Cargando…

Construction estimating : a step-by-step guide to a successful estimate /

Go online and type in "construction, estimating" and you will get over 25 estimating and takeoff software programs. There are programs for all the trades and for large, midsized, and small contractors, in both building and heavy construction. Now type in "construction contractor, fail...

Descripción completa

Detalles Bibliográficos
Clasificación:Libro Electrónico
Autor principal: Schmid, Karl F.
Formato: Electrónico eBook
Idioma:Inglés
Publicado: New York : Momentum Press, Ã2012.
Temas:
Acceso en línea:Texto completo

MARC

LEADER 00000cam a2200000Ma 4500
001 EBSCO_ocn793581614
003 OCoLC
005 20231017213018.0
006 m o d
007 cr |n|---|||||
008 120206s2012 nyu o 001 0 eng d
040 |a MNU  |b eng  |e pn  |c MNU  |d TXA  |d OCLCO  |d YDXCP  |d OCLCQ  |d N$T  |d NYMPP  |d E7B  |d OCLCF  |d OCLCQ  |d AGLDB  |d CPO  |d UPM  |d STF  |d OCLCQ  |d VTS  |d M8D  |d OCLCO  |d OCLCQ 
020 |a 160650293X  |q (electronic bk.) 
020 |a 9781606502938  |q (electronic bk.) 
020 |z 9781606502921  |q (softcover) 
020 |z 1606502921  |q (softcover) 
029 1 |a CHBIS  |b 010492603 
029 1 |a DEBBG  |b BV043147845 
029 1 |a DEBSZ  |b 421312092 
029 1 |a NZ1  |b 16077730 
029 1 |a AU@  |b 000062327628 
029 1 |a AU@  |b 000054187767 
035 |a (OCoLC)793581614 
050 4 |a TH435  |b .S34 2012 
072 7 |a TEC  |x 005040  |2 bisacsh 
082 0 4 |a 692/.5  |2 23 
049 |a UAMI 
100 1 |a Schmid, Karl F. 
245 1 0 |a Construction estimating :  |b a step-by-step guide to a successful estimate /  |c Karl F. Schmid. 
260 |a New York :  |b Momentum Press,  |c Ã2012. 
300 |a 1 online resource 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
588 0 |a Print version record. 
500 |a Includes index. 
505 0 |a 1. Initial assessment -- Initial assessment checklist. 
505 8 |a 2. Work analysis -- Work analysis checklist -- Value engineering. 
505 8 |a 3. Programming -- 3.1 Gantt (bar) charts and linked bar charts -- 3.2 Critical path method (CPM) -- 3.3 Line of balance -- 3.4 Q. scheduling. 
505 8 |a 4. Costing -- Construction accounting overview -- Costing: general -- Mobilization -- Plant operations -- Direct expenses -- Indirect and overhead expenses. 
505 8 |a 5. Cost distribution and summarization -- Indirect and overhead cost distribution -- Provisional rate for estimating -- Summarization. 
505 8 |a 6. Miscellany -- 6.1 Insurances -- 6.2 Subcontractor selection -- 6.3 Alteration work -- 6.4 Concrete forms -- 6.5 Hydraulic and machineroomless elevators -- 6.6 Value engineering -- Planning phase -- Implementation phase -- Analysis phase -- Development phase -- Recommendation phase -- Follow-up phase -- 6.7 Non- computer- based critical path method -- 6.8 Line-of-balance scheduling -- 6.9 Q. scheduling -- 6.10 Sizing portable heaters -- 6.11 Summarizing your bid -- 6.12 The 27 times table -- 6.13 Board measure (BM) -- 6.14 Inches to decimals of 1 foot -- 6.15 Conversion factors -- 6.16 Sizing electrical wiring -- 6.17 Miscellaneous rough carpentry -- 6.18 Miscellaneous finish carpentry -- 6.19 Board measure, size, and weight -- 6.20 Nails and fasteners. 
505 8 |a 7. Glossary -- Index. 
520 3 |a Go online and type in "construction, estimating" and you will get over 25 estimating and takeoff software programs. There are programs for all the trades and for large, midsized, and small contractors, in both building and heavy construction. Now type in "construction contractor, failures" and scan the various responses. You will learn that according to the Surety Information Office the contractor failure rate is about 25% for trade contractors and 22% for heavy, highway contractors. These figures have been fairly constant for years. You will also learn that poor estimating is a major cause of these failures. 
590 |a eBooks on EBSCOhost  |b EBSCO eBook Subscription Academic Collection - Worldwide 
650 0 |a Building  |x Estimates. 
650 6 |a Construction  |x Devis estimatifs. 
650 7 |a TECHNOLOGY & ENGINEERING  |x Construction  |x Estimating.  |2 bisacsh 
650 7 |a Building  |x Estimates.  |2 fast  |0 (OCoLC)fst00840585 
776 0 8 |i Print version:  |z 9781606502921  |z 1606502921 
856 4 0 |u https://ebsco.uam.elogim.com/login.aspx?direct=true&scope=site&db=nlebk&AN=501165  |z Texto completo 
938 |a ebrary  |b EBRY  |n ebr10528329 
938 |a EBSCOhost  |b EBSC  |n 501165 
938 |a Momentum Press  |b NYMP  |n 9781606502938 
938 |a YBP Library Services  |b YANK  |n 7136368 
994 |a 92  |b IZTAP