Cargando…

Delay Analysis in Construction Contracts.

The most significant unanticipated costs on many construction projects are the financial impacts associated with delay and disruption to the works. Assessing these, and establishing a causal link from each delay event to its effect, contractual liability and the damages experienced as a direct resul...

Descripción completa

Detalles Bibliográficos
Clasificación:Libro Electrónico
Autor principal: Keane, P. John
Otros Autores: Caletka, Anthony F.
Formato: Electrónico eBook
Idioma:Inglés
Publicado: Hoboken : Wiley, 2015.
Edición:2nd ed.
Temas:
Acceso en línea:Texto completo

MARC

LEADER 00000cam a2200000 4500
001 EBOOKCENTRAL_ocn908519952
003 OCoLC
005 20240329122006.0
006 m o d
007 cr |n|||||||||
008 150509s2015 xx ob 001 0 eng d
040 |a EBLCP  |b eng  |e pn  |c EBLCP  |d IDEBK  |d E7B  |d CDX  |d DEBSZ  |d YDXCP  |d OCLCO  |d OCLCQ  |d OCLCO  |d OCLCF  |d D6H  |d OCLCQ  |d C6I  |d K6U  |d IDB  |d COCUF  |d CNNOR  |d Z5A  |d CCO  |d PIFFA  |d FVL  |d ZCU  |d OCLCQ  |d MERUC  |d OCLCQ  |d U3W  |d KIJ  |d STF  |d ICG  |d OCLCQ  |d G3B  |d TKN  |d COO  |d AZK  |d DKC  |d AU@  |d OCLCQ  |d OCLCO  |d OCLCQ  |d OCLCO  |d OCLCL 
019 |a 924051656  |a 961652514  |a 962681336 
020 |a 9781118631126 
020 |a 1118631129 
020 |a 9781118631133 
020 |a 1118631137 
020 |a 9781118631171  |q (cloth ;  |q alk. paper) 
020 |a 111863117X  |q (cloth ;  |q alk. paper) 
029 1 |a DEBBG  |b BV044072326 
029 1 |a DEBSZ  |b 433541415 
029 1 |a DEBSZ  |b 449476707 
029 1 |a DEBSZ  |b 453343430 
029 1 |a GBVCP  |b 819880906 
035 |a (OCoLC)908519952  |z (OCoLC)924051656  |z (OCoLC)961652514  |z (OCoLC)962681336 
050 4 |a HD9715.A2 
082 0 4 |a 690.068/5 
049 |a UAMI 
100 1 |a Keane, P. John. 
245 1 0 |a Delay Analysis in Construction Contracts. 
250 |a 2nd ed. 
260 |a Hoboken :  |b Wiley,  |c 2015. 
300 |a 1 online resource (291 pages) 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
588 0 |a Print version record. 
505 0 |a Cover; Title Page; Copyright; Contents; About the Authors; Preface to the Second Edition; Preface to the First Edition; Chapter 1 Introduction; 1.1 General; 1.1.1 Purpose of this book; 1.1.2 Guidance; 1.1.3 Construction planning and programming; 1.2 Construction delays; 1.2.1 Identifying delays; 1.2.2 Analysing construction delays; 1.2.3 Delay claim life cycle; 1.3 Burning issues in delay analysis; 1.4 Presentation and case study; Chapter 2 Construction Programmes; 2.1 Introduction; 2.1.1 Planning, programming and project controls; 2.1.2 Elements of a successful project. 
505 8 |a 2.2 Planning and programming2.2.1 Project planning; 2.2.2 Work breakdown structure; 2.3 CPM programming techniques: the fundamentals; 2.3.1 Activity durations; 2.3.2 Activity relationships; 2.3.3 Event date calculations; 2.3.4 Forward pass; 2.3.5 Backward pass; 2.3.6 Total float; 2.3.7 Constraints; 2.4 Baseline validation; 2.4.1 Joint baseline review; 2.4.2 Programme approval; 2.4.3 The project baseline; 2.5 Other planning techniques; 2.5.1 PERT -- Project Evaluation and Review Technique; 2.5.2 Gantt charts (bar charts); 2.5.3 Line of balance; 2.5.4 Critical chain method/theory of constraints. 
505 8 |a 2.6 Why use CPM planning or scheduling techniques?2.6.1 Project management; 2.6.2 As-planned programmes; 2.7 Project controls and the project control cycle; 2.7.1 Progress monitoring; 2.7.2 Process and analyse information -- Earned Value Method; 2.7.3 The cost and schedule performance curves; 2.7.4 Time control; 2.7.5 Programme updates; 2.8 Records, records, records ... ; 2.8.1 Electronic records: management and storage; 2.8.2 Electronic records in practice; 2.8.3 Document controls; 2.9 Predatory programming practices; 2.10 Guidance; Chapter 3 Identification of Construction Delays. 
