Cargando…

Commercial Pilot Airman Certification Standards - Airplane FAA-S-ACS-7A, for Airplane Single- and Multi-Engine Land and Sea.

Detalles Bibliográficos
Clasificación:Libro Electrónico
Autor principal: (FAA), Federal Aviation Administration
Formato: Electrónico eBook
Idioma:Inglés
Publicado: Ashland : Aviation Supplies & Academics, Inc., 2018.
Colección:Airman Certification Standards Series.
Temas:
Acceso en línea:Texto completo
Tabla de Contenidos:
  • Intro
  • Acknowledgments
  • Availability
  • Foreword
  • Revision History
  • Major Enhancements to Version FAA-S-ACS-7A
  • Table of Contents
  • Introduction
  • Airman Certification Standards Concept
  • Using the ACS
  • I. Preflight Preparation
  • Task A. Pilot Qualifications
  • Task B. Airworthiness Requirements
  • Task C. Weather Information
  • Task D. Cross-Country Flight Planning
  • Task E. National Airspace System
  • Task F. Performance and Limitations
  • Task G. Operation of Systems
  • Task H. Human Factors
  • Task I. Water and Seaplane Characteristics, Seaplane Bases, Maritime Rules, and Aids to Marine Navigation (ASES, AMES)
  • II. Preflight Procedures
  • Task A. Preflight Assessment
  • Task B. Flight Deck Management
  • Task C. Engine Starting
  • Task D. Taxiing (ASEL, AMEL)
  • Task E. Taxiing and Sailing (ASES, AMES)
  • Task F. Before Takeoff Check
  • III. Airport and Seaplane Base Operations
  • Task A. Communications, Light Signals, and Runway Lighting Systems
  • Task B. Traffic Patterns
  • IV. Takeoffs, Landings, and Go-Arounds
  • Task A. Normal Takeoff and Climb
  • Task B. Normal Approach and Landing
  • Task C. Soft-Field Takeoff and Climb (ASEL)
  • Task D. Soft-Field Approach and Landing (ASEL)
  • Task E. Short-Field Takeoff and Maximum Performance Climb (ASEL, AMEL)
  • Task F. Short-Field Approach and Landing (ASEL, AMEL)
  • Task G. Confined Area Takeoff and Maximum Performance Climb (ASES, AMES)
  • Task H. Confined Area Approach and Landing (ASES, AMES)
  • Task I. Glassy Water Takeoff and Climb (ASES, AMES)
  • Task J. Glassy Water Approach and Landing (ASES, AMES)
  • Task K. Rough Water Takeoff and Climb (ASES, AMES)
  • Task L. Rough Water Approach and Landing (ASES, AMES)
  • Task M. Power-Off 180° Accuracy Approach and Landing (ASEL, ASES)
  • Task N. Go-Around/Rejected Landing
  • V. Performance and Ground Reference Maneuvers
  • Task A. Steep Turns
  • Task B. Steep Spiral (ASEL, ASES)
  • Task C. Chandelles (ASEL, ASES)
  • Task D. Lazy Eights (ASEL, ASES)
  • Task E. Eights on Pylons (ASEL, ASES)
  • VI. Navigation
  • Task A. Pilotage and Dead Reckoning
  • Task B. Navigation Systems and Radar Services
  • Task C. Diversion
  • Task D. Lost Procedures
  • VII. Slow Flight and Stalls
  • Task A. Maneuvering During Slow Flight
  • Task B. Power-Off Stalls
  • Task C. Power-On Stalls
  • Task D. Accelerated Stalls
  • Task E. Spin Awareness
  • VIII. High Altitude Operations
  • Task A. Supplemental Oxygen
  • Task B. Pressurization
  • IX. Emergency Operations
  • Task A. Emergency Descent
  • Task B. Emergency Approach and Landing (Simulated) (ASEL, ASES)
  • Task C. Systems and Equipment Malfunctions
  • Task D. Emergency Equipment and Survival Gear
  • Task E. Engine Failure During Takeoff Before VMC (Simulated) (AMEL, AMES)
  • Task F. Engine Failure After Liftoff (Simulated) (AMEL, AMES)