Cargando…

Options for meeting the maintenance demands of active associate flying units /

The methodology developed in this research can be used to quantify and compare the key factors that allow the U.S. Air National Guard to generate peacetime training sorties with a fairly small full-time workforce. The authors apply these insights to proposed Total Force Integration initiatives to ev...

Descripción completa

Detalles Bibliográficos
Clasificación:Libro Electrónico
Autor Corporativo: Project Air Force (U.S.)
Formato: Electrónico eBook
Idioma:Inglés
Publicado: Santa Monica : RAND Corp., 2008.
Temas:
Acceso en línea:Texto completo

MARC

LEADER 00000cam a2200000 a 4500
001 JSTOROA_ocn234317960
003 OCoLC
005 20231005004200.0
006 m o d
007 cr cnu---|nuuu
008 080721s2008 caua ob 000 0 eng d
010 |a  2007050674 
040 |a N$T  |b eng  |e pn  |c N$T  |d N$T  |d OCLCQ  |d IDEBK  |d OCLCQ  |d TUU  |d OCLCQ  |d MERUC  |d COD  |d CLU  |d COO  |d OCLCO  |d DTICE  |d JCR  |d UBY  |d COCUF  |d OCLCE  |d E7B  |d FVL  |d OCLCQ  |d OCLCO  |d OCLCQ  |d OCLCA  |d JSTOR  |d OCLCQ  |d OCLCF  |d DKDLA  |d OCLCQ  |d OCLCO  |d OCL  |d YDXCP  |d OCLCQ  |d AZK  |d CUS  |d PIFAG  |d PIFPO  |d OCLCQ  |d JBG  |d OCLCQ  |d VT2  |d LND  |d OCLCO  |d WY@  |d U3W  |d LOA  |d VFL  |d LUE  |d ICG  |d OCLCQ  |d OCLCA  |d VTS  |d OCLCQ  |d OCLCO  |d ERL  |d STF  |d NJT  |d CLU  |d OCLCO  |d OCLCQ  |d OCLCO  |d OCLCQ  |d OCLCO 
019 |a 243469632  |a 318688902  |a 427511003  |a 560594487  |a 607866623  |a 609248935  |a 722677214  |a 728052620  |a 961538722  |a 962591866  |a 974444174  |a 974520559  |a 991975911  |a 992025508  |a 1008951213  |a 1018005539  |a 1039224502  |a 1073043833  |a 1117335340  |a 1137122592 
020 |a 9780833045850  |q (electronic bk.) 
020 |a 0833045857  |q (electronic bk.) 
020 |z 9780833042101 
020 |z 0833042106 
029 1 |a AU@  |b 000051336096 
029 1 |a DEBBG  |b BV043121462 
029 1 |a DEBSZ  |b 422116998 
029 1 |a DTICE  |b ADA483416 
029 1 |a GBVCP  |b 1008651575 
029 1 |a GBVCP  |b 802615082 
029 1 |a NZ1  |b 13103820 
035 |a (OCoLC)234317960  |z (OCoLC)243469632  |z (OCoLC)318688902  |z (OCoLC)427511003  |z (OCoLC)560594487  |z (OCoLC)607866623  |z (OCoLC)609248935  |z (OCoLC)722677214  |z (OCoLC)728052620  |z (OCoLC)961538722  |z (OCoLC)962591866  |z (OCoLC)974444174  |z (OCoLC)974520559  |z (OCoLC)991975911  |z (OCoLC)992025508  |z (OCoLC)1008951213  |z (OCoLC)1018005539  |z (OCoLC)1039224502  |z (OCoLC)1073043833  |z (OCoLC)1117335340  |z (OCoLC)1137122592 
037 |a 22573/cttj9h2  |b JSTOR 
042 |a dlr 
043 |a n-us--- 
050 4 |a UG1243  |b .O68 2008eb 
072 7 |a TEC  |x 025000  |2 bisacsh 
072 7 |a POL035000  |2 bisacsh 
082 0 4 |a 358.4/162  |2 22 
088 |a MG-611-AF 
049 |a UAMI 
245 0 0 |a Options for meeting the maintenance demands of active associate flying units /  |c John G. Drew [and others]. 
260 |a Santa Monica :  |b RAND Corp.,  |c 2008. 
300 |a 1 online resource (xxvi, 67 pages) :  |b illustrations 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
500 |a "RAND Project Air Force." 
500 |a "MG-611-AF"--Page 4 of cover 
504 |a Includes bibliographical references. 
