Cargando…

Guide to good practice in the management of time in major projects : dynamic time modelling /

A practical treatise on the processes and standards required for the effective time management of major construction projects.

Detalles Bibliográficos
Clasificación:Libro Electrónico
Autor Corporativo: Chartered Institute of Building (Great Britain)
Formato: Electrónico eBook
Idioma:Inglés
Publicado: Hoboken, NJ, USA : CIOB / Wiley, 2018.
Edición:Second edition.
Temas:
Acceso en línea:Texto completo

MARC

LEADER 00000cam a2200000 i 4500
001 EBOOKCENTRAL_on1012713234
003 OCoLC
005 20240329122006.0
006 m o d
007 cr |||||||||||
008 171120s2018 nju ob 001 0 eng
010 |a  2017055842 
040 |a DLC  |b eng  |e rda  |e pn  |c DLC  |d OCLCF  |d YDX  |d EBLCP  |d N$T  |d DG1  |d MERER  |d UAB  |d IDB  |d TEFOD  |d UPM  |d INT  |d WYU  |d U3W  |d DLC  |d OCLCO  |d OCLCQ  |d OCLCO  |d OCLCQ  |d OCLCO  |d OCLCL 
019 |a 1022117430  |a 1183383142 
020 |a 9781119428459  |q (pdf) 
020 |a 1119428459 
020 |a 9781119428435  |q (epub) 
020 |a 1119428432 
020 |a 9781119428473  |q (electronic bk.) 
020 |a 1119428475  |q (electronic bk.) 
020 |z 9781119428398  |q (pbk.) 
020 |z 1119428394 
029 1 |a AU@  |b 000065433012 
029 1 |a CHNEW  |b 001003016 
029 1 |a CHVBK  |b 51642615X 
035 |a (OCoLC)1012713234  |z (OCoLC)1022117430  |z (OCoLC)1183383142 
037 |a 9CE67397-8353-4DE5-AE56-6A46FE8CE1FA  |b OverDrive, Inc.  |n http://www.overdrive.com 
042 |a pcc 
050 0 0 |a TH438.4 
072 7 |a TEC  |x 005000  |2 bisacsh 
082 0 0 |a 690.068/5  |2 23 
049 |a UAMI 
245 0 0 |a Guide to good practice in the management of time in major projects :  |b dynamic time modelling /  |c by Chartered Institute of Building. 
250 |a Second edition. 
264 1 |a Hoboken, NJ, USA :  |b CIOB / Wiley,  |c 2018. 
300 |a 1 online resource 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b n  |2 rdamedia 
338 |a online resource  |b nc  |2 rdacarrier 
504 |a Includes bibliographical references and index. 
505 0 |a Introduction -- Strategy -- The dynamic time model -- Developing the dynamic time model -- Managing the dynamic time model -- Communicating the dynamic time model. 
588 0 |a Print version record and CIP data provided by publisher. 
520 |a A practical treatise on the processes and standards required for the effective time management of major construction projects. 
520 |a This book uses logical step-by-step procedures and examples from inception and risk appraisal--through design and construction to testing and commissioning--to show how an effective and dynamic time model can be used to manage the risk of delay in the completion of construction projects. Integrating with the CIOB major projects contract, the new edition places increased emphasis on the dynamic time model as the way to manage time and cost in major projects, as opposed to the use of a static target baseline program. It includes a new chapter distinguishing the principal features of the dynamic time model and its development throughout the life of a project from inception to completion. 
520 |a Guide to Good Practice in the Management of Time in Major Projects -- Dynamic Time Modelling, 2nd Edition features new appendices covering matters such as complexity in construction and engineering projects, productivity guides (including specific references to the UK, Australia, and the USA), and a number of case studies dealing with strategic time management and high-density, resource-based scheduling. 
520 |a Guide to Good Practice in the Management of Time in Major Projects--Dynamic Time Modelling, 2nd Edition is an ideal handbook for project and program management professionals working on civil engineering and construction projects, including those from contractors, clients, and project management consultants. 
520 |a The Chartered Institute of Building is at the heart of a management career in construction. It is the world's largest and most influential professional body for construction management and leadership, with a Royal Charter to promote the science and practice of building and construction for the benefit of society. With over 46,000 members worldwide, the CIOB is the international voice of the building professional --Book Jacket. 
590 |a ProQuest Ebook Central  |b Ebook Central Academic Complete 
650 0 |a Building  |x Superintendence. 
650 0 |a Production scheduling. 
650 6 |a Construction  |x Direction des travaux. 
650 6 |a Ordonnancement (Gestion) 
650 7 |a TECHNOLOGY & ENGINEERING  |x Construction  |x General.  |2 bisacsh 
650 7 |a Building  |x Superintendence  |2 fast 
650 7 |a Production scheduling  |2 fast 
710 2 |a Chartered Institute of Building (Great Britain) 
758 |i has work:  |a Guide to Good Practice in the Management of Time in Major Projects: Dynamic Time Modelling (Text)  |1 https://id.oclc.org/worldcat/entity/E39PCY8kVbwPrhmM7f3Wbm4bbd  |4 https://id.oclc.org/worldcat/ontology/hasWork 
776 0 8 |i Print version:  |t Guide to good practice in the management of time in major projects.  |b Second edition.  |d Hoboken, NJ, USA : Wiley, 2018  |z 9781119428398  |w (DLC) 2017052026 
856 4 0 |u https://ebookcentral.uam.elogim.com/lib/uam-ebooks/detail.action?docID=5261500  |z Texto completo 
938 |a EBL - Ebook Library  |b EBLB  |n EBL5261500 
938 |a EBSCOhost  |b EBSC  |n 1702743 
938 |a YBP Library Services  |b YANK  |n 15191670 
938 |a YBP Library Services  |b YANK  |n 15143290 
994 |a 92  |b IZTAP