Cargando…

Activity based costing for construction companies /

Construction projects are increasingly complex, with contractors facing decreased profitability as a range of factors drive up overhead costs. While the industry has traditionally focused on managing the direct costs of projects (labor and materials, for example), Activity-Based Costing (ABC) can be...

Descripción completa

Detalles Bibliográficos
Clasificación:Libro Electrónico
Autor principal: Kim, Yong-Woo, 1972- (Autor)
Formato: Electrónico eBook
Idioma:Inglés
Publicado: Chichester, West Sussex, UK : John Wiley & Sons Ltd, 2017.
Temas:
Acceso en línea:Texto completo

MARC

LEADER 00000cam a2200000 i 4500
001 EBOOKCENTRAL_ocn968926359
003 OCoLC
005 20240329122006.0
006 m o d
007 cr cnu---unuuu
008 170118t20172017enka ob 001 0 eng d
010 |a  2016044998 
040 |a N$T  |b eng  |e rda  |e pn  |c N$T  |d EBLCP  |d DG1  |d OCLCF  |d IDEBK  |d UPM  |d MERUC  |d YDX  |d LIP  |d TEFOD  |d OCLCQ  |d UAB  |d OCLCQ  |d KSU  |d INT  |d OCLCQ  |d WYU  |d U3W  |d OCLCQ  |d VT2  |d OCLCQ  |d FTB  |d OCLCO  |d S2H  |d OCLCO  |d OCLCQ  |d OCLCO  |d OCLCL  |d OCLCQ 
019 |a 969552740  |a 1066616793  |a 1111278924  |a 1228579032  |a 1290080342  |a 1303470461 
020 |a 9781119194682  |q electronic book 
020 |a 1119194687  |q electronic book 
020 |a 9781119194705  |q electronic book 
020 |a 1119194709  |q electronic book 
020 |a 9781119194699  |q electronic book 
020 |a 1119194695  |q electronic book 
020 |z 9781119194675 
020 |z 1119194679 
029 1 |a AU@  |b 000060698883 
029 1 |a CHBIS  |b 010881008 
029 1 |a CHNEW  |b 000945940 
029 1 |a CHVBK  |b 480261024 
029 1 |a DEBSZ  |b 485189038 
029 1 |a AU@  |b 000070215855 
035 |a (OCoLC)968926359  |z (OCoLC)969552740  |z (OCoLC)1066616793  |z (OCoLC)1111278924  |z (OCoLC)1228579032  |z (OCoLC)1290080342  |z (OCoLC)1303470461 
037 |a 44A3C77E-BE04-4363-A563-58B3C9DD245A  |b OverDrive, Inc.  |n http://www.overdrive.com 
050 4 |a HF5686.B7  |b K56 2017 
072 7 |a BUS  |x 001010  |2 bisacsh 
082 0 4 |a 657/.869042  |2 23 
049 |a UAMI 
100 1 |a Kim, Yong-Woo,  |d 1972-  |e author.  |1 https://id.oclc.org/worldcat/entity/E39PBJdrG9YpcHdJJc7fdgjpyd 
245 1 0 |a Activity based costing for construction companies /  |c Yong-Woo Kim. 
264 1 |a Chichester, West Sussex, UK :  |b John Wiley & Sons Ltd,  |c 2017. 
264 4 |c ©2017 
300 |a 1 online resource (xi, 165 pages) :  |b illustrations (some color) 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
504 |a Includes bibliographical references and index. 
520 |a Construction projects are increasingly complex, with contractors facing decreased profitability as a range of factors drive up overhead costs. While the industry has traditionally focused on managing the direct costs of projects (labor and materials, for example), Activity-Based Costing (ABC) can be used to manage overhead costs effectively. This proven methodology has been tested in a range of industries, but application in the construction industry seems challenging due to the different contexts of construction and volume production. 
520 |a The construction industry does not have methodologies to manage overhead costs effectively because current cost management practices focus on managing direct costs. Activity-Based Costing for Construction Companies provides guidelines on how overhead costs can be managed using this approach, providing gains in contractor competitiveness. It begins by identifying the attributes and problems of current overhead cost control systems, then presents a systematic methodology to apply ABC to the construction industry. Illustrated with a range of case studies, it also presents a map that shows construction contractors how to implement ABC to calculate and manage overhead costs accurately, identifying non- or low-value-added operations which can be improved. --Book Jacket. 
588 |a Description based on online resource; title from digital title page (viewed on November 19, 2021). 
