Challenges and Approaches for Selecting, Assessing and Qualifying Commercial Industrial Digital Instrumentation and Control Equipment for Use in Nuclear Power Plant Applications
Clasificación: | Libro Electrónico |
---|---|
Autor principal: | |
Formato: | Electrónico eBook |
Idioma: | Inglés |
Publicado: |
Havertown :
International Atomic Energy Agency,
2020.
|
Colección: | IAEA Nuclear Energy Ser.
|
Temas: | |
Acceso en línea: | Texto completo |
Tabla de Contenidos:
- Intro
- 1. INTRODUCTION
- 1.1. Background
- 1.2. Objective
- 1.3. Scope
- 1.4. Structure
- 2. Challenges associated with commercial industrial DIGITAL Instrumentation and Control equipment
- 2.1. Challenges in the use of commercial off the shelf devices
- 2.1.1. Complexity of the component, multifunction, primary and support functions
- 2.1.2. Common cause failure considerations
- 2.2. Specific hardware and software vulnerabilities of digital commercial off the shelf devices
- 2.2.1. Potential new failure modes and hazards
- 2.2.2. Identification of embedded digital devices with undeclared content
- 2.2.3. Counterfeit, fraudulent and suspect items
- 2.2.4. Computer security considerations
- 2.3. Organizational challenges
- 2.3.1. Procurement and definition of safety requirements with contractual ties
- 2.3.2. Device selection
- 2.3.3. Generic and limited justification/qualification
- 2.3.4. Evidence required to address the commercial off the shelf device's justification
- 2.3.5. Change management
- 2.3.6. Lack of qualified and experienced personnel
- 3. Strategy for the justification of commercial industrial instrumentation and control equipment
- 3.1. Key elements to consider in the definition of the justification strategy
- 3.1.1. Definition of the justification envelope
- 3.1.2. Assessment of a commercial off the shelf device
- 3.1.3. Integration of the commercial off the shelf device in the overall instrumentation and control architecture
- 3.2. Other considerations for defining a justification strategy
- 3.2.1. Evidence
- 3.2.2. Selection of personnel involved in the justification
- 3.2.3. Graded approach
- 3.2.4. Generic versus specific justifications of a commercial off the shelf device
- 3.2.5. Computer security
- 3.2.6. Engineering judgement
- 4. Justification process
- 4.1. Step 1: Defining requirements and prerequisites
- 4.2. Step 2: Selecting candidate devices
- 4.3. Step 3: Obtaining manufacturer information and support
- 4.4. Step 4: Planning
- 4.5. Step 5: Assessing
- 4.5.1. Quality assurance, development and manufacturing processes
- 4.5.2. Functional, performance and dependability assessment
- 4.5.3. Vulnerabilities and failure modes assessment
- 4.5.4. Environmental and seismic qualification
- 4.5.5. Independent complementary assessment
- 4.6. Step 6: Identifying lifetime issues
- 4.7. Step 7: Preparing the justification documentation package
- 5. Maintenance of justification
- 5.1. Overview
- 5.2. Change and defect reporting
- 5.2.1. Item certification maintenance
- 5.2.2. Regulatory defect reporting responsibility
- 5.3. Periodic quality assurance measures
- 5.4. Security management
- 5.5. Configuration management
- 5.5.1. Changes to hardware
- 5.5.2. Changes to software