Pipelines 2010 : climbing new peaks to infrastructure reliability--renew, rehab, and reinvest : proceedings of the 2010 Pipeline Division Specialty Congress, August 28-September 1, 2010, Keystone Colorado /
Proceedings of the Pipelines 2010 Conference, held in Keystone, Colorado, August 28-September 1, 2010. Sponsored by the Pipeline Division of ASCE. This collection contains 152 papers that examine evolving infrastructure assessment and monitoring techniques to help pipeline professionals improve the...
Clasificación: | Libro Electrónico |
---|---|
Autores Corporativos: | , |
Otros Autores: | , |
Formato: | Electrónico Congresos, conferencias eBook |
Idioma: | Inglés |
Publicado: |
Reston, Va. :
American Society of Civil Engineers,
2010.
|
Temas: | |
Acceso en línea: | Texto completo |
Tabla de Contenidos:
- Cover; Table of Contents; Construction; A Study on Seismic Behavior of Buried Steel Pipelines Crossing Active Faults; A Variety of Construction Methods and Pipeline Materials Help Create a New Sewer System; CSO Conveyances Project�Selection, Analysis, Design, and Specifications with Multiple Competitive Pipe Materials; Demanding HDD Installation of Fusible 24-Inch PVC Pipe Sets New Record; Design-Build of Wastewater Force Main in North Bay Village, Florida; Development and Construction of the Nation�s Largest Water Main Rehab Project.
- Experimental Investigation of the Effect of Microfibers on the Tensile and Flexural Strengths of Low-Viscosity GroutsGeneral Services Contracting for Sewer Construction; Hueneme Outfall Confronts Unique Challenges in Horizontal Directional Drilling and Marine Construction for New Ocean Outfall; Implementing an Aquifer Storage and Recovery Project; Interceptor Construction in an Urban Area�How the City of Aurora Managed Competing Interests by Considering Constructability and Routing; Joint Integrity of Plastic Pressure Pipes in Municipal Service.
- Lessons from an HDD Project That Was Awarded for 1.74 Million with 90 Days to Complete That Took in Excess of 6 Million and More Than 1,000 DaysManaging Challenges Building the Aurora Prairie Waters Project; New Application for Fiber Wrap Strengthening of Buried Pipelines; One Project, Four Trenchless Methods; P.I.P.E. Solutions of the South Mainland Water Transmission Main; Pipe Joint Integrity: Cementitious and Metallic Pressure Pipes; Project Management Information Systems for Pipeline Design and Construction�PrairieNet.
- Protecting Existing PCCP Subject to External Transient LoadsRapid Emergency Pipeline Repairs Utilizing CFRP; Raw Sewage through Steel Pipe: A Unique Application on the Pima County Plant Interconnect; Steel Selection and Pipe Fabrication Challenges of a 120-Inch-Diameter High-Strength-Steel Tunnel Liner Project; Tunneling Saves Money and the Environment; Twenty-One Foot Diameter Flexible Pipe�Construction; Twenty-One Foot Diameter Flexible Pipe�Design; Design; Preserving Capacity in CUWCD Aqueducts.
- Collecting and Converting 2-D Utility Mapping to 3-DContribution of Frictional Resistance to Restrain Unbalanced Thrust in Buried Pipelines; Design and Specification of Bolted Flange Joints in Water/Wastewater Practice; Features of the Lake Powell Pipeline Preliminary Design to Minimize Hydraulic Transients; Design of the Colorado Ocean Relief Sewer Project; Directional Drilling Design with ASTM F1962: A Decade of Success; Historic Development Adds Challenge to Storm Drain Tunnel under Railroad; Importance of Blowoffs and Design Considerations.