Production and Maintenance Optimization Problems : Logistic Constraints and Leasing Warranty Services.
Focuses on industrial constraints such as subcontracting, warranty, and quality in manufacturing and logistic fields and gives new integrated maintenance strategies.
Clasificación: | Libro Electrónico |
---|---|
Autor principal: | |
Otros Autores: | , |
Formato: | Electrónico eBook |
Idioma: | Inglés |
Publicado: |
Somerset :
Wiley,
2016.
|
Colección: | Systems and Industrial Engineering - Robotics Series
|
Temas: | |
Acceso en línea: | Texto completo |
Tabla de Contenidos:
- Cover ; Title Page ; Copyright ; Contents; Introduction; I.1. Motivation and literature review; I.2. Overview of the topic; 1. Forecasting and Maintenance under Subcontracting Constraint with Delay in Transportation; 1.1. Introduction; 1.2. Production without retuned products; 1.2.1. Statement of the problem; 1.2.2. Notation; 1.2.3. Optimization of production policy; 1.2.4. Total production and inventory cost; 1.2.4.1. The Holt-Modigliani-Muth-Simon model; 1.2.4.2. Quadratic total cost; 1.2.5. Analytical study; 1.2.5.1. Production and inventory costs; 1.2.5.2. Service level constraint.
- 1.2.6. Numerical example1.3. Production with retuned products; 1.3.1. Statement of the problem; 1.3.2. Optimization of the production policy; 1.3.3. Analytical formulation; 1.3.3.1. Production and holding costs; 1.3.3.2. The inventory balance equation; 1.3.3.3. The service level constraint; 1.3.4. Numerical example; 1.3.5. Optimization of returned products by a specified deadline; 1.4. Joint maintenance policy; 1.4.1. Description of the problem; 1.4.2. Analytical study; 1.4.3. Numerical example; 1.5. Conclusion.
- 2. Sequentially Optimizing Production, Maintenance and Delivery Activities Taking into Account Product Returns2.1. Introduction; 2.2. Planning of production, delivery and maintenance; 2.2.1. Notation; 2.2.2. Context and assumptions; 2.2.3. Setting the problem; 2.2.4. Mathematical analysis; 2.2.4.1. Derivation of expressions of production, inventory and delivery costs; 2.2.4.2. Derivation of the expression of maintenance cost; 2.3. Transformation of the stochastic production, maintenance and delivery planning model to a deterministic equivalent; 2.3.1. Motivation.
- 2.3.2. Transforming the production, inventory and delivery cost (expression [2.11]) into a deterministic equivalent2.3.3. Transforming the service level constraint (equation [2.5]) into a deterministic equivalent; 2.3.4. Transforming the maintenance cost (expression [2.12]) into a deterministic equivalent; 2.4. Numerical example and numerical optimization procedure; 2.4.1. Numerical optimization procedure; 2.4.2. Numerical example; 2.4.3. Variability study of delivery time, returned products and service level; 2.5. Conclusion.
- 3. A Decision Optimization Model for Leased Manufacturing Equipment with Warranty for a Production-Maintenance Forecasting Problem3.1. Introduction; 3.2. Description of the problem; 3.2.1. Notation; 3.2.2. Statement of the problem; 3.3. Mathematical model; 3.3.1. Forecast production plan; 3.3.1.1. Stochastic production model; 3.3.1.2. Deterministic production model; 3.3.1.3. Service level constraint; 3.3.2. Maintenance policy; 3.3.3. Maximum additional cost for an extended warranty; 3.3.4. Minimum price at which to sell the extended warranty.