Cargando…

Configuration management for senior managers : essential product configuration and lifecycle management for manufacturing /

Configuration Management for Senior Managers is written to help managers in product manufacturing and engineering environments identify the ways in which they can℗ streamline their products and processes through proactive documentation control and product lifecycle management. Experienced consultant...

Descripción completa

Detalles Bibliográficos
Clasificación:Libro Electrónico
Autor principal: Watts, Frank B. (Autor)
Formato: Electrónico eBook
Idioma:Inglés
Publicado: Amsterdam : Elsevier : BH, [2015]
Temas:
Acceso en línea:Texto completo
Texto completo

MARC

LEADER 00000cam a2200000 i 4500
001 EBOOKCENTRAL_ocn907924109
003 OCoLC
005 20240329122006.0
006 m o d
007 cr cnu|||unuuu
008 150423s2015 ne o 000 0 eng d
040 |a N$T  |b eng  |e rda  |e pn  |c N$T  |d N$T  |d IDEBK  |d DG1  |d E7B  |d YDXCP  |d CDX  |d COO  |d UMI  |d DEBBG  |d EBLCP  |d DEBSZ  |d OCLCF  |d ESU  |d UAB  |d OCLCQ  |d K6U  |d MERUC  |d STF  |d D6H  |d OCLCQ  |d CEF  |d OCLCQ  |d UKMGB  |d AU@  |d OCLCQ  |d WYU  |d U3W  |d CUY  |d LOA  |d ZCU  |d OTZ  |d ICG  |d COCUF  |d DKC  |d OCLCQ  |d LQU  |d RDF  |d OCLCQ  |d UK7LJ  |d LDP  |d HS0  |d UWK  |d NLE  |d SXB  |d OCLCQ  |d OCLCO  |d OCLCQ  |d OCLCO  |d OCLCL  |d OCLCQ 
015 |a GBB552829  |2 bnb 
016 7 |a 017166221  |2 Uk 
019 |a 908074999  |a 910341711  |a 1105174611  |a 1105569336  |a 1156000418  |a 1156930315  |a 1162131451  |a 1165193477  |a 1166186285  |a 1167835521  |a 1171200169 
020 |a 9780128026014  |q (electronic bk.) 
020 |a 0128026014  |q (electronic bk.) 
020 |a 0128023821 
020 |a 9780128023822 
020 |z 9780128023822 
029 1 |a AU@  |b 000058374569 
029 1 |a AU@  |b 000061137973 
029 1 |a AU@  |b 000062428077 
029 1 |a AU@  |b 000066110658 
029 1 |a DEBBG  |b BV042683578 
029 1 |a DEBBG  |b BV042739727 
029 1 |a DEBBG  |b BV043620124 
029 1 |a DEBSZ  |b 446587869 
029 1 |a DEBSZ  |b 449491196 
029 1 |a DEBSZ  |b 451525663 
029 1 |a DEBSZ  |b 475040988 
029 1 |a GBVCP  |b 823628728 
029 1 |a NLGGC  |b 401051617 
029 1 |a UKMGB  |b 017166221 
029 1 |a AU@  |b 000057147985 
035 |a (OCoLC)907924109  |z (OCoLC)908074999  |z (OCoLC)910341711  |z (OCoLC)1105174611  |z (OCoLC)1105569336  |z (OCoLC)1156000418  |z (OCoLC)1156930315  |z (OCoLC)1162131451  |z (OCoLC)1165193477  |z (OCoLC)1166186285  |z (OCoLC)1167835521  |z (OCoLC)1171200169 
037 |a CL0500000597  |b Safari Books Online 
050 4 |a TA190 
072 7 |a BUS  |x 082000  |2 bisacsh 
072 7 |a BUS  |x 041000  |2 bisacsh 
072 7 |a BUS  |x 042000  |2 bisacsh 
072 7 |a BUS  |x 085000  |2 bisacsh 
082 0 4 |a 658.4/04  |2 22 
049 |a UAMI 
100 1 |a Watts, Frank B.,  |e author. 
