Guidelines for integrating process safety into engineering projects /
There is much industry guidance on implementing engineering projects and a similar amount of guidance on Process Safety Management (PSM). However, there is a gap in transferring the key deliverables from the engineering group to the operations group, where PSM is implemented. This book provides the...
Clasificación: | Libro Electrónico |
---|---|
Autor Corporativo: | |
Formato: | Electrónico eBook |
Idioma: | Inglés |
Publicado: |
New York :
American Institute of Chemical Engineers,
2019.
|
Temas: | |
Acceso en línea: | Texto completo |
Tabla de Contenidos:
- Intro
- GUIDELINES FOR INTEGRATING PROCESS SAFETY INTO ENGINEERING PROJECTS
- Contents
- List of Figures
- List of Tables
- Acronyms and Abbreviations
- Glossary
- Acknowledgments
- Files on the Web
- Preface
- 1 INTRODUCTION
- 1.1 Background and Scope
- 1.2 Why Integrating Process Safety is Important
- 1.3 What Type of Projects Are Included?
- 1.4 Project Life Cycle
- 1.5 Relationship to Other Programs
- 1.6 Structure of this Document
- 2 PROJECT MANAGEMENT CONCEPTS AND PRINCIPLES
- 2.1 Common Principles and Structure
- 2.1.1 Statement of Requirements
- 2.1.2 Project Scope
- 2.1.3 Basis of Design
- 2.1.4 Project Budget
- 2.1.5 Project Plan
- 2.1.6 Project Life Cycle
- 2.2 Project Management
- 2.3 Project Governance
- 2.4 Types of Project
- 2.4.1 Greenfield Projects
- 2.4.2 Brownfield Projects
- 2.4.3 Retrofit / Expansion Projects
- 2.4.4 Control System Upgrade Projects
- 2.4.5 Demolition Projects
- 2.4.6 Management of Change Projects
- 2.4.7 Mothballing Projects
- 2.4.8 Re-Commissioning Projects
- 2.4.9 Restarting a Project
- 2.4.10 Post-Incident Projects
- 2.5 Project Organization
- 2.5.1 Pre-Project Team
- 2.5.2 Typical Project Team
- 2.5.3 Unit Based Team
- 2.5.4 Equipment Based Team
- 2.5.5 Site Based Team
- 2.5.6 Small Projects
- 2.5.7 Roles and Responsibilities
- 2.6 Strategies for Implementation
- 2.6.1 Contractor Selection
- 2.6.2 Engineering Only
- 2.6.3 Engineering and Procurement
- 2.6.4 Engineering, Procurement and Construction
- 2.6.5 Operation
- 2.6.6 Contractor Oversight
- 2.7 Risk Management
- 2.8 Project Controls
- 2.8.1 Planning and Progress
- 2.8.2 Estimates, Budgets and Cost Control
- 2.8.3 Reporting
- 2.8.4 Metrics
- 2.8.5 Action Tracking
- 2.8.6 Change Management
- 2.9 Other Considerations
- 2.9.1 Materials Management
- 2.9.2 Quality Management.
- 2.9.3 Lessons Learned
- 2.9.4 Post-Project Close-Out
- 2.10 Stage Gate Reviews
- 3 FRONT END LOADING 1
- 3.1 Preliminary Hazard Identification
- 3.2 Preliminary Inherently Safer Design Review
- 3.3 Concept Risk Analysis
- 3.4 Other Activities
- 3.4.1 Process Safety and EHS Plan
- 3.4.2 Risk Register
- 3.4.3 Action Tracking
- 3.5 Stage Gate Review
- 3.6 Summary
- 4 FRONT END LOADING 2
- 4.1 Evaluation of Development Options
- 4.1.1 Hazard Identification
- 4.1.2 Preliminary Inherently Safer Design Review
- 4.1.3 Concept Risk Analysis
- 4.1.4 Selection of the Development Option
- 4.2 Further Definition of the Selected Option
- 4.2.1 Design Hazard Management Process
- 4.2.2 Preliminary Inherently Safer Design (ISD)
- 4.2.3 Hazard Identification and Risk Analysis (HIRA)
- 4.2.4 Engineering Design Regulations, Codes, and Standards
- 4.2.5 Design Philosophies/Strategies
- 4.2.6 Preliminary Facility Siting Study
- 4.2.7 Preliminary Fire and Explosion Analysis
- 4.2.8 Transportation Studies
- 4.2.9 Preliminary Blowdown and Depressurization Study
- 4.2.10 Preliminary Fire andamp
- Gas Detection Study
- 4.2.11 Preliminary Fire Hazard Analysis
- 4.2.12 Preliminary Firewater Analysis
- 4.2.13 Preliminary Security Vulnerability Analysis
- 4.2.14 Other Engineering Design Considerations
- 4.3 Other Activities
- 4.3.1 EHS and Process Safety Plan
- 4.3.2 Risk Register
- 4.3.3 Action Tracking
- 4.3.4 HIRA Strategy
- 4.3.5 Documentation
- 4.3.6 Stage Gate Review
- 4.4 Summary
- 5 FRONT END LOADING 3
- 5.1 Evaluation of Development Options
- 5.2 Further Definition of the Selected Option
- 5.2.1 Design Hazard Management Process
- 5.2.2 Inherently Safer Design Optimization
- 5.2.3 Facility Siting and Layout
- 5.2.4 Refine Design Safety Measures
- 5.2.5 Set Performance Standards.