505 0 |a Ch. 1: Introduction and research motivation -- ch. 2: Understanding standards-based productivity differences -- ch. 3: Evaluating options for meeting active associate maintenance requirements -- ch. 4: Summary of findings -- Appendix A. Total force integration initiatives -- Appendix B. F-16 unit productivity comparisons -- Appendix C. RAND scheduling model: simulation of the sortie generation process. 
520 |a The methodology developed in this research can be used to quantify and compare the key factors that allow the U.S. Air National Guard to generate peacetime training sorties with a fairly small full-time workforce. The authors apply these insights to proposed Total Force Integration initiatives to evaluate maintenance options for supporting associate units, where the goal of the unit is to produce trained pilots in the most efficient manner possible. The methodology evaluates how various types of personnel can influence the size and productivity of a unit. 
506 |3 Use copy  |f Restrictions unspecified  |2 star  |5 MiAaHDL 
533 |a Electronic reproduction.  |b [Place of publication not identified] :  |c HathiTrust Digital Library,  |d 2010.  |5 MiAaHDL 
538 |a Master and use copy. Digital master created according to Benchmark for Faithful Digital Reproductions of Monographs and Serials, Version 1. Digital Library Federation, December 2002.  |u http://purl.oclc.org/DLF/benchrepro0212  |5 MiAaHDL 
583 1 |a digitized  |c 2010  |h HathiTrust Digital Library  |l committed to preserve  |2 pda  |5 MiAaHDL 
588 0 |a Print version record. 
590 |a JSTOR  |b Books at JSTOR Open Access 
590 |a JSTOR  |b Books at JSTOR All Purchased 
610 1 0 |a United States.  |b Air Force  |x Operational readiness. 
610 1 6 |a États-Unis.  |b Air Force  |x État de préparation opérationnelle. 
610 1 7 |a United States.  |b Air Force  |2 fast 
650 0 |a Airplanes, Military  |z United States  |x Maintenance and repair. 
651 0 |a United States  |x Air National Guard. 
650 0 |a Air pilots, Military  |z United States. 
651 6 |a États-Unis  |x Air National Guard. 
650 6 |a Pilotes d'aéronef militaires  |z États-Unis. 
650 7 |a TECHNOLOGY & ENGINEERING  |x Military Science.  |2 bisacsh 
650 7 |a POLITICAL SCIENCE  |x Political Freedom.  |2 bisacsh 
650 1 7 |a Air force operations.  |2 dtict 
650 1 7 |a Military aircraft.  |2 dtict 
650 1 7 |a Aircraft maintenance.  |2 dtict 
650 7 |a Air pilots, Military  |2 fast 
650 7 |a Airplanes, Military  |x Maintenance and repair  |2 fast 
650 7 |a Armed Forces  |2 fast 
650 7 |a Armed Forces  |x Operational readiness  |2 fast 
651 7 |a United States  |2 fast 
650 1 7 |a Terminal flight facilities.  |2 scgdst 
650 2 7 |a Military forces and organizations.  |2 scgdst 
650 2 7 |a Repair.  |2 scgdst 
650 2 7 |a Active duty.  |2 scgdst 
650 2 7 |a Air force personnel.  |2 scgdst 
650 2 7 |a Operational readiness.  |2 scgdst 
650 2 7 |a National guard.  |2 scgdst 
650 2 7 |a Pilots.  |2 scgdst 
710 2 |a Project Air Force (U.S.) 
776 0 8 |i Print version:  |t Options for meeting the maintenance demands of active associate flying units.  |d Santa Monica : RAND Corp., 2008  |z 9780833042101  |z 0833042106  |w (DLC) 2007050674  |w (OCoLC)183928628 
856 4 0 |u https://jstor.uam.elogim.com/stable/10.7249/mg611af  |z Texto completo 
938 |a EBSCOhost  |b EBSC  |n 230134 
938 |a YBP Library Services  |b YANK  |n 2887449 
994 |a 92  |b IZTAP