Interim report on Air Force base level automation environment : report to the Department of the Air Force /
Clasificación: | Libro Electrónico |
---|---|
Autores Corporativos: | , , , |
Otros Autores: | |
Formato: | Electrónico eBook |
Idioma: | Inglés |
Publicado: |
Washington, D.C. :
National Academy Press,
[1986]
|
Temas: | |
Acceso en línea: | Texto completo |
Tabla de Contenidos:
- Interim Report on Air Force Base Level Automation Environment
- Copyright
- PREFACE
- STATEMENT OF TASK
- Contents
- I. INTRODUCTION
- II. SUMMARY OF FINDINGS AND RECOMMENDATIONS
- A. SUMMARY OF FINDINGS
- FINDING #1
- AIR FORCE PROGRESS ON BASE-LEVEL AUTOMATION.
- FINDING #2
- A WINDOW OF OPPORTUNITY.
- FINDING #3
- DEPENDENCE OF WING/BASE-LEVEL UNITS ON AUTOMATION SUPPORT.
- FINDING #4
- DEVELOPMENT/MAINTENANCE OF BASE-LEVEL INFORMATION SYSTEMS.
- B. SUMMARY OF RECOMMENDATIONS
- RECOMMENDATION #1
- PHASE IV POST-IMPLEMENTATION ENCHANCEMENT PLAN.
- RECOMMENDATION #2
- STANDARD BASE-LEVEL AUTOMATION CONFIGURATION.RECOMMENDATION #3
- BASE-LEVEL LOGISTICS AND OPERATIONS/COMBAT SUPPORT FUNCTIONS.
- RECOMMENDATION #4
- SYSTEM PROGRAM OFFICE/PRIME SYSTEMS CONTRACTOR CONCEPT.
- C. CORRESPONDENCE OF FINDINGS AND RECOMMENDATIONS
- III. DISCUSSION OF FINDINGS
- FINDING #1
- AIR FORCE PROGRESS ON BASE-LEVEL AUTOMATION.
- a. The concept of a standard base-level automated support system is sound.
- b. The Phase IV capital replacement program is going well, but additional, well-directed efforts are needed to bring it to�
- C. The Air Force has taken important initial steps to evolve toward a more powerful post-Phase IV base-level system, but�FINDING #2
- A WINDOW OF OPPORTUNITY.
- FINDING #3
- DEPENDENCE OF WING/BASE-LEVEL UNITS ON AUTOMATION SUPPORT.
- FINDING #4
- DEVELOPMENT/MAINTENANCE OF BASE-LEVEL INFORMATION SYSTEMS.
- IV. RECOMMENDATIONS
- RECOMMENDATION #1
- PHASE IV POST-IMPLEMENTATION ENCHANCEMENT PLAN.
- RECOMMENDATION #2
- STANDARD BASE-LEVEL AUTOMATION CONFIGURATION.
- RECOMMENDATION #3
- BASE-LEVEL LOGISTICS AND OPERATIONS/COMBAT SUPPORT FUNCTIONS.
- RECOMMENDATION #4
- SYSTEM PROGRAM OFFICE/PRIME SYSTEMS CONTRACTOR CONCEPT.Appendix A Automated Data Systems Used to Support Base-Level Functions
- Appendix B Glossary of Terms and Acronyms
- Appendix C Phase IV Post-Implementation Enhancement Plan Outline
- APPENDICES