Cargando…

Kanban Just-in Time at Toyota : Management Begins at the Workplace.

Detalles Bibliográficos
Clasificación:Libro Electrónico
Autor principal: JapanManagementAssociation
Otros Autores: Bodek, Norman, Lu, D. J.
Formato: Electrónico eBook
Idioma:Inglés
Publicado: Portland : Taylor and Francis, 1986.
Temas:
Acceso en línea:Texto completo

MARC

LEADER 00000cam a2200000Mi 4500
001 EBOOKCENTRAL_on1023532467
003 OCoLC
005 20240329122006.0
006 m o d
007 cr |n|---|||||
008 180217s1986 xx o 000 0 eng d
040 |a EBLCP  |b eng  |e pn  |c EBLCP  |d MERUC  |d YDX  |d IDB  |d OCLCQ  |d AU@  |d OCLCF  |d OCLCQ  |d OCLCO  |d OCLCQ  |d OCLCO  |d OCLCQ  |d OCLCO  |d OCLCL 
019 |a 1022985562 
020 |a 9781351436182 
020 |a 135143618X 
020 |z 0915299488 
020 |z 9780915299485 
035 |a (OCoLC)1023532467  |z (OCoLC)1022985562 
050 4 |a TS157.T6913 1989 
082 0 4 |a 658.56 
049 |a UAMI 
100 1 |a JapanManagementAssociation. 
245 1 0 |a Kanban Just-in Time at Toyota :  |b Management Begins at the Workplace. 
260 |a Portland :  |b Taylor and Francis,  |c 1986. 
300 |a 1 online resource (161 pages) 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
588 0 |a Print version record. 
505 0 |a Cover; Half Title; Title Page; Copyright Page; Table of Contents; Publisherâ#x80;#x99;s Foreword; Translatorâ#x80;#x99;s Preface; Figures; 1. The Source of Profit Is in the Manufacturing Process; Commercial Profit and Manufacturing Profit; We Cannot Be Guided by Cost Alone; True Cost Is the Size of a Plum Seed; Change Your Manufacturing Method, You Can Lower Your Cost; Production Technique and Manufacturing Technique; When You Say â#x80;#x9C;I Canâ#x80;#x99;tâ#x80;#x9D; You Admit Your Own Ignorance; To Work and To Move; Enhancing Labor Density; Utility Factor and Efficiency; Donâ#x80;#x99;t Be Misled by Apparent Efficiency. 
505 8 |a Itâ#x80;#x99;s a Crime to OverproduceEliminate Waste Thoroughly; 2. Basic Assumptions Behind the Toyota Production System; Toyota Production System and Kanban System; An Outline of the Toyota System; Characteristics of the Toyota System; The Goal Is Cost Reduction; One Goal, Many Approaches; Excess Capacity and Economic Advantage; What Is Effective Utilization?; Is It a Waste, If You Do Not Use an Expensive Machine?; High Speed and High Performance Can Be a No-No; A Little Over Time Adds Up; How to Use Yardsticks; High Efficiency Does Not Equal Lower Cost; Ratio of Operation and Ratio of Movability. 
505 8 |a Shorten the Lead TimeZero Inventory As Our Challenge; Can the Workplace Respond to Changes; 3. Leveling â#x80;#x94; Smoothing Out the Production System; Peaks and Valleys of Work; Gift Shops in Tourist Spots; On the Automobile Assembly Line; Processes Are Linked; Leveling Quantities and Types; Cycle Time; An Example of Processing a Gear; Method of Load-Smoothing Production; How to Let Things Flow; Plan Must Also Be Load-Smoothing; Easier to Establish Standard Operations; Obstruction Called Exchange of Die; Preparation and Cleanup Are the Keys; New Ideas Help Shorten the Time. 
505 8 |a Devising Plans to Shorten the Die-Exchange TimeA Manufacturing Section Chiefs Setup Guidelines; One-Shot Exchange of Die; 4. Just-In-Time and Automation; Supermarket Style; Just-In-Time; Withdrawal Is Made by the Subsequent Process; Automation with a Human Touch; Add the Wisdom of Those Who Use It; To Stop Automatically; Stop the Line; Easy-to-Observe Workplace; Visual Control; â#x80;#x9C;Have Time On Handâ#x80;#x9D;; The Visual Control Method; Cowboys Engage in Abnormality Control; 5. Workplace Control Through the Kanban System; Toyotaâ#x80;#x99;s Production Plan; Plans Are Made to Be Modified. 
505 8 |a Providing Information by the MinuteKanbanâ#x80;#x99;s Various Functions; Six Rules for the Kanban; Circulating the Kanban; A Whirligig Beetle; The Storage Area Called Store; Full-Work System; Uses in Unexpected Areas; Fewer Kanban; 6. Reality of Workplace-Determined Standard Operations; Three Components of Standard Operations; How to Determine the Cycle Time; Work Procedure (Work Sequence); Standard Stock on Hand; Methods of Determining Standard Operations; Work Combination; Overall Efficiency and Balance Between Workers; How to Implement Standard Operations; Changes in Work Combination. 
500 |a 7. Improvement Activities for Man-Hour Reduction. 
590 |a ProQuest Ebook Central  |b Ebook Central Academic Complete 
650 0 |a Just-in-time systems. 
650 0 |a Production control. 
650 0 |a Toyota Jidosha Kogyoo Kabushiki Kaisha. 
650 6 |a Juste-à-temps (Système) 
650 6 |a Production  |x Contrôle. 
650 7 |a Just-in-time systems  |2 fast 
650 7 |a Production control  |2 fast 
700 1 |a Bodek, Norman. 
700 1 |a Lu, D. J. 
758 |i has work:  |a Kanban just-in-time at Toyota (Text)  |1 https://id.oclc.org/worldcat/entity/E39PCGvKjq9yR6hJq84x9jfYrq  |4 https://id.oclc.org/worldcat/ontology/hasWork 
776 0 8 |i Print version:  |a JapanManagementAssociation.  |t Kanban Just-in Time at Toyota : Management Begins at the Workplace.  |d Portland : Taylor and Francis, ©1986  |z 9780915299485 
856 4 0 |u https://ebookcentral.uam.elogim.com/lib/uam-ebooks/detail.action?docID=5265628  |z Texto completo 
938 |a EBL - Ebook Library  |b EBLB  |n EBL5265628 
938 |a YBP Library Services  |b YANK  |n 15292929 
938 |a YBP Library Services  |b YANK  |n 15151077 
994 |a 92  |b IZTAP