505 8 |a 3.1 Establishing a basis for identifying delay3.1.1 General requirements; 3.1.2 Validation of an as-planned programme; 3.2 Factual evidence and as-built programmes; 3.2.1 As-built programme preparation; 3.2.2 Summary; 3.3 Identification of delay events; 3.3.1 Delay identification; 3.3.2 Recording delays; 3.4 Identification and analysis of disruption; 3.4.1 Disruption and delay; 3.4.2 Calculating disruption; 3.4.3 Establishing cause; 3.4.4 Total cost claims/global claims; 3.4.5 Measured mile; 3.4.6 Graphical presentation; 3.4.7 Summary; Chapter 4 Analysis of Construction Delays. 
505 8 |a 4.1 Introduction4.1.1 The use of CPM techniques; 4.1.2 Project planning software; 4.1.3 Identifying delays: cause or effect?; 4.2 Selection criteria and guidance; 4.2.1 The SCL Delay and Disruption Protocol; 4.2.2 The core statements of principle; 4.2.3 AACEI Recommended Practice No. 29R-03: Forensic Schedule Analysis; 4.2.4 Which technique to use under given circumstances; 4.3 Summary; Chapter 5 Delay Analysis Techniques; 5.1 Introduction to delay analysis techniques; 5.1.1 Additive methods of delay analysis; 5.1.2 Impacted as-planned; 5.1.3 Time impact analysis; 5.1.4 Collapsed as-built. 
500 |a 5.1.5 As-built based methods of analysis. 
520 |a The most significant unanticipated costs on many construction projects are the financial impacts associated with delay and disruption to the works. Assessing these, and establishing a causal link from each delay event to its effect, contractual liability and the damages experienced as a direct result of each event, can be difficult and complex. This book is a practical guide to the process of delay analysis and includes an in-depth review of the primary methods of delay analysis, together with the assumptions that underlie the precise calculations required in any quantitative delay analysis. T. 
504 |a Includes bibliographical references and index. 
590 |a ProQuest Ebook Central  |b Ebook Central Academic Complete 
650 0 |a Construction industry  |x Cost control. 
650 0 |a Construction industry  |x Planning. 
650 0 |a Production scheduling. 
650 0 |a Construction contracts. 
650 6 |a Construction  |x Industrie  |x Planification. 
650 6 |a Ordonnancement (Gestion) 
650 7 |a Construction contracts  |2 fast 
650 7 |a Construction industry  |x Cost control  |2 fast 
650 7 |a Construction industry  |x Planning  |2 fast 
650 7 |a Production scheduling  |2 fast 
700 1 |a Caletka, Anthony F. 
758 |i has work:  |a Delay analysis in construction contracts (Text)  |1 https://id.oclc.org/worldcat/entity/E39PCFwVVRrfKxWGwDFyYKfkj3  |4 https://id.oclc.org/worldcat/ontology/hasWork 
776 0 8 |i Print version:  |a Keane, P. John.  |t Delay Analysis in Construction Contracts.  |d Hoboken : Wiley, ©2015  |z 9781118631171 
856 4 0 |u https://ebookcentral.uam.elogim.com/lib/uam-ebooks/detail.action?docID=1895515  |z Texto completo 
936 |a BATCHLOAD 
938 |a Coutts Information Services  |b COUT  |n 30000475 
938 |a ProQuest Ebook Central  |b EBLB  |n EBL1895515 
938 |a ebrary  |b EBRY  |n ebr11050666 
938 |a ProQuest MyiLibrary Digital eBook Collection  |b IDEB  |n cis30000475 
938 |a YBP Library Services  |b YANK  |n 12405396 
938 |a YBP Library Services  |b YANK  |n 11072189 
938 |a YBP Library Services  |b YANK  |n 12673026 
994 |a 92  |b IZTAP