Cargando…

Estimating for builders and surveyors /

Written for students taking courses in building and surveying, 'Estimating for Builders and Surveyors' describes and explains the method used by the estimator to build up prices or rates for items described in the SMM7 format. Each chapter is a self-contained unit related to a particular e...

Descripción completa

Detalles Bibliográficos
Clasificación:Libro Electrónico
Autor principal: Buchan, R. D.
Otros Autores: Grant, Fiona E. K., Fleming, F. W.
Formato: Electrónico eBook
Idioma:Inglés
Publicado: Oxford : Butterworth-Heinemann, [2003]
Edición:Second edition.
Temas:
Acceso en línea:Texto completo

MARC

LEADER 00000cam a2200000 i 4500
001 EBSCO_ocn894227397
003 OCoLC
005 20231017213018.0
006 m o d
007 cr cnu---unuuu
008 141103s2003 enka o 001 0 eng d
040 |a N$T  |b eng  |e rda  |e pn  |c N$T  |d E7B  |d UBY  |d OCLCF  |d YDXCP  |d OCLCQ  |d OCL  |d Z5A  |d U3W  |d OCLCQ  |d YDX  |d OCLCO  |d OCLCA  |d UKAHL  |d OCLCA  |d UHL  |d K6U  |d OCLCA  |d UKCRE  |d INARC  |d OCLCQ  |d OCLCO  |d OCLCQ  |d SFB  |d OCLCO  |d OCLCQ  |d OCLCO 
019 |a 505145828  |a 648315836  |a 1078942941  |a 1113254820  |a 1153486679  |a 1160047633 
020 |a 9781136405082  |q (electronic bk.) 
020 |a 1136405089  |q (electronic bk.) 
020 |a 9780080505954  |q (electronic bk.) 
020 |a 0080505953  |q (electronic bk.) 
020 |z 0750642718 
020 |z 9780750642712 
029 1 |a AU@  |b 000056935984 
035 |a (OCoLC)894227397  |z (OCoLC)505145828  |z (OCoLC)648315836  |z (OCoLC)1078942941  |z (OCoLC)1113254820  |z (OCoLC)1153486679  |z (OCoLC)1160047633 
043 |a e-uk--- 
050 4 |a TH435  |b .B835 2003eb 
072 7 |a TEC  |x 005000  |2 bisacsh 
082 0 4 |a 692.5  |2 22 
049 |a UAMI 
100 1 |a Buchan, R. D. 
245 1 0 |a Estimating for builders and surveyors /  |c Ross D. Buchan, F.W Eric Fleming and Fiona E.K. Grant. 
250 |a Second edition. 
264 1 |a Oxford :  |b Butterworth-Heinemann,  |c [2003] 
264 4 |c ©2003 
300 |a 1 online resource (ix, 310 pages) :  |b illustrations 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
500 |a Previous edition published as: Estimating for builders and quantity surveyors / R.D. Buchan, F.W. Fleming and J.R. Kelly : Oxford : Newnes, 1991. 
500 |a Includes index. 
588 0 |a Print version record. 
505 0 0 |t Author's note --  |t Note --  |g 1.  |t Introduction --  |t The UK construction industry --  |t Introduction to estimating --  |t The invitation to tender --  |t The estimating method --  |t Tender procedure --  |t Negotiated tender --  |t Selective tendering for design and build --  |g 2.  |t The cost of labour --  |t The all-in hourly rate --  |t The Working Rules --  |t Estimating the cost of labour --  |t Entitlement to basic and additional rates of pay --  |t Work in difficult conditions --  |t Bonus --  |t Working hours --  |t Overtime --  |t Daily fare and travel allowance --  |t Rotary shift working --  |t Night work --  |t Continuous working --  |t Tide work. 
505 0 0 |t Tunnel workRefuelling, servicing, maintenance and repairs --  |t Storage of tools --  |t Loss of clothing --  |t Transfer arrangements --  |t Subsistence allowance --  |t Periodic leave --  |t Guaranteed minimum weekly earnings --  |t Annual holidays --  |t Sick pay --  |t Benefit schemes --  |t Scaffolders --  |t Employer's Contributions for National Insurance --  |t Employer's liability insurance --  |t Construction Industry Training Board levy --  |t Redundancy funding --  |t Supervision: foremen, chargehands, gangers --  |t Bonus, incentive and productivity schemes --  |t Excess overtime allowance --  |t Practical estimating --  |g 3.  |t Mechanical plant --  |t Introduction --  |t Purchase or hire --  |t The plant rate. 
