Configuration management for senior managers : essential product configuration and lifecycle management for manufacturing /
Configuration Management for Senior Managers is written to help managers in product manufacturing and engineering environments identify the ways in which they can℗ streamline their products and processes through proactive documentation control and product lifecycle management. Experienced consultant...
Clasificación: | Libro Electrónico |
---|---|
Autor principal: | |
Formato: | Electrónico eBook |
Idioma: | Inglés |
Publicado: |
Amsterdam :
Elsevier : BH,
[2015]
|
Temas: | |
Acceso en línea: | Texto completo Texto completo |
MARC
LEADER | 00000cam a2200000 i 4500 | ||
---|---|---|---|
001 | EBOOKCENTRAL_ocn907924109 | ||
003 | OCoLC | ||
005 | 20240329122006.0 | ||
006 | m o d | ||
007 | cr cnu|||unuuu | ||
008 | 150423s2015 ne o 000 0 eng d | ||
040 | |a N$T |b eng |e rda |e pn |c N$T |d N$T |d IDEBK |d DG1 |d E7B |d YDXCP |d CDX |d COO |d UMI |d DEBBG |d EBLCP |d DEBSZ |d OCLCF |d ESU |d UAB |d OCLCQ |d K6U |d MERUC |d STF |d D6H |d OCLCQ |d CEF |d OCLCQ |d UKMGB |d AU@ |d OCLCQ |d WYU |d U3W |d CUY |d LOA |d ZCU |d OTZ |d ICG |d COCUF |d DKC |d OCLCQ |d LQU |d RDF |d OCLCQ |d UK7LJ |d LDP |d HS0 |d UWK |d NLE |d SXB |d OCLCQ |d OCLCO |d OCLCQ |d OCLCO |d OCLCL |d OCLCQ | ||
015 | |a GBB552829 |2 bnb | ||
016 | 7 | |a 017166221 |2 Uk | |
019 | |a 908074999 |a 910341711 |a 1105174611 |a 1105569336 |a 1156000418 |a 1156930315 |a 1162131451 |a 1165193477 |a 1166186285 |a 1167835521 |a 1171200169 | ||
020 | |a 9780128026014 |q (electronic bk.) | ||
020 | |a 0128026014 |q (electronic bk.) | ||
020 | |a 0128023821 | ||
020 | |a 9780128023822 | ||
020 | |z 9780128023822 | ||
029 | 1 | |a AU@ |b 000058374569 | |
029 | 1 | |a AU@ |b 000061137973 | |
029 | 1 | |a AU@ |b 000062428077 | |
029 | 1 | |a AU@ |b 000066110658 | |
029 | 1 | |a DEBBG |b BV042683578 | |
029 | 1 | |a DEBBG |b BV042739727 | |
029 | 1 | |a DEBBG |b BV043620124 | |
029 | 1 | |a DEBSZ |b 446587869 | |
029 | 1 | |a DEBSZ |b 449491196 | |
029 | 1 | |a DEBSZ |b 451525663 | |
029 | 1 | |a DEBSZ |b 475040988 | |
029 | 1 | |a GBVCP |b 823628728 | |
029 | 1 | |a NLGGC |b 401051617 | |
029 | 1 | |a UKMGB |b 017166221 | |
029 | 1 | |a AU@ |