LEADER |
00000cam a2200000Ma 4500 |
001 |
JSTOROA_ocn797002630 |
003 |
OCoLC |
005 |
20231005004200.0 |
006 |
m o d |
007 |
cr cn||||||||| |
008 |
070508s2011 cau ob 001 0 eng d |
040 |
|
|
|a COO
|b eng
|e pn
|c COO
|d OCLCO
|d OCLCA
|d AU@
|d JSTOR
|d OCLCQ
|d TEF
|d OCLCQ
|d LND
|d VT2
|d LOA
|d ICG
|d OCLCF
|d U3W
|d ICN
|d NJT
|d OCLCO
|d OCLCQ
|d OCLCO
|
019 |
|
|
|a 801380157
|
020 |
|
|
|a 9780833058980
|q (electronic bk.)
|
020 |
|
|
|a 0833058983
|q (electronic bk.)
|
020 |
|
|
|a 9780833059031
|q (electronic bk.)
|
020 |
|
|
|a 0833059033
|q (electronic bk.)
|
020 |
|
|
|a 9780833077578
|q (electronic bk.)
|
020 |
|
|
|a 0833077570
|q (electronic bk.)
|
027 |
|
|
|a RAND/MG-1128/4-NAVY
|
029 |
1 |
|
|a AU@
|b 000049612643
|
029 |
1 |
|
|a GBVCP
|b 100865728X
|
035 |
|
|
|a (OCoLC)797002630
|z (OCoLC)801380157
|
037 |
|
|
|c $20.00
|f paperback
|
037 |
|
|
|a 22573/ctt36t6mj
|b JSTOR
|
043 |
|
|
|a u-at---
|
050 |
|
4 |
|a V9334
|b .L4373 2011eb
|
082 |
0 |
4 |
|a 359.03
|2 23
|
049 |
|
|
|a UAMI
|
245 |
0 |
0 |
|a Learning from experience
|n Volume IV,
|p Lessons from Australia's Collins submarine programs /
|c John F. Schank [and others].
|
246 |
3 |
0 |
|a Lessons from Australia's Collins submarine programs
|
260 |
|
|
|a Santa Monica, CA :
|b RAND,
|c 2011.
|
300 |
|
|
|a 1 online resource (xxvi, 59 pages)
|
336 |
|
|
|a text
|b txt
|2 rdacontent
|
337 |
|
|
|a computer
|b c
|2 rdamedia
|
338 |
|
|
|a online resource
|b cr
|2 rdacarrier
|
500 |
|
|
|a "RAND National Defense Research Institute."
|
500 |
|
|
|a "This research was conducted within the Acquisition and Technology Policy Center of the RAND National Defense Research Institute"--Pg. IV.
|
504 |
|
|
|a Includes bibliographical references (pages 57-59).
|
505 |
0 |
|
|a Introduction -- History of Australia's Submarine Fleet -- Setting the Requirements: Evolutionary Versus Revolutionary Approach -- Contracting and Acquisition Strategy -- Designing and Building the Collins-Class Vessels -- Lessons from the Collins Program.
|
520 |
|
|
|a Large, complex submarine design and construction programs demand personnel with unique skills and capabilities supplemented with practical experiences in their areas of expertise. Recognizing the importance of past experiences for successful program management, the Australian government asked the RAND Corporation to develop a set of lessons learned from its Collins submarine program that could help inform future program managers. Collins was the first submarine built in Australia. RAND investigated how operational requirements were set for the Collins class; explored the acquisition, contracting, design, and build processes that the program employed; and assessed the plans and activities surrounding integrated logistics support for the class. Although Australia had intended to take an evolutionary approach in procuring the Collins class by using an existing design, no design was suitable, so the program pursued a developmental platform and a developmental combat system. This introduced a high degree of risk into the program, particularly in the combat system technology. Among the important lessons: All appropriate organizations should be involved in a new submarine program from its inception, the majority of the design drawings should be completed before construction begins, and a thorough and adequate testing program should be developed. Because designing and building a submarine is one of the most complex undertakings for a new program, they require careful management and oversight.
|
506 |
|
|
|a Access restricted to subscribing institutions.
|
590 |
|
|
|a JSTOR
|b Books at JSTOR All Purchased
|
590 |
|
|
|a JSTOR
|b Books at JSTOR Open Access
|
610 |
1 |
0 |
|a Australia.
|b Department of Defence
|x Procurement.
|
610 |
2 |
0 |
|a Collins Class (Submarine)
|
610 |
1 |
7 |
|a Australia.
|b Department of Defence
|2 fast
|
650 |
|
0 |
|a Submarines (Ships)
|z Australia
|x Planning.
|
650 |
|
0 |
|a Submarines (Ships)
|z Australia
|x Design and construction.
|
650 |
|
0 |
|a Shipbuilding industry
|z Australia
|x Management.
|
650 |
|
6 |
|a Sous-marins
|z Australie
|x Planification.
|
650 |
|
6 |
|a Construction navale
|x Industrie
|z Australie
|x Gestion.
|
650 |
|
7 |
|a Armed Forces
|x Procurement
|2 fast
|
650 |
|
7 |
|a Shipbuilding industry
|x Management
|2 fast
|
650 |
|
7 |
|a Submarines (Ships)
|x Design and construction
|2 fast
|
651 |
|
7 |
|a Australia
|2 fast
|
653 |
|
|
|a Submarines
|
653 |
|
|
|a Shipbuilding
|
653 |
|
|
|a Program management
|
653 |
|
|
|a Royal Australian Navy
|
653 |
|
|
|a Defence planning
|
653 |
|
|
|a Government contracts
|
653 |
|
|
|a Government purchasing
|
653 |
|
|
|a Reviews of research
|
700 |
1 |
|
|a Schank, John F.
|q (John Frederic),
|d 1946-
|
700 |
1 |
|
|a Ip, Cesse.
|
700 |
1 |
|
|a Kamarck, Kristy N.
|
700 |
1 |
|
|a Murphy, Robert E.
|
700 |
1 |
|
|a Arena, Mark V.
|
700 |
1 |
|
|a LaCroix, F. W.
|
700 |
1 |
|
|a Lee, Gordon T.,
|d 1953-
|
710 |
2 |
|
|a Acquisition and Technology Policy Center.
|
710 |
2 |
|
|a Rand Corporation.
|
710 |
1 |
|
|a Australia.
|b Department of Defence.
|
856 |
4 |
0 |
|u https://jstor.uam.elogim.com/stable/10.7249/j.ctt3fh0pr
|z Texto completo
|
994 |
|
|
|a 92
|b IZTAP
|