|
|
|
|
LEADER |
00000cam a2200000 a 4500 |
001 |
EBOOKCENTRAL_on1112426550 |
003 |
OCoLC |
005 |
20240329122006.0 |
006 |
m o d |
007 |
cr un|---aucuu |
008 |
190831s2019 enk ob 001 0 eng d |
040 |
|
|
|a EBLCP
|b eng
|e pn
|c EBLCP
|d DG1
|d OCLCF
|d UKAHL
|d OCLCQ
|d OCLCO
|d LUU
|d K6U
|d OCLCQ
|d OCLCO
|d OCLCL
|
020 |
|
|
|a 9781119649205
|
020 |
|
|
|a 111964920X
|
020 |
|
|
|a 9781119649229
|q (electronic bk. ;
|q oBook)
|
020 |
|
|
|a 1119649226
|q (electronic bk. ;
|q oBook)
|
020 |
|
|
|z 9781786303875
|
029 |
1 |
|
|a AU@
|b 000066005778
|
029 |
1 |
|
|a CHNEW
|b 001065512
|
029 |
1 |
|
|a CHVBK
|b 575924020
|
035 |
|
|
|a (OCoLC)1112426550
|
050 |
|
4 |
|a TF507
|
082 |
0 |
4 |
|a 385
|2 23
|
049 |
|
|
|a UAMI
|
100 |
1 |
|
|a Bensalah, Mounir.
|
245 |
1 |
0 |
|a Railway Information Modeling RIM :
|b Track to Rail Modernization /
|c Mounir Bensalah, Abdelmajid Elouadi, Hassan Mharzi.
|
260 |
|
|
|a London :
|b ISTE, Ltd. ;
|a Hoboken :
|b Wiley,
|c 2019.
|
300 |
|
|
|a 1 online resource (170 pages)
|
336 |
|
|
|a text
|b txt
|2 rdacontent
|
337 |
|
|
|a computer
|b c
|2 rdamedia
|
338 |
|
|
|a online resource
|b cr
|2 rdacarrier
|
588 |
0 |
|
|a Print version record.
|
505 |
0 |
|
|a Cover; Half-Title Page; Title Page; Copyright Page; Contents; Acknowledgments; General Introduction; 1. Introduction to BIM Integration into Railway; 1.1. Introduction; 1.2. Methodology; 1.3. Railway -- formulation of the problem; 1.4. BIM development; 1.5. BIM integration into railway projects; 1.6. Feedback from real project experiences; 1.6.1. Project Mälarbanan, Sweden; 1.6.2. TUC/Infrabel experience, Belgium; 1.6.3. BIM at SNCF maintenance department, France; 1.6.4. Crossrail, UK; 1.6.5. ONCF electrical substation, Morocco; 1.7. Discussion of the results; 1.8. Conclusions and perspectives
|
505 |
8 |
|
|a 2. BIM into Railway: Optimization of Cost by Using BIM2.1. Introduction; 2.2. Methodology; 2.3. Cost structure of a tram -- assumptions fixed for the analysis; 2.3.1. Cost structure of a tramway -- construction phase: comparative analysis; 2.3.2. Hypotheses made for the fixed and studied sub-costs in the construction phase; 2.3.3. Cost of facility maintenance; 2.3.4. Summary of costs studied -- basic hypotheses of the analysis; 2.4. Optimization of cost of a tram through the integration of BIM: a theoretical analysis; 2.4.1. Theoretical analysis of cost optimization; 2.4.2. Summary
|
505 |
8 |
|
|a 2.4.3. Discussion and analysis2.4.4. Limitations; 2.5. Conclusions and perspectives; 3. BIM and Sustainability; 3.1. Introduction; 3.2. Optimizing the use of materials for durability; 3.3. Energy efficiency; 3.4. Sustainability in the management of the life cycle; 3.5. Sustainability BIM and railway?; 3.6. Discussion of the results; 3.7. Conclusions and perspectives; 4. BIM Integration to Railway Projects -Case Study; 4.1. Introduction; 4.2. Methodology; 4.3. Integrating BIM into railway projects: review of experiences; 4.3.1. Focus on BIM
|
505 |
8 |
|
|a 4.3.2. Building information modeling: a literature review4.3.3. BIM software examples; 4.4. Integrating BIM into railway projects: review of experiences; 4.4.1. Crossrail, UK; 4.4.2. Infrabel, Belgium; 4.4.3. STA, Sweden; 4.4.4. BIM France, France; 4.4.5. NNRA, Norway; 4.4.6. Summary and discussion of the review of experiences; 4.5. ONCF/Colas Rail Maroc electrical substation -- BIM integration; 4.5.1. Context of the collaboration; 4.5.2. Methodology; 4.5.3. Key step and planning of realization; 4.5.4. Comments on the results; 4.5.5. Recommendations; 4.6. General discussion
|
505 |
8 |
|
|a 4.7. Conclusions and perspectives5. How to Successfully Integrate BIM into a Railway Project -- Framework; 5.1. Framework for the adoption and implementation of BIM -- literature review; 5.2. Summary; 5.3. Framework for the adoption and implementation of BIM -- experience review; 5.3.1. BIM charter; 5.4. Conclusions of the case study; 5.4.1. Systra; 5.4.2. Egis; 5.4.3. Setec; 5.4.4. Colas Rail; 5.5. Discussion of the results; 5.6. Conclusions and perspectives; 6. Railway Information Modeling -- Project Management; 6.1. Reminder of the fundamentals of BIM
|
500 |
|
|
|a 6.2. BIM and legal environment of the projects
|
504 |
|
|
|a Includes bibliographical references and index.
|
520 |
|
|
|a Building Information Modeling (BIM) is the digital and graphical representation of the physical and functional characteristics of a structure. It provides a reliable basis for decisions throughout a building's lifecycle, and with BIM it is possible to design, plan, build and track projects. In particular, BIM has sparked a transformation of the railway sector. Railway Information Modeling RIM is a compilation of two years' worth of academic, conceptual and practical research on the integration of BIM into railway. It summarizes and focuses on a survey carried out by the authors, who are experts in the field. The book also contains a literature review and a case study to demonstrate the benefits and sustainability of BIM integration, and finishes with the practical steps and considerations for the successful management of the integration process.
|
590 |
|
|
|a ProQuest Ebook Central
|b Ebook Central Academic Complete
|
650 |
|
0 |
|a Railroads
|x Data processing.
|
650 |
|
7 |
|a Railroads
|x Data processing
|2 fast
|
700 |
1 |
|
|a Elouadi, Abdelmajid.
|
700 |
1 |
|
|a Mharzi, Hassan.
|
758 |
|
|
|i has work:
|a Railway Information Modeling RIM (Text)
|1 https://id.oclc.org/worldcat/entity/E39PCFHWkm3tyxGYDgY44yG6YX
|4 https://id.oclc.org/worldcat/ontology/hasWork
|
776 |
0 |
8 |
|i Print version:
|a Bensalah, Mounir.
|t Railway Information Modeling RIM : Track to Rail Modernization.
|d Newark : John Wiley & Sons, Incorporated, ©2019
|z 9781786303875
|
856 |
4 |
0 |
|u https://ebookcentral.uam.elogim.com/lib/uam-ebooks/detail.action?docID=5849255
|z Texto completo
|
938 |
|
|
|a Askews and Holts Library Services
|b ASKH
|n BDZ0040188259
|
938 |
|
|
|a ProQuest Ebook Central
|b EBLB
|n EBL5849255
|
994 |
|
|
|a 92
|b IZTAP
|