Formulas and calculations for drilling, production, and workover : all the formulas you need to solve drilling and production problems /
Clasificación: | Libro Electrónico |
---|---|
Autores principales: | , , |
Otros Autores: | |
Formato: | Electrónico eBook |
Idioma: | Inglés |
Publicado: |
Waltham, MA :
Gulf Professional Publishing, an imprint of Elsevier,
[2016]
|
Edición: | Fourth edition. |
Temas: | |
Acceso en línea: | Texto completo |
Tabla de Contenidos:
- 1.6. Pressure Gradient (psi/ft.), G (ppg) [USCS/British]1.7. Pressure Gradient G (SG) [SI-Metric]
- 1.8. Mud Pump Output q (bbl/stk) and Q (gpm) [USCS/British]
- 1.8.1. Triplex Pump
- 1.8.2. Duplex Pump
- 1.9. Hydraulic Horsepower
- 1.10. Estimated Weight of Drill Collars in Air
- 1.11. Open Hole and Tubular Capacity and Displacement Formulas
- 1.11.1. Capacity of Open Hole or Tubulars
- 1.11.2. Displacement of Tubulars
- 1.11.3. Annular Capacity Between Casing or Hole and Drill Pipe, Tubing, or Casing
- 1.11.4. Annular Capacity Between Casing and Multiple Strings of Tubing1.12. Amount of Cuttings Drilled per Foot of Hole Drilled
- 1.13. Annular Velocity (AV)
- 1.13.1. Metric Calculations (m/min) and (m/s)
- 1.13.2. SI Unit Calculations
- 1.14. Pump Output Required in GPM for a Desired Annular Velocity, ft./min
- 1.15. Pump Pressure/Pump Stroke Relationship (the Roughnecks Formula)
- 1.15.1. Metric Calculation
- 1.15.2. SI Unit Calculation
- 1.16. Buoyancy Factor (BF)
- 1.17. Formation Temperature (Tf)
- 1.18. Temperature Conversion Formulas
- Chapter 2: Rig Calculations2.1. Accumulator Capacity
- 2.1.1. Useable Volume per Bottle
- 2.1.2. Surface Application
- 2.1.3. English Units
- 2.1.4. Deepwater Applications
- 2.1.5. Accumulator Precharge Pressure
- 2.2. Slug Calculations
- 2.2.1. Barrels of Slug Required for a Desired Length of Dry Pipe
- 2.2.2. Weight of Slug Required for a Desired Length of Dry Pipe with a Set Volume of Slug
- 2.2.3. Volume, Height, and Pressure Gained Because of Placement of Slug in Drill Pipe
- 2.2.4. English Units Calculation
- 2.2.5. SI Calculation
- 2.3. Bulk Density of Cutting Using the Mud Balance2.4. Drill String Design
- 2.4.1. Estimated Weight of Drill Collars in Air
- 2.4.2. Tensile Strength of Tubulars in lb (Ref.: API Spec 5D & 7)
- 2.4.3. Calculate the Reduced Tensile Yield Strength in lb
- 2.4.4. Calculate the Adjusted Weight of the Drill Pipe and Tool Joints in lb/ft
- 2.4.5. Calculate the Length of BHA Necessary for a Desired Weight on the Bit
- 2.4.6. Calculate the Maximum Length of Premium Drill Pipe That Can Be Run into the Hole with a Specific BHA Assemble Base ...