MARC

LEADER 00000cam a2200000Ii 4500
001 KNOVEL_ocn874754521
003 OCoLC
005 20231027140348.0
006 m o d
007 cr cnu---unuuu
008 140325t20062004pauk ob 000 0 eng d
040 |a KNOVL  |b eng  |e rda  |e pn  |c KNOVL  |d VLB  |d OCLCO  |d KNOVL  |d OCLCQ  |d ZCU  |d UAB  |d VT2  |d OCLCF  |d OCLCQ  |d CEF  |d RRP  |d OCLCQ  |d OCLCO  |d WYU  |d AU@  |d OCL  |d OCLCO  |d OCLCQ  |d OCLCO 
020 |a 9781628700459  |q (electronic bk.) 
020 |a 1628700459  |q (electronic bk.) 
020 |z 1933890150 
020 |z 9781933890159 
029 1 |a GBVCP  |b 830197303 
035 |a (OCoLC)874754521 
043 |a n-us-wi 
050 4 |a HD69.P75  |b C3378 2006eb 
082 0 4 |a 658.404  |2 23 
049 |a UAMI 
245 0 4 |a The Miller Park stadium project /  |c by Scott Serich [and others]. ; edited by Frank T. Anbari. 
264 1 |a [Newtown Square, Pa.] :  |b Project Management Institute,  |c [2006, 2004] 
264 4 |c ©2004 
300 |a 1 online resource (27 pages) :  |b forms. 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
490 1 |a Project Management Institute. Case studies in project management 
500 |a Additional authors: Graham Bale, Mary Kay Kwasny, Steven Patneaude, Jeff Stack. 
500 |a "This case study was originally prepared as part of Project Management Applications, the capstone course of the Master of Science in Project Management in the Department of Decision Sciences at The George Washington University ... This case study was adapted to make it a learning resource and might not reflect all historical facts related to this project." 
504 |a Includes bibliographical references. 
505 0 |a Introduction -- The inception phase -- The development phase -- The implementation phase -- The closeout phase -- Summary of project assessment and analysis -- References -- Teaching note. 
588 0 |a Print version record. 
506 |a Access restricted to Ryerson students, faculty and staff.  |5 CaOTR 
590 |a Knovel  |b ACADEMIC - Industrial Engineering & Operations Management 
590 |a Knovel  |b ACADEMIC - General Engineering & Project Administration 
610 2 0 |a Miller Park (Milwaukee, Wis.) 
610 2 7 |a Miller Park (Milwaukee, Wis.)  |2 fast 
650 0 |a Project management  |v Case studies. 
650 0 |a Project management  |x Study and teaching. 
650 0 |a Baseball fields  |z Wisconsin  |z Milwaukee  |x Design and construction. 
650 0 |a Construction projects  |z Wisconsin  |z Milwaukee. 
650 6 |a Gestion de projet  |v Études de cas. 
650 6 |a Gestion de projet  |x Étude et enseignement. 
650 6 |a Projets de construction  |z Wisconsin  |z Milwaukee. 
650 7 |a Baseball fields  |x Design and construction  |2 fast 
650 7 |a Construction projects  |2 fast 
650 7 |a Project management  |2 fast 
651 7 |a Wisconsin  |z Milwaukee  |2 fast 
650 7 |a Project Management (PM)  |v Case studies.  |2 pmcsg 
650 7 |a Project Management (PM)  |x Study and teaching.  |2 pmcsg 
655 7 |a Case studies  |2 fast 
700 1 |a Serich, Scott. 
700 1 |a Bale, Graham. 
700 1 |a Kwasny, Mary Kay. 
700 1 |a Patneaude, Steven. 
700 1 |a Stack, Jeff. 
700 1 |a Anbari, Frank T. 
776 0 8 |i Print version:  |t Miller Park stadium project.  |d [Newtown Square, Pa.] : Project Management Institute, [2006, ©2004]  |z 1933890150  |w (OCoLC)123775560 
830 0 |a Case studies in project management. 
856 4 0 |u https://appknovel.uam.elogim.com/kn/resources/kpCSPMMPS1/toc  |z Texto completo 
994 |a 92  |b IZTAP