Cargando…

Federal construction contracting made easy /

Follow the Path to Success in Federal Construction ContractingOpportunities abound in federal government construction contracting, but the devil is in the details. Companies performing work for the federal government must plan and operate based on very specific guidelines and regulations. Knowing ho...

Descripción completa

Detalles Bibliográficos
Clasificación:Libro Electrónico
Autor principal: Uhlig, Stan
Formato: Electrónico eBook
Idioma:Inglés
Publicado: Tysons Corner, Va. : Management Concepts, Ã2012.
Temas:
Acceso en línea:Texto completo

MARC

LEADER 00000cam a2200000Ma 4500
001 KNOVEL_ocn794260313
003 OCoLC
005 20231027140348.0
006 m o d
007 cr zn|||||||||
008 120425s2012 vaua o 001 0 eng d
040 |a B24X7  |b eng  |e pn  |c B24X7  |d KNOVL  |d DEBSZ  |d ZCU  |d OCLCQ  |d KNOVL  |d OCLCF  |d KNOVL  |d OCLCO  |d COO  |d KNOVL  |d IDEBK  |d OCLCQ  |d E7B  |d OCLCQ  |d STF  |d OCLCQ  |d BUF  |d UMI  |d TOH  |d CEF  |d RRP  |d AU@  |d WYU  |d S9I  |d UAB  |d UKAHL  |d OCLCQ  |d OCLCO 
019 |a 1020496925  |a 1065707328 
020 |a 9781613447697  |q (electronic bk.) 
020 |a 1613447698  |q (electronic bk.) 
020 |a 1567263615  |q (pbk.) 
020 |a 9781567263619  |q (pbk.) 
020 |z 9781567263619 
020 |a 9781567263725 
020 |a 1567263720 
029 1 |a AU@  |b 000049162962 
029 1 |a DEBSZ  |b 371512298 
029 1 |a GBVCP  |b 819901369 
029 1 |a NZ1  |b 14691033 
029 1 |a NZ1  |b 15622403 
035 |a (OCoLC)794260313  |z (OCoLC)1020496925  |z (OCoLC)1065707328 
037 |a CL0500000934  |b Safari Books Online 
043 |a n-us--- 
050 4 |a KF865  |b .U34 2012eb 
082 0 4 |a 346.7302/3  |2 23 
049 |a UAMI 
100 1 |a Uhlig, Stan. 
245 1 0 |a Federal construction contracting made easy /  |c Stan Uhlig. 
260 |a Tysons Corner, Va. :  |b Management Concepts,  |c Ã2012. 
300 |a 1 online resource 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
347 |a data file  |2 rda 
500 |a Title from title screen. 
500 |a Includes index. 
505 0 |a Title Page; Copyright; About the Author; Contents; Preface; Chapter 1. Finding and Understanding the Solicitation; Finding Federal Projects to Bid On; Using FedBizOpps; Data Universal Numbering System (DUNS); Central Contractor Registration (CCR); Understanding the Solicitation; Basic Statutory and Regulatory Provisions; Acquisition Methods; Parts of a Solicitation; Amendments; Submitting Questions; Online Representations and Certifications Application (ORCA); Chapter 2. Building a Strategy and Developing a Proposal; The Strategy; Resources and Capabilities. 
505 8 |a Size, Type, and Location of the ProjectEvaluation Criteria; Risk Management; Risk Management Review Process; Risk Management Listing; RFP Requirements/Proposal Preparation; Two-Phase Design-Build; Bidder Eligibility; Bid Feasibility; Self-Assessment; Competition; Preparing the Proposal; Protest after Award; Surety Bonds; Insurance; Taxes; Utilization of Small Business Concerns; Chapter 3. Contracts; Types of Contracts; Fixed-Price Contracts; Cost-Reimbursement Contracts; Incentive Contracts; Indefinite-Delivery Contracts; Time-and-Materials, Labor-Hours, and Letter Contracts. 
505 8 |a Types of Contracting OfficersContracting Officer's Representative; Chapter 4. Design; Requirements for Registration of Designers; Correlating Design to RFP and Proposal; Shop Drawings; Specifications and Drawings; Partnering and Project Progress Processes; Stages of Design Submittal; Specifications; Drawings; Design Analysis; Design Quality Control (DQC); Acceptance of Plan; Notification of Changes; DrChecks Design Review and Checking System; Procedures; Tracking Design Review Comments; Preliminary Construction/Design Progress Schedule; Fast-Tracking; Why the USACE Uses Design-Build. 
505 8 |a Fast-Track ConstructionUnderstanding Military-Specific Codes; Anti-Terrorism/Force Protection (AT/FP) Requirements; LEED; Procedure for Obtaining Variances after Design Is Complete; Chapter 5. Quality Control; Contractor Quality Control Requirements; Contractor Quality Control Plan (CQCP); Preconstruction Submittals; Submittal Register; Three-Phase Quality Control Program; Preparatory Phase; Initial Phase; Follow-up Phase; Additional Preparatory and Initial Phases; Quality Control Manager's Qualifications and Certification; Inspector's Qualifications; RMS/QCS; Chapter 6. Safety. 
505 8 |a Safety Program and Safety PlansAccident Prevention Plan; EM 385-1-1 Safety Manual; Contractor and Subcontractor Safety Training Requirements; Activity Hazard Analysis (AHA); Environmental Protection Plan; Chapter 7. Contract Clauses; FAR Clauses by Reference vs. Full Text; Professional and Consultant Service Costs; Security; Liquidated Damages; Order of Precedence; Price Evaluation Preferences; Small Business Subcontracting Plan; Clause Inclusion and Flowdown; Recordkeeping; Davis-Bacon Act (Prevailing Wages); General FAR Requirements; Who Is Allowed to Work; Site of the Work. 
520 |a Follow the Path to Success in Federal Construction ContractingOpportunities abound in federal government construction contracting, but the devil is in the details. Companies performing work for the federal government must plan and operate based on very specific guidelines and regulations. Knowing how to work within those strict parameters makes the difference between success and failure.Federal Construction Contracting Made Easy is your road map to successfully identifying, planning, and completing government construction projects. This book guides you in finding opportunities, preparing winni. 
590 |a O'Reilly  |b O'Reilly Online Learning: Academic/Public Library Edition 
590 |a Knovel  |b ACADEMIC - Civil Engineering & Construction Materials 
650 0 |a Construction contracts  |z United States. 
650 0 |a Engineering contracts  |z United States. 
650 0 |a Public contracts  |z United States. 
650 7 |a Construction contracts  |2 fast 
650 7 |a Engineering contracts  |2 fast 
650 7 |a Public contracts  |2 fast 
651 7 |a United States  |2 fast 
776 0 8 |i Print version:  |a Uhlig, Stan.  |t Federal construction contracting made easy.  |d Tyson's Corner, VA : Management Concepts Press, [2012]  |z 9781567263619  |w (DLC) 2012930344  |w (OCoLC)800727966 
856 4 0 |u https://appknovel.uam.elogim.com/kn/resources/kpFCCME001/toc  |z Texto completo 
938 |a Askews and Holts Library Services  |b ASKH  |n AH29697171 
938 |a Books 24x7  |b B247  |n bkg00045948 
938 |a ebrary  |b EBRY  |n ebr11022478 
938 |a ProQuest MyiLibrary Digital eBook Collection  |b IDEB  |n cis30989390 
994 |a 92  |b IZTAP