- 5.2.6 Hazard Identification and Risk Analysis (HIRA)
- 5.2.7 Safety Assessments
- 5.2.8 Re-Evaluate Major Accident Risk
- 5.2.9 Finalize Important Safety Decisions
- 5.2.10 Finalize Basis of Design
- 5.3 Other Engineering Considerations
- 5.3.1 Asset Integrity Management
- 5.3.2 Quality Management
- 5.3.3 Contractor Selection
- 5.3.4 Brownfield Developments
- 5.4 Other Activities
- 5.4.1 EHS and Process Safety Plans
- 5.4.2 Risk Register
- 5.4.3 Action Tracking
- 5.4.4 Change Management
- 5.4.5 Documentation
- 5.4.6 Preparation for Project Execution
- 5.5 Case for Safety
- 5.6 Stage Gate Review
- 5.7 Summary
- 6 DETAILED DESIGN STAGE
- 6.1 Detailed Design
- 6.1.1 Design Hazard Management Process
- 6.1.2 Inherently Safer Design Optimization
- 6.1.3 Site Layout
- 6.1.4 Design Safety Measures
- 6.1.5 Set Performance Standards
- 6.1.6 Hazard Identification and Risk Analysis (HIRA)
- 6.1.7 Safety Assessments
- 6.1.8 Re-Evaluate Major Accident Risk
- 6.1.9 Other Design Reviews
- 6.2 Procurement
- 6.3 Asset Integrity Management
- 6.4 Other Process Safety Activities
- 6.4.1 Case For Safety
- 6.5 Other Project Activities
- 6.5.1 EHS and Process Safety Plans
- 6.5.2 Risk Register
- 6.5.3 Action Tracking
- 6.5.4 Change Management
- 6.5.5 Documentation
- 6.5.6 Constructability
- 6.5.7 Contractor Selection
- 6.6 Preparation for Construction
- 6.7 Preparation for Pre-Commissioning, Commissioning, and Startup
- 6.8 Stage Gate Review
- 6.9 Summary
- 7 CONSTRUCTION
- 7.1 Planning
- 7.2 Pre-Mobilization
- 7.3 Mobilization
- 7.4 Execution
- 7.4.1 Procurement
- 7.4.2 Fabrication
- 7.4.3 Safety Culture
- 7.4.4 Workforce Involvement
- 7.4.5 Stakeholder Outreach
- 7.4.6 Contractor Management
- 7.4.7 Transportation
- 7.4.8 Equipment and Materials Handling
- 7.4.9 Hazard Evaluation
- 7.4.10 Engineering Design.
