|
|
|
|
LEADER |
00000cam a2200000Mi 4500 |
001 |
EBOOKCENTRAL_ocn961453595 |
003 |
OCoLC |
005 |
20240329122006.0 |
006 |
m o d |
007 |
cr |n|---||||| |
008 |
161112s2016 xx ob 001 0 eng d |
040 |
|
|
|a EBLCP
|b eng
|e pn
|c EBLCP
|d IDEBK
|d OCLCQ
|d OCLCO
|d OCLCF
|d OCLCQ
|d MERUC
|d OCLCQ
|d CUY
|d LOA
|d ZCU
|d ICG
|d COCUF
|d ESU
|d DKC
|d AU@
|d OCLCQ
|d UKAHL
|d OCLCQ
|d OCLCO
|d OCLCQ
|d OCLCO
|d OCLCL
|
020 |
|
|
|a 9781119370857
|
020 |
|
|
|a 111937085X
|
020 |
|
|
|z 9781786300959
|
035 |
|
|
|a (OCoLC)961453595
|
050 |
|
4 |
|a HD38.5
|
082 |
0 |
4 |
|a 658.5
|2 23
|
049 |
|
|
|a UAMI
|
100 |
1 |
|
|a Rezg, Nidhal.
|
245 |
1 |
0 |
|a Production and Maintenance Optimization Problems :
|b Logistic Constraints and Leasing Warranty Services.
|
260 |
|
|
|a Somerset :
|b Wiley,
|c 2016.
|
300 |
|
|
|a 1 online resource (209 pages)
|
336 |
|
|
|a text
|b txt
|2 rdacontent
|
337 |
|
|
|a computer
|b c
|2 rdamedia
|
338 |
|
|
|a online resource
|b cr
|2 rdacarrier
|
490 |
0 |
|
|a Systems and Industrial Engineering - Robotics Series
|
588 |
0 |
|
|a Print version record.
|
505 |
0 |
|
|a Cover ; Title Page ; Copyright ; Contents; Introduction; I.1. Motivation and literature review; I.2. Overview of the topic; 1. Forecasting and Maintenance under Subcontracting Constraint with Delay in Transportation; 1.1. Introduction; 1.2. Production without retuned products; 1.2.1. Statement of the problem; 1.2.2. Notation; 1.2.3. Optimization of production policy; 1.2.4. Total production and inventory cost; 1.2.4.1. The Holt-Modigliani-Muth-Simon model; 1.2.4.2. Quadratic total cost; 1.2.5. Analytical study; 1.2.5.1. Production and inventory costs; 1.2.5.2. Service level constraint.
|
505 |
8 |
|
|a 1.2.6. Numerical example1.3. Production with retuned products; 1.3.1. Statement of the problem; 1.3.2. Optimization of the production policy; 1.3.3. Analytical formulation; 1.3.3.1. Production and holding costs; 1.3.3.2. The inventory balance equation; 1.3.3.3. The service level constraint; 1.3.4. Numerical example; 1.3.5. Optimization of returned products by a specified deadline; 1.4. Joint maintenance policy; 1.4.1. Description of the problem; 1.4.2. Analytical study; 1.4.3. Numerical example; 1.5. Conclusion.
|
505 |
8 |
|
|a 2. Sequentially Optimizing Production, Maintenance and Delivery Activities Taking into Account Product Returns2.1. Introduction; 2.2. Planning of production, delivery and maintenance; 2.2.1. Notation; 2.2.2. Context and assumptions; 2.2.3. Setting the problem; 2.2.4. Mathematical analysis; 2.2.4.1. Derivation of expressions of production, inventory and delivery costs; 2.2.4.2. Derivation of the expression of maintenance cost; 2.3. Transformation of the stochastic production, maintenance and delivery planning model to a deterministic equivalent; 2.3.1. Motivation.
|
505 |
8 |
|
|a 2.3.2. Transforming the production, inventory and delivery cost (expression [2.11]) into a deterministic equivalent2.3.3. Transforming the service level constraint (equation [2.5]) into a deterministic equivalent; 2.3.4. Transforming the maintenance cost (expression [2.12]) into a deterministic equivalent; 2.4. Numerical example and numerical optimization procedure; 2.4.1. Numerical optimization procedure; 2.4.2. Numerical example; 2.4.3. Variability study of delivery time, returned products and service level; 2.5. Conclusion.
|
505 |
8 |
|
|a 3. A Decision Optimization Model for Leased Manufacturing Equipment with Warranty for a Production-Maintenance Forecasting Problem3.1. Introduction; 3.2. Description of the problem; 3.2.1. Notation; 3.2.2. Statement of the problem; 3.3. Mathematical model; 3.3.1. Forecast production plan; 3.3.1.1. Stochastic production model; 3.3.1.2. Deterministic production model; 3.3.1.3. Service level constraint; 3.3.2. Maintenance policy; 3.3.3. Maximum additional cost for an extended warranty; 3.3.4. Minimum price at which to sell the extended warranty.
|
500 |
|
|
|a 3.3.5. Win-win interval for the extended warranty cost.
|
504 |
|
|
|a Includes bibliographical references and index.
|
520 |
8 |
|
|a Focuses on industrial constraints such as subcontracting, warranty, and quality in manufacturing and logistic fields and gives new integrated maintenance strategies.
|b This book focuses on industrial constraints such as subcontracting, warranty, and quality in manufacturing and logistic fields and gives new integrated maintenance strategies. It presents new production and maintenance Control Policies compared to the Hedging Point theory Strategy and different integrated strategies of maintenance are developed under industrial constraints in order to propose a robustness production and maintenance plan.
|
590 |
|
|
|a ProQuest Ebook Central
|b Ebook Central Academic Complete
|
650 |
|
0 |
|a Business logistics
|x Management.
|
650 |
|
6 |
|a Logistique (Organisation)
|x Gestion.
|
650 |
|
7 |
|a Business logistics
|x Management
|2 fast
|
700 |
1 |
|
|a Hajej, Zied.
|
700 |
1 |
|
|a Boschian-Campaner, Valerio.
|
758 |
|
|
|i has work:
|a Production and maintenance optimization problems (Text)
|1 https://id.oclc.org/worldcat/entity/E39PCGQ4qQXywBbr4DfKvPbwyb
|4 https://id.oclc.org/worldcat/ontology/hasWork
|
776 |
0 |
8 |
|i Print version:
|a Rezg, Nidhal.
|t Production and Maintenance Optimization Problems : Logistic Constraints and Leasing Warranty Services.
|d Somerset : Wiley, ©2016
|z 9781786300959
|
856 |
4 |
0 |
|u https://ebookcentral.uam.elogim.com/lib/uam-ebooks/detail.action?docID=4723185
|z Texto completo
|
938 |
|
|
|a Askews and Holts Library Services
|b ASKH
|n AH32064733
|
938 |
|
|
|a Askews and Holts Library Services
|b ASKH
|n AH31957205
|
938 |
|
|
|a EBL - Ebook Library
|b EBLB
|n EBL4723185
|
938 |
|
|
|a ProQuest MyiLibrary Digital eBook Collection
|b IDEB
|n cis36232495
|
994 |
|
|
|a 92
|b IZTAP
|