Improving the accuracy of early cost estimates for federal construction projects /
Clasificación: | Libro Electrónico |
---|---|
Autor Corporativo: | |
Formato: | Electrónico eBook |
Idioma: | Inglés |
Publicado: |
Washington, D.C. :
National Academy Press,
1990.
|
Temas: | |
Acceso en línea: | Texto completo |
Tabla de Contenidos:
- Improving the Accuracy of Early Cost Estimates for Federal Construction Projects
- Copyright
- Preface
- Contents
- Executive Summary
- PUTTING THE PROBLEM IN PERSPECTIVE
- COMMITTEE RECOMMENDATIONS
- 1 Introduction
- STUDY SCOPE AND EMPHASIS
- CONSTRUCTION COST ESTIMATING TERMINOLOGY
- FOCUS OF THE REPORT
- 2 Factors Other Than Estimates That Contribute to Budget-Related Problems
- ELEMENTS OF THE CONSTRUCTION PROCESS
- Identification of User Needs
- Preliminary Screening of User Requests
- Development of a Program of Requirements
- Development of a Concept/Schematic DesignDevelopment of Contract Documents and a Final Estimate
- Award of a Construction Contract
- KEYS TO A SUCCESSFUL PROJECT
- Accurate Definition of User Needs
- Effective Management of Design
- Well-prepared Construction Documents
- Effective Construction Execution
- COMMITTEE SUGGESTIONS FOR IMPROVING THE PROCESS
- Involvement of Federal Personnel
- Procedures to Ensure Accurate Statements of User Needs
- 3 Procedures Currently Used by Federal Agencies to Prepare Early Estimates
- PRE-PROGRAMMING ESTIMATES
- PROGRAM ESTIMATESCONCEPT/SCHEMATIC AND DESIGN DEVELOPMENT ESTIMATES
- COMMITTEE OBSERVATIONS
- 4 Suggestions for Improving the Early Estimating Procedures for Federal Agencies
- INTERAGENCY COOPERATION
- Standardization of Terminology
- Standardization of Estimating Formats
- Joint Research Efforts
- Pooling of Cost Data
- THE IMPORTANCE OF A-E ESTIMATORS
- USE OF PARAMETRIC ESTIMATES
- USE OF PROBABILISTIC ESTIMATING
- Appendix A The Views of Agency Representatives on the Nature and Causes of Budget-Related Problems ...
- Appendix B The Construction Budget Preparation Process at the Naval Facilities Engineering Command Appendix C The Construction Budget Preparation Process at IBM Corporation
- Appendix D Current Procedures for Preparing Early Estimates
- SINGLE UNIT ESTIMATES
- Estimates Based on Function-of-Use Units
- Estimates Based on Areas or Volume
- The Factoring Method of Preparing Budget Estimates
- MULTI-ELEMENT ESTIMATES
- Elemental Format
- CSI Format
- PARAMETRIC ESTIMATES
- PROBABILISTIC ESTIMATING AND RANGE ESTIMATING