505 0 0 |t DepreciationLife of plant --  |t Hours worked per annum --  |t Repairs and renewals --  |t Tracks and tyres --  |t Inflation --  |t Summary --  |g 4.  |t Preliminaries --  |t Introduction --  |t Project particulars --  |t Tender and contract documents --  |t The site/existing buildings --  |t Description of the works --  |t The contract/sub-contract --  |t Employer's requirements --  |t Contractor's cost items --  |t Nominated subcontractors --  |t Provisional work items --  |t Dayworks --  |t Collection of example costs --  |g 5.  |t Excavation and filling --  |t Site preparation --  |t Lifting turf for preservation --  |t Excavation: general remarks --  |t Hand excavation --  |t Depth and throw --  |t Soil conditions --  |t Outputs --  |t Machine excavation. 
505 0 0 |t Ground waterServices --  |t Breaking out --  |t Working space --  |t Earthwork support --  |t Disposal of water --  |t Disposal of excavated material --  |t Filling to excavations --  |t Surface packing --  |t Surface treatments --  |g 6.  |t Concrete work --  |t In situ concrete --  |t Materials --  |t Weights and volumes --  |t Shrinkage in concrete mix --  |t Costing for shrinkage --  |t Mixer costs --  |g Lab our.  |t costs --  |t Reinforcement for in situ concrete --  |t Formwork --  |t Precast concrete --  |g 7.  |t Brickwork and blockwork --  |t Introduction --  |t Mortar --  |t Bricks per wall area --  |g Lab our.  |t costs --  |t Common brickwork --  |t Brickwork sundries --  |t Facing brickwork --  |t Jointing and pointing --  |t Special brickwork --  |t Blockwork --  |g 8.  |t Underpinning. 
505 0 0 |t IntroductionShoring --  |t Underpinning --  |g 9.  |t Roof coverings --  |t Slate roofing --  |t Tile roofing --  |t Clay plain roof tiles --  |t Concrete roofing tiles --  |t Lead sheet coverings and flashings --  |t Fixing accessories for external leadwork --  |g 10.  |t Asphalt work --  |t Introduction --  |t Plant --  |t Materials --  |g Lab our. --  |t Wastage --  |t Building-up rates --  |g 11.  |t Woodwork carpentry: first fixings --  |t Special requirements --  |t Timber sizes and costs --  |t Fastenings and adhesives --  |g Lab our.  |t constants --  |t Examples of rates calculation --  |g 12.  |t Woodwork joinery: second fixings and finishings --  |t Introduction --  |g 13.  |t Structural steelwork and metalwork --  |t Introduction. 
505 0 0 |t Isolated structural metal members (G12). 
520 |a Written for students taking courses in building and surveying, 'Estimating for Builders and Surveyors' describes and explains the method used by the estimator to build up prices or rates for items described in the SMM7 format. Each chapter is a self-contained unit related to a particular element in the building. Worked examples throughout reflect both traditional and up-to-date technology. Written by an author team of academics and professional surveyors, this book continues to be an invaluable introduction to the subject of estimating. 
590 |a eBooks on EBSCOhost  |b EBSCO eBook Subscription Academic Collection - Worldwide 
650 0 |a Building  |x Estimates  |z Great Britain. 
650 6 |a Construction  |x Devis estimatifs  |z Grande-Bretagne. 
650 7 |a TECHNOLOGY & ENGINEERING  |x Construction  |x General.  |2 bisacsh 
650 7 |a Building  |x Estimates  |2 fast 
651 7 |a Great Britain  |2 fast 
650 7 |a Sachverständiger  |2 gnd 
650 7 |a Kostenrechnung  |2 gnd 
650 7 |a Bauablauf  |2 gnd 
651 7 |a Großbritannien  |2 gnd 
700 1 |a Grant, Fiona E. K. 
700 1 |a Fleming, F. W. 
700 1 |a Buchan, R. D.  |t Estimating for builders and quantity surveyors. 
776 0 8 |i Print version:  |a Buchan, R.D.  |t Estimating for builders and surveyors.  |b Second edition  |z 0750642718  |w (OCoLC)49044253 
856 4 0 |u https://ebsco.uam.elogim.com/login.aspx?direct=true&scope=site&db=nlebk&AN=881334  |z Texto completo 
938 |a Askews and Holts Library Services  |b ASKH  |n AH23085106 
938 |a Askews and Holts Library Services  |b ASKH  |n AH23061250 
938 |a ebrary  |b EBRY  |n ebr10188591 
938 |a EBSCOhost  |b EBSC  |n 881334 
938 |a Internet Archive  |b INAR  |n estimatingforbui0000buch 
938 |a YBP Library Services  |b YANK  |n 17889070 
938 |a YBP Library Services  |b YANK  |n 12147442 
938 |a YBP Library Services  |b YANK  |n 2613912 
994 |a 92  |b IZTAP