Cargando…

Learning from experience Volume IV, Lessons from Australia's Collins submarine programs /

Large, complex submarine design and construction programs demand personnel with unique skills and capabilities supplemented with practical experiences in their areas of expertise. Recognizing the importance of past experiences for successful program management, the Australian government asked the RA...

Descripción completa

Detalles Bibliográficos
Clasificación:Libro Electrónico
Autores Corporativos: Acquisition and Technology Policy Center, Rand Corporation, Australia. Department of Defence
Otros Autores: Schank, John F. (John Frederic), 1946-, Ip, Cesse, Kamarck, Kristy N., Murphy, Robert E., Arena, Mark V., LaCroix, F. W., Lee, Gordon T., 1953-
Formato: Electrónico eBook
Idioma:Inglés
Publicado: Santa Monica, CA : RAND, 2011.
Temas:
Acceso en línea:Texto completo

MARC

LEADER 00000cam a2200000Ma 4500
001 JSTOROA_ocn797002630
003 OCoLC
005 20231005004200.0
006 m o d
007 cr cn|||||||||
008 070508s2011 cau ob 001 0 eng d
040 |a COO  |b eng  |e pn  |c COO  |d OCLCO  |d OCLCA  |d AU@  |d JSTOR  |d OCLCQ  |d TEF  |d OCLCQ  |d LND  |d VT2  |d LOA  |d ICG  |d OCLCF  |d U3W  |d ICN  |d NJT  |d OCLCO  |d OCLCQ  |d OCLCO 
019 |a 801380157 
020 |a 9780833058980  |q (electronic bk.) 
020 |a 0833058983  |q (electronic bk.) 
020 |a 9780833059031  |q (electronic bk.) 
020 |a 0833059033  |q (electronic bk.) 
020 |a 9780833077578  |q (electronic bk.) 
020 |a 0833077570  |q (electronic bk.) 
027 |a RAND/MG-1128/4-NAVY 
029 1 |a AU@  |b 000049612643 
029 1 |a GBVCP  |b 100865728X 
035 |a (OCoLC)797002630  |z (OCoLC)801380157 
037 |c $20.00  |f paperback 
037 |a 22573/ctt36t6mj  |b JSTOR 
043 |a u-at--- 
050 4 |a V9334  |b .L4373 2011eb 
082 0 4 |a 359.03  |2 23 
049 |a UAMI 
245 0 0 |a Learning from experience  |n Volume IV,  |p Lessons from Australia's Collins submarine programs /  |c John F. Schank [and others]. 
246 3 0 |a Lessons from Australia's Collins submarine programs 
260 |a Santa Monica, CA :  |b RAND,  |c 2011. 
300 |a 1 online resource (xxvi, 59 pages) 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
500 |a "RAND National Defense Research Institute." 
500 |a "This research was conducted within the Acquisition and Technology Policy Center of the RAND National Defense Research Institute"--Pg. IV. 
504 |a Includes bibliographical references (pages 57-59). 
505 0 |a Introduction -- History of Australia's Submarine Fleet -- Setting the Requirements: Evolutionary Versus Revolutionary Approach -- Contracting and Acquisition Strategy -- Designing and Building the Collins-Class Vessels -- Lessons from the Collins Program. 
520 |a Large, complex submarine design and construction programs demand personnel with unique skills and capabilities supplemented with practical experiences in their areas of expertise. Recognizing the importance of past experiences for successful program management, the Australian government asked the RAND Corporation to develop a set of lessons learned from its Collins submarine program that could help inform future program managers. Collins was the first submarine built in Australia. RAND investigated how operational requirements were set for the Collins class; explored the acquisition, contracting, design, and build processes that the program employed; and assessed the plans and activities surrounding integrated logistics support for the class. Although Australia had intended to take an evolutionary approach in procuring the Collins class by using an existing design, no design was suitable, so the program pursued a developmental platform and a developmental combat system. This introduced a high degree of risk into the program, particularly in the combat system technology. Among the important lessons: All appropriate organizations should be involved in a new submarine program from its inception, the majority of the design drawings should be completed before construction begins, and a thorough and adequate testing program should be developed. Because designing and building a submarine is one of the most complex undertakings for a new program, they require careful management and oversight. 
506 |a Access restricted to subscribing institutions. 
590 |a JSTOR  |b Books at JSTOR All Purchased 
590 |a JSTOR  |b Books at JSTOR Open Access 
610 1 0 |a Australia.  |b Department of Defence  |x Procurement. 
610 2 0 |a Collins Class (Submarine) 
610 1 7 |a Australia.  |b Department of Defence  |2 fast 
650 0 |a Submarines (Ships)  |z Australia  |x Planning. 
650 0 |a Submarines (Ships)  |z Australia  |x Design and construction. 
650 0 |a Shipbuilding industry  |z Australia  |x Management. 
650 6 |a Sous-marins  |z Australie  |x Planification. 
650 6 |a Construction navale  |x Industrie  |z Australie  |x Gestion. 
650 7 |a Armed Forces  |x Procurement  |2 fast 
650 7 |a Shipbuilding industry  |x Management  |2 fast 
650 7 |a Submarines (Ships)  |x Design and construction  |2 fast 
651 7 |a Australia  |2 fast 
653 |a Submarines 
653 |a Shipbuilding 
653 |a Program management 
653 |a Royal Australian Navy 
653 |a Defence planning 
653 |a Government contracts 
653 |a Government purchasing 
653 |a Reviews of research 
700 1 |a Schank, John F.  |q (John Frederic),  |d 1946- 
700 1 |a Ip, Cesse. 
700 1 |a Kamarck, Kristy N. 
700 1 |a Murphy, Robert E. 
700 1 |a Arena, Mark V. 
700 1 |a LaCroix, F. W. 
700 1 |a Lee, Gordon T.,  |d 1953- 
710 2 |a Acquisition and Technology Policy Center. 
710 2 |a Rand Corporation. 
710 1 |a Australia.  |b Department of Defence. 
856 4 0 |u https://jstor.uam.elogim.com/stable/10.7249/j.ctt3fh0pr  |z Texto completo 
994 |a 92  |b IZTAP