Large Diameter Trunk Main
  • Synthesis-Analysis of Water and Wastewater Pipeline Condition Assessment and Renewal Engineering Technologies
  • Effect of Wire Breaks on Prestressed Concrete Cylinder Pipe (PCCP) Reinforced with Steel Liners A Case Study
  • Lessons Learned from the Multi-Year Assessment of the Homestake Transmission Pipeline
  • Locating Water Main Leaks in Texas to Conserve Resources during Times of Drought
  • Estimating Residual Strength of Deteriorated 96" Interceptor and Strength Enhancement Provided by Lining Methods Using Computer Modeling and Forensic Investigation Tools
  • A New Generation of Back-Reamers for HDD Installations in Cohesive and Fine to Medium Coarse Soils
  • Physical Evaluation of the Dissipation of a Concentrated Load When Applied to Reinforced Concrete Pipe
  • CFRP Repair and Strengthening of PCCP for Thrust Restraint
  • Mapping Utility Infrastructure via Underground GPS Positioning with Autonomous Telerobotics
  • WSSC's Systematic Approach to the CFRP Liner Installation Process
  • Santa Fe Irrigation District (SFID) : Group 1 PRS and Valve Replacement Project J921
  • Metropolitan Utilities District of Omaha PCCP Asset Management Advancements
  • Combining CFRP Lining Systems with Other Pipeline Rehabilitation Technologies
  • Upper Feeder and San Gabriel Canyon Valve Structure : Hydraulic Transient Analysis
  • Progress toward a Unified Thrust Restraint Design An Update
  • Design-Build of Wastewater Force-Main in North Bay Village : Lessons Learned from the Design-Build Team's Perspective
  • Two-Step Subsurface Characterization Process for Pipeline Project in Texas
  • Condition Assessment of LWC's B.E. Payne 60" PCCP Pipeline
  • Minden Uses Competitive Bidding with Alternate Pipe Materials on Large Diameter Regional Water System Work
  • HDD Matches Installation Method to Long and Difficult Pipe Crossing in Macon, GA
  • Comparison of Jacking Load Models for Trenchless Pipe Jacking
  • Assessing Sustainability of Pipeline Projects Using Envision Rating System.