Cargando…

Improving Air Force depot programming by linking resources to capabilities /

One of the more challenging goals in programming is to link Air Force budget program element investments to operationally relevant capability metrics, then to use these metrics to assess any risk incurred by a proposed program objective memorandum (POM). Previous RAND Project AIR FORCE work develope...

Descripción completa

Detalles Bibliográficos
Clasificación:Libro Electrónico
Autores Corporativos: Project Air Force (U.S.), Rand Corporation
Otros Autores: Snyder, Don, 1962-
Formato: Electrónico eBook
Idioma:Inglés
Publicado: Santa Monica, CA : RAND, 2012.
Colección:Technical report (Rand Corporation) ; TR905.
Temas:
Acceso en línea:Texto completo

MARC

LEADER 00000cam a2200000 a 4500
001 JSTOROA_ocn819409949
003 OCoLC
005 20231005004200.0
006 m o d
007 cr mn||||a||||
008 121127s2012 caua obt 000 0 eng
040 |a DID  |b eng  |e pn  |c DID  |d DID  |d OCLCA  |d JSTOR  |d COO  |d YDXCP  |d OCLCQ  |d CUS  |d OCLCQ  |d LND  |d VT2  |d VFL  |d LOA  |d ICG  |d OCLCA  |d OCLCF  |d U3W  |d ICN  |d CEF  |d AU@  |d ERL  |d WYU  |d TXR  |d NJT  |d VLY  |d OCLCQ  |d OCLCO  |d OCLCQ  |d OCLCO 
019 |a 1008953830  |a 1044574240  |a 1058473388  |a 1060955317  |a 1066615298  |a 1073054745  |a 1115108888  |a 1162365687 
020 |a 9780833083494  |q (electronic bk.) 
020 |a 083308349X  |q (electronic bk.) 
020 |z 9780833059673 
020 |z 083305967X 
029 1 |a AU@  |b 000061153509 
029 1 |a GBVCP  |b 100865793X 
035 |a (OCoLC)819409949  |z (OCoLC)1008953830  |z (OCoLC)1044574240  |z (OCoLC)1058473388  |z (OCoLC)1060955317  |z (OCoLC)1066615298  |z (OCoLC)1073054745  |z (OCoLC)1115108888  |z (OCoLC)1162365687 
037 |a 22573/ctt4cxzb1  |b JSTOR 
043 |a n-us--- 
050 4 |a UG633.2 
072 7 |a TEC025000  |2 bisacsh 
072 7 |a SCI043000  |2 bisacsh 
072 7 |a HIS027000  |2 bisacsh 
082 0 4 |a 358.4/18  |2 23 
088 |a RAND TR905 
049 |a UAMI 
245 0 0 |a Improving Air Force depot programming by linking resources to capabilities /  |c Don Snyder [and others]. 
260 |a Santa Monica, CA :  |b RAND,  |c 2012. 
300 |a 1 online resource (xix, 86 pages) :  |b illustrations 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
347 |a text file 
347 |b PDF 
490 1 |a RAND Corporation technical report series ;  |v TR905 
504 |a Includes bibliographical references (pages 85-86). 
520 |a One of the more challenging goals in programming is to link Air Force budget program element investments to operationally relevant capability metrics, then to use these metrics to assess any risk incurred by a proposed program objective memorandum (POM). Previous RAND Project AIR FORCE work developed a set of metrics and framework of analysis for capabilities-based programming and assessment of risks of expeditionary combat support. Because of the success of that work, the RAND Corporation was asked to apply and to extend (as needed) this capabilities based approach to the depot maintenance business areas, specifically focusing on depot purchased equipment maintenance (DPEM) as a first step, and to do so with a methodology that is broadly applicable. DPEM comprises numerous depot-level maintenance and inspection activities on capital assets, as well as storage and other supporting activities that span numerous program elements, budget programs, and appropriations. It funds the bulk of the work done at the Air Force depots that does not involve the repair of spares or the work on modification programs. This report presents an analysis of how to better program for DPEM. 
536 |a The research described in this report was sponsored by the United States Air Force under Contract FA7014-06-C-0001. 
588 0 |a Online resource; title from PDF title screen (viewed on November 27, 2012). 
505 0 |a Introduction -- Depot purchased equipment maintenance -- Metrics for assessing capabilities and risks in depot purchased equipment maintenance -- Enterprise prioritization in depot purchased equipment maintenance funding -- A prototype model for assessing capabilities and risks in depot purchased equipment maintenance programming -- Software maintenance challenges for capabilities-based programming -- Policy options and conclusions -- Appendix A. Aircraft possession purpose codes -- Appendix B. Decision support system description -- Appendix C. Software Deferrals -- Appendix D. The software requirements and execution process. 
546 |a English. 
590 |a JSTOR  |b Books at JSTOR All Purchased 
590 |a JSTOR  |b Books at JSTOR Open Access 
610 1 0 |a United States.  |b Air Force  |x Appropriations and expenditures. 
610 1 0 |a United States.  |b Air Force  |x Equipment  |x Maintenance and repair  |x Costs  |x Evaluation. 
610 1 0 |a United States.  |b Air Force  |x Supplies and stores  |x Costs  |x Evaluation. 
610 1 6 |a États-Unis.  |b Air Force  |x Crédits budgétaires et dépenses. 
610 1 6 |a États-Unis.  |b Air Force  |x Équipement  |x Entretien et réparations  |x Coût. 
610 1 7 |a United States.  |b Air Force  |2 fast 
650 7 |a TECHNOLOGY & ENGINEERING  |x Military Science.  |2 bisacsh 
650 7 |a Armed Forces  |x Appropriations and expenditures  |2 fast 
700 1 |a Snyder, Don,  |d 1962- 
710 2 |a Project Air Force (U.S.) 
710 2 |a Rand Corporation. 
776 0 |z 083305967X 
830 0 |a Technical report (Rand Corporation) ;  |v TR905. 
856 4 0 |u https://jstor.uam.elogim.com/stable/10.7249/j.ctt5hhw7k  |z Texto completo 
938 |a YBP Library Services  |b YANK  |n 11820997 
994 |a 92  |b IZTAP