Cargando…

Preparing for design-build projects : a primer for owners, engineers, and contractors /

Foreword by Michael C. Loulakis, Esq. For nearly two decades, design-build (DB) contracting has become increasingly the method of choice in public and private construction projects. Many designers and builders are now drawn to design-build projects and must alter their business practices to accommod...

Descripción completa

Detalles Bibliográficos
Clasificación:Libro Electrónico
Autor principal: Gransberg, Douglas D.
Otros Autores: Koch, James A., Molenaar, Keith R. (Keith Robert)
Formato: Electrónico eBook
Idioma:Inglés
Publicado: Reston, Va. : American Society of Civil Engineers, ©2006.
Temas:
Acceso en línea:Texto completo
Tabla de Contenidos:
  • Contents
  • Foreword
  • Preface
  • Acknowledgments
  • ONE: INTRODUCTION TO DESIGN-BUILD CONTRACTING
  • Design-Build: What and Why
  • Historical Perspective
  • Why Use Design-Build?
  • Design-Build Success Factors
  • References
  • TWO: DEVELOPING DESIGN-BUILD PROJECT SCOPE
  • Design-Build Project Characteristics
  • Influencing the Development of Design-Build Project Scope
  • Design-Build Contract Model
  • Formalizing Project Scope
  • Summary
  • References
  • THREE: WRITING DESIGN-BUILD PERFORMANCE CRITERIA
  • Owner Objectives
  • Performance Criteria DevelopmentManagement Criteria
  • Schedule Criteria
  • Technical Criteria
  • Cost Criteria
  • Using Abductive Reasoning to Write Performance Criteria
  • Design Risk Allocation through Performance Criteria
  • References
  • FOUR: PREPARING DESIGN-BUILD REQUESTS FOR QUALIFICATIONS OR REQUESTS FOR PROPOSALS
  • Design-Build Risk Types
  • Applied Risk Management in Design-Build
  • Contracting Strategy
  • Request for Qualifications/Request for Proposal Content
  • Request for Proposal Components
  • Design-Build Request for Proposal Contract Clause ConsiderationsDesign-Build Award Events
  • Summary
  • References
  • FIVE: DESIGN-BUILD REQUESTS FOR PROPOSAL CASE STUDIES
  • Case 5-1: To Spec or Not to Specâ€?Is That the Question?
  • Case 5-2: Keep Looking Until You Find the Right Answer
  • Case 5-3: All the Right Moves
  • Case 5-4: Trust Me. I Know This Will Work
  • Summary
  • SIX: SELECTION PROCESS REQUEST FOR QUALIFICATIONS/REQUEST FOR PROPOSALS EVALUATION PLANNING
  • Award Methods
  • Selection and Award Processes
  • Comparison of Methods
  • Evaluation CriteriaScoring/Rating Systems
  • The Rating Process
  • Evaluation Documentation
  • Summary
  • References
  • SEVEN: DESIGN-BUILD PROPOSAL EVALUATION CASE STUDIES
  • Case 7-1: Let Me Really Strut My Stuff
  • Case 7-2: Making a Passing Grade
  • Case 7-3: A Bracing Thought
  • Case 7-4: Bait and Switch?
  • Case 7-5: Defending the System
  • Summary
  • EIGHT: PREPARING DESIGN-BUILD PROPOSALS
  • Design-Build Proposal Preparation Sequence
  • Proposal Preparation by the General Contractor
  • Proposal Preparation by the Designer-of-Record
  • Preparing the Price ProposalClosure of the Proposal Preparation Process
  • Summary
  • NINE: SUMMARY OF DESIGN-BUILD CONTRACTING
  • Design-Build Basic Concepts
  • The Future of Design-Build
  • Reference
  • Appendix 1: A Design-Builder's Perspective on the Design-Build Request for Proposal Process in the Transportation Industry
  • Appendix 2: A Design-Builderâ€?s Perspective on the Design-Build Request for Proposal Process in the Building Construction Industry
  • Appendix 3: Sample Design-Build Contract Documents
  • Index
  • A
  • B
  • C
  • D
  • E
  • F