245 1 0 |a Configuration management for senior managers :  |b essential product configuration and lifecycle management for manufacturing /  |c Frank B. Watts. 
264 1 |a Amsterdam :  |b Elsevier :  |b BH,  |c [2015] 
264 4 |c ©2015 
300 |a 1 online resource 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
588 0 |a Vendor-supplied metadata. 
505 0 |a Front Cover; Configuration Management for Senior Managers; Copyright; Contents; List of Figures; Preface; Policies and Critical Practices; POLICIES; CRITICAL PRACTICES; PLATINUM POLICY; Chapter One -- Introduction; Chapter Two -- Why CM; THE DIRTY HALF DOZEN; PROCESS SPEED; THROW IT OVER THE WALL; QUALITY CONTROL FOR ENGINEERING; SUMMARY; Chapter Three -- CM System, Where to Start; PROCESS MEASUREMENTS; DISTRIBUTED CM; ORGANIZATION; CHAIN OF COMMAND; CM MANAGER; ISO STANDARDS AND CERTIFICATION; DOD/MILITARY STANDARDS; BEST OF THE BEST PRACTICES; STANDARDS RESPONSIBILITY; PEOPLE REQUIRED. 
505 8 |a FUNCTION NAMERESPONSIBILITIES; REENGINEER OR CONTINUOUS IMPROVEMENT; PLAN TO IMPROVE; SUMMARY; Chapter Four -- CM and Software; SOFTWARE'S CURRENT CONDITION; MODERN TREND; PROCESS REDESIGN BEFORE SOFTWARE; CM'S ROLL IN SOFTWARE; WHAT CM SHOULD CONTROL-AND NOT; SOFTWARE (SW) AND FIRMWARE (FW) CONTROL; SUMMARY; Chapter Five -- Standard Foundation Blocks; STANDARDS WRITING; GENERAL STANDARDS; ACRONYMS AND DEFINITIONS; PART NUMBERS-SIGNIFICANT OR NOT; CLASS CODING; INTERCHANGEABILITY AND THE PART NUMBER; INTERCHANGEABILITY/PART NUMBER/REV CHANGE; ITEM/DOCUMENT NUMBERING. 
505 8 |a INTERCHANGEABILITY DISCUSSEDINTERCHANGEABILITY DEFINED; IDEAL PART/DOCUMENT NUMBER; ASSIGNMENT OF PART NUMBER AND REVISION LEVEL; REVISION LEVELS; REVISION CONTROL; PART MARKING; COGNIZANT ENGINEER; APPROVED MANUFACTURERS LIST; DEVIATIONS; SPARE PARTS; PUBLICATIONS; NAMEPLATE/SERIAL NUMBER/LABELS; TRANSMISSIONS TO CUSTOMERS; SUMMARY; Chapter Six -- Signatures on CM Documents; INVOLVEMENT VERSUS SIGNATURE; ONE AUTHOR AND ONE ACCEPTOR; SIGNING THE BOM OR PARTS LIST; JUST IN TIME; WHO OBTAINS SIGNATURES?; QUALITY ASSURANCE ROLE; TECHNICAL RELEASE; SIGNATURE ALTERNATIVES; SUMMARY. 
505 8 |a Chapter Seven -- Process ImprovementPROCESS SPEED-CASE HISTORY; CASE STUDY CHANGE PROCESS REENGINEERING; PROCESS TIME EXPECTATIONS; TEAMS; CHANGE BOARDS; FORMS; CUSTOMER ORDERS; BACKLOGS/WORK IN PROCESS; AGE REPORTS; SUMMARY; Chapter Eight -- Release Process; ENGINEERING AND COMPANY PHASES; PHASES OF RELEASE; RELEASE IN LEAD TIME; LEAD TIME RELEASE PERFORMANCE; TEAM IN RELEASE; SIGNATURES ON RELEASES; RELEASE PHASE CHART; RULES FOR RELEASE; PRODUCT SPECIFICATION RELEASE; CONTRACT/PLANNING PHASE; DESIGN AND DEVELOPMENT PHASE; PILOT PHASE; PRODUCTION PHASE; OBSOLETE; SOFTWARE RELEASE. 
