Cargando…

Project estimating and cost management /

Aims at improving the accuracy of project estimates, and making better in-progress modifications by following the discipline-independent approach mapped out in this book. Learn the ways to apply tools, including a breakdown structure for both work and resources and estimating models, from this book.

Detalles Bibliográficos
Clasificación:Libro Electrónico
Autor principal: Rad, Parviz F., 1942-
Formato: Electrónico eBook
Idioma:Inglés
Publicado: Vienna, Va. : Management Concepts, [2002]
Colección:Project management essential library.
Temas:
Acceso en línea:Texto completo

MARC

LEADER 00000cam a2200000 i 4500
001 KNOVEL_ocn883035293
003 OCoLC
005 20231027140348.0
006 m o d
007 cr cnu---unuuu
008 140708s2002 vaua ob 001 0 eng d
040 |a KNOVL  |b eng  |e rda  |e pn  |c KNOVL  |d E7B  |d YDXCP  |d N$T  |d EBLCP  |d N$T  |d ZCU  |d VT2  |d OCLCQ  |d S4S  |d OCLCQ  |d REB  |d CEF  |d EZ9  |d RRP  |d OCLCQ  |d WYU  |d MERER  |d OCLCQ  |d AU@  |d OCLCQ  |d ERF  |d OCLCQ  |d YDX  |d UKAHL  |d SFB  |d OCLCQ  |d OCLCO  |d OCLCQ  |d OCLCO 
019 |a 903442501  |a 906188022  |a 915158333  |a 961849824  |a 981866431  |a 988692290  |a 999411782  |a 1026461061  |a 1066051872  |a 1103272239  |a 1128161707  |a 1136450250  |a 1152983094  |a 1192335601  |a 1240510302 
020 |a 9781628708417  |q (electronic bk.) 
020 |a 1628708417  |q (electronic bk.) 
020 |a 9781567264548  |q (electronic bk.) 
020 |a 1567264549  |q (electronic bk.) 
020 |a 9781523096916 
020 |a 1523096918 
020 |z 9781567261448 
020 |z 1567261442 
029 1 |a GBVCP  |b 819911097 
035 |a (OCoLC)883035293  |z (OCoLC)903442501  |z (OCoLC)906188022  |z (OCoLC)915158333  |z (OCoLC)961849824  |z (OCoLC)981866431  |z (OCoLC)988692290  |z (OCoLC)999411782  |z (OCoLC)1026461061  |z (OCoLC)1066051872  |z (OCoLC)1103272239  |z (OCoLC)1128161707  |z (OCoLC)1136450250  |z (OCoLC)1152983094  |z (OCoLC)1192335601  |z (OCoLC)1240510302 
050 4 |a TS167  |b .R43 2002eb 
072 7 |a BUS  |x 082000  |2 bisacsh 
072 7 |a BUS  |x 041000  |2 bisacsh 
072 7 |a BUS  |x 042000  |2 bisacsh 
072 7 |a BUS  |x 085000  |2 bisacsh 
082 0 4 |a 658.15/52  |2 22 
049 |a UAMI 
100 1 |a Rad, Parviz F.,  |d 1942- 
245 1 0 |a Project estimating and cost management /  |c Parviz F. Rad. 
264 1 |a Vienna, Va. :  |b Management Concepts,  |c [2002] 
264 4 |c ©2002 
300 |a 1 online resource (xiii, 121 pages) :  |b illustrations 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
490 1 |a Project management essential library 
504 |a Includes bibliographical references and index. 
588 0 |a Print version record. 
505 0 |a Title Page; Copyright; About the Author; Dedication; Table of Contents; Preface; Acknowledgments; CHAPTER 1 Introduction; Project Scope and Objectives; Organizational Objectives; Project Selection; CHAPTER 2 Deliverable-Oriented Work Breakdown structure; Work Breakdown Structure; WBS Development Steps; The Division Bases; Case Example: WBS for an Industrial Complex; Comparison of the Different Bases; Process-Oriented Projects; Organizational Priorities; Semantics; Changing the Paradigm; CHAPTER 3 Resource Breakdown Structure; Nomenclature, Dimensions, and Units; Resource Breakdown Structure. 
505 8 |a RBS DevelopmentThe Primary Division Basis; Lower-Level Division Bases with a Concentration on Human Resources; Estimating the Costs; Detailed Example; CHAPTER 4 Estimating Models; Accuracy; Parametric Estimating; Modular Estimating; Parametric Model; Analogous Estimating; Ratio Estimating; The Three-Quarters Rule; The Square Root Rule; The Two-Thirds Rule; Range Estimating; Expert Judgment; Normalization; CHAPTER 5 Progress Monitoring; Developing a Monitoring Plan; Elements of Monitoring; Earned Value; Productivity; CHAPTER 6 Cost Management; Causes of Change; Feed-Forward Technique. 
505 8 |a Impact of Schedule on CostLifecycle Costs; Impact of Project Risk; CHAPTER 7 External Projects; Specifications; Contracts; Response to Specifications; Bidding; Project Costs; Direct Costs; Indirect Costs; Overhead; Allowance; Contingency; Project Audit; Bibliography; Index. 
520 |a Aims at improving the accuracy of project estimates, and making better in-progress modifications by following the discipline-independent approach mapped out in this book. Learn the ways to apply tools, including a breakdown structure for both work and resources and estimating models, from this book. 
546 |a English. 
590 |a Knovel  |b ACADEMIC - Manufacturing Engineering 
590 |a Knovel  |b ACADEMIC - Industrial Engineering & Operations Management 
590 |a Knovel  |b ACADEMIC - General Engineering & Project Administration 
650 0 |a Cost control. 
650 6 |a Coût  |x Contrôle. 
650 7 |a cost control.  |2 aat 
650 7 |a BUSINESS & ECONOMICS  |x Industrial Management.  |2 bisacsh 
650 7 |a BUSINESS & ECONOMICS  |x Management.  |2 bisacsh 
650 7 |a BUSINESS & ECONOMICS  |x Management Science.  |2 bisacsh 
650 7 |a BUSINESS & ECONOMICS  |x Organizational Behavior.  |2 bisacsh 
650 7 |a Cost control  |2 fast 
650 7 |a Estimate.  |2 pmbok 
650 7 |a Cost Control.  |2 pmbok 
650 7 |a Project Management (PM)  |2 pmbok 
776 0 8 |i Print version:  |a Rad, Parviz F., 1942-  |t Project estimating and cost management.  |d Vienna, Va. : Management Concepts, ©2002  |z 1567261442  |w (DLC) 2001049446  |w (OCoLC)47831560 
830 0 |a Project management essential library. 
856 4 0 |u https://appknovel.uam.elogim.com/kn/resources/kpPECM0004/toc  |z Texto completo 
938 |a Askews and Holts Library Services  |b ASKH  |n AH29697199 
938 |a ProQuest Ebook Central  |b EBLB  |n EBL1939012 
938 |a ebrary  |b EBRY  |n ebr11022537 
938 |a EBSCOhost  |b EBSC  |n 949261 
938 |a YBP Library Services  |b YANK  |n 12289493 
938 |a YBP Library Services  |b YANK  |n 15142099 
994 |a 92  |b IZTAP