505 0 |a Title Page ; Copyright Page; Contents; Preface; Chapter 1 Introduction; 1.1 What comprises costs in a construction company?; 1.1.1 Construction costs (project costs); 1.1.2 Overhead costs in a construction company; 1.1.3 The cost classification in use and the duality of overhead costs; 1.2 Overhead costs in new business environments; 1.3 Role of overhead cost management; 1.3.1 Overhead costing system should provide accurate costing on cost objects; 1.3.2 Overhead costing system should contribute to reducing total costs without sacrificing value; 1.4 Structure of this book; References. 
505 8 |a Chapter 2 What Is Activity-Based Costing? 2.1 Traditional accounting method: resource-based costing with volume-based allocation ; 2.1.1 Resource-based costing ; 2.1.2 Overhead costs allocation; 2.2 What are the problems with the current method?; 2.2.1 Is the current method contributing to reducing total costs?; 2.2.2 Does the current method provide accurate pricing?; 2.3 What is activity-based costing? ; 2.3.1 Definition; 2.3.2 Characteristics of ABC; 2.3.3 Objectives of ABC system; 2.4 Implementing activity-based costing ; 2.4.1 Develop an activity-based costing charter. 
505 8 |a 2.4.2 Define cost objects2.4.3 Identify activities; 2.4.4 Assign resource costs to activities; 2.4.5 Assign activity costs to cost objects; 2.5 Chapter summary; References; Chapter 3 Managing Overhead Costs in Construction Projects; 3.1 Project overhead costs as profit points; 3.2 Implementing ABC to manage project overhead costs; 3.3 Case study: xx Commercial Complex ; 3.3.1 Developing an activity-based costing charter ; 3.3.2 Workshop; 3.3.3 Defining cost objects; 3.3.4 Identifying activities; 3.3.5 Assigning resource costs to activities; 3.3.6 Assigning activity costs to cost objects. 
505 8 |a 3.4 Using ABC data for managerial purposes3.4.1 Evaluating management areas with activity analysis; 3.4.2 Evaluating subcontractors; 3.5 Chapter summary; References; Chapter 4 Managing Your General Overhead Costs; 4.1 General overhead costs; 4.2 Managing general overhead costs; 4.2.1 Accurate general overhead allocation; 4.2.2 Providing a process view for process improvements; 4.3 Does current practice for managing general overhead costs work?; 4.3.1 Resource-based costing ; 4.3.2 Volume-based assignment ; 4.4 How can ABC be implemented in managing general overhead costs? 
505 8 |a 4.4.1 Case study: xx Construction (general contractor)4.5 How can ABC data be used in managing general overhead costs?; 4.5.1 Cost driver analysis; 4.5.2 Profitability analysis for each project; 4.5.3 Profitability analysis for each market sector; 4.5.4 Profitability analysis for each customer; 4.6 Chapter summary; References; Chapter 5 Managing Overhead Costs in a Fabrication Shop; 5.1 Rebar supply system; 5.2 Case study: PQR Construction Inc. ; 5.2.1 The rebar fabrication shop's cost structure; 5.2.2 Allocation of rebar fabrication shop's costs to projects. 
590 |a ProQuest Ebook Central  |b Ebook Central Academic Complete 
650 0 |a Construction industry  |x Accounting. 
650 0 |a Activity-based costing. 
650 6 |a Construction  |x Industrie  |x Comptabilité. 
650 6 |a Comptabilité par activités. 
650 7 |a BUSINESS & ECONOMICS  |x Accounting  |x Financial.  |2 bisacsh 
650 7 |a Activity-based costing  |2 fast 
650 7 |a Construction industry  |x Accounting  |2 fast 
758 |i has work:  |a Activity based costing for construction companies (Text)  |1 https://id.oclc.org/worldcat/entity/E39PCGcQqmRj3kkbycrTRgQ3pK  |4 https://id.oclc.org/worldcat/ontology/hasWork 
776 0 8 |i Print version:  |a Kim, Yong-Woo, 1972-  |t Activity based costing for construction companies.  |d Chichester, UK ; Hoboken, NJ : John Wiley & Sons, 2017  |z 9781119194675  |w (DLC) 2016044998  |w (OCoLC)967337286 
856 4 0 |u https://ebookcentral.uam.elogim.com/lib/uam-ebooks/detail.action?docID=4789050  |z Texto completo 
938 |a EBL - Ebook Library  |b EBLB  |n EBL4789050 
938 |a EBSCOhost  |b EBSC  |n 1453369 
938 |a ProQuest MyiLibrary Digital eBook Collection  |b IDEB  |n cis36545540 
938 |a YBP Library Services  |b YANK  |n 13384596 
938 |a YBP Library Services  |b YANK  |n 13411814 
994 |a 92  |b IZTAP