505 8 |a RELEASE PROCESS STANDARDSRELEASE METRICS; RELEASE PROCESS QUALITY; RELEASE PROCESS FLOW; RELEASE TIME AND VOLUME MEASUREMENT; SUMMARY; Chapter Nine -- Bill of Material Process; DESIGN DATA; NEW PRODUCT BOM; PRODUCT COST; PLM AND ERP; ONE BOM ENTRY; OPERATIONS BOM DATA; ENGINEERING-FRIENDLY PARTS LIST; BOM CONTENT; STRUCTURING THE BOM; EVOLVE THE BOM; JUST-IN-TIME BOM; STRUCTURING FIRMWARE AND SOFTWARE; FEATURES AND OPTIONS; THE PERFECT BOM; BOM WORK FLOW; BOM STANDARDS; BOM METRICS; SUMMARY; Chapter Ten -- Request for Change Process; SEPARATE REQUEST PROCESS; DOES YOUR REQUEST PROCESS WORK? ; Cost reduction and improvements. 
520 |a Configuration Management for Senior Managers is written to help managers in product manufacturing and engineering environments identify the ways in which they can℗ streamline their products and processes through proactive documentation control and product lifecycle management. Experienced consultant Frank Watts gives a practitioner's view tailored to the needs of management, without the textbook theory that can be hard to translate into real-world change. 
546 |a English. 
590 |a O'Reilly  |b O'Reilly Online Learning: Academic/Public Library Edition 
590 |a ProQuest Ebook Central  |b Ebook Central Academic Complete 
650 0 |a Project management. 
650 0 |a Configuration management. 
650 0 |a Manufacturing industries. 
650 6 |a Gestion de projet. 
650 6 |a Gestion de configurations. 
650 6 |a Industrie manufacturière. 
650 7 |a BUSINESS & ECONOMICS  |x Industrial Management.  |2 bisacsh 
650 7 |a BUSINESS & ECONOMICS  |x Management.  |2 bisacsh 
650 7 |a BUSINESS & ECONOMICS  |x Management Science.  |2 bisacsh 
650 7 |a BUSINESS & ECONOMICS  |x Organizational Behavior.  |2 bisacsh 
650 7 |a Configuration management  |2 fast 
650 7 |a Manufacturing industries  |2 fast 
650 7 |a Project management  |2 fast 
758 |i has work:  |a Configuration management for senior managers (Text)  |1 https://id.oclc.org/worldcat/entity/E39PCFCjgdq7g79vfwt3cXyy3P  |4 https://id.oclc.org/worldcat/ontology/hasWork 
776 0 8 |i Print version:  |z 9780128026014  |w (OCoLC)907924109 
856 4 0 |u https://learning.oreilly.com/library/view/~/9780128023822/?ar  |z Texto completo 
856 4 0 |u https://ebookcentral.uam.elogim.com/lib/uam-ebooks/detail.action?docID=2030666  |z Texto completo 
938 |a Books 24x7  |b B247  |n bke00089240 
938 |a Coutts Information Services  |b COUT  |n 31458756 
938 |a ProQuest Ebook Central  |b EBLB  |n EBL2030666 
938 |a ebrary  |b EBRY  |n ebr11047011 
938 |a EBSCOhost  |b EBSC  |n 981414 
938 |a ProQuest MyiLibrary Digital eBook Collection  |b IDEB  |n cis31458756 
938 |a YBP Library Services  |b YANK  |n 12393175 
994 |a 92  |b IZTAP