- 7.4.11 Safe Work Practices
- 7.4.12 Operating, EHS and Process Safety Procedures
- 7.4.13 Training and Competence Assurance
- 7.4.14 Asset Integrity Management
- 7.4.15 Change Management
- 7.4.16 Emergency Response
- 7.4.17 Incident Investigation
- 7.4.18 Auditing
- 7.4.19 Performance Measurement
- 7.4.20 Operations Case for Safety
- 7.4.21 Pre-Commissioning
- 7.4.22 Mechanical Completion
- 7.4.23 Documentation
- 7.5 Other Project Activities
- 7.5.1 EHS and Process Safety Plans
- 7.5.2 Risk Register
- 7.5.3 Action Tracking
- 7.5.4 General Construction Management
- 7.6 De-Mobilization
- 7.7 Preparation for Commissioning and Startup
- 7.8 Final Evaluation and Close-out
- 7.9 Stage Gate Review
- 7.10 Summary
- 8 QUALITY MANAGEMENT
- 8.1 Design/Engineering
- 8.2 Procurement
- 8.3 Fabrication
- 8.4 Receipt
- 8.5 Storage and Retrieval
- 8.6 Construction and Installation
- 8.7 Operation
- 8.8 Documentation
- 8.9 Summary
- 9 COMMISSIONING AND STARTUP
- 9.1 Preparation
- 9.1.1 Planning
- 9.1.2 Safety
- 9.2 Operational Readiness
- 9.2.1 Pre-Startup Stage Gate Review
- 9.2.2 Operational Readiness Review
- 9.2.3 Start-Up Efficiency Review
- 9.3 Commissioning
- 9.3.1 Equipment Testing
- 9.3.2 Commissioning Procedures
- 9.4 Startup
- 9.4.1 Preparation for Startup
- 9.4.2 Calibration of Instruments and Analyzers
- 9.4.3 Startup with Process Chemicals/Fluids
- 9.5 Common Process Safety Elements
- 9.5.1 Hazard Evaluation
- 9.5.2 Safe Work Practices
- 9.5.3 Procedures
- 9.5.4 Training and Competence Assurance
- 9.5.5 Management of Change
- 9.5.6 Incident Investigation
- 9.5.7 Emergency Response
- 9.5.8 Auditing
- 9.5.9 Documentation
- 9.5.10 Performance Measurement
- 9.6 Other Project Activities
- 9.6.1 EHS and Process Safety Plans
- 9.6.2 Risk Register
- 9.6.3 Action Tracking
- 9.7 Performance Test Runs.
- 9.8 Handover
- 9.9 Preparation for Ongoing Operation
- 9.10 Project Close-Out
- 9.10.1 Close Out Report
- 9.10.2 Post-Project Evaluation
- 9.11 Summary
- 10 OPERATION
- 10.1 Process Safety Management System
- 10.1.1 Process Safety Culture
- 10.1.2 Compliance with Standards
- 10.1.3 Process Safety Competency
- 10.1.4 Workforce Involvement
- 10.1.5 Stakeholder Outreach
- 10.1.6 Process Knowledge Management
- 10.1.7 Hazard Identification and Risk Analysis
- 10.1.8 Operating Procedures
- 10.1.9 Safe Work Practices
- 10.1.10 Asset Integrity and Reliability
- 10.1.11 Contractor Management
- 10.1.12 Training and Performance Assurance
- 10.1.13 Management of Change
- 10.1.14 Operational Readiness
- 10.1.15 Conduct of Operations
- 10.1.16 Emergency Management
- 10.1.17 Incident Investigation
- 10.1.18 Measurement and Metrics
- 10.1.19 Auditing
- 10.1.20 Management Review and Continuous Improvement
- 10.1.21 EHS and Process Safety Procedures
- 10.2 Other Project Activities
- 10.2.1 EHS and Process Safety Plans
- 10.2.2 Risk Register
- 10.2.3 Action Tracking
- 10.3 Technical Support
- 10.4 Performance Test Runs
- 10.5 Operation Stage Gate Review
- 10.6 Post-Operational Review
- 10.7 Project Close-Out
- 10.8 Summary
- 11 END OF LIFE
- 11.1 Design for Decommissioning
- 11.2 Planning for Decommissioning
- 11.2.1 Engineering Survey
- 11.2.2 Hazard Evaluation
- 11.2.3 Hazardous Materials
- 11.2.4 Process Safety Plan
- 11.2.5 Utilities
- 11.2.6 Re-Engineering
- 11.3 Decommissioning Procedures
- 11.3.1 Late-Life Operations
- 11.3.2 Cessation of Production
- 11.3.3 Cleaning and Decontamination
- 11.3.4 Mothballed Facilities And Equipment
- 11.4 Deconstruction and Demolition
- 11.4.1 Deconstruction
- 11.4.2 Demolition
- 11.5 Process Safety for Decommissioning
- 11.5.1 Contractor Management
- 11.5.2 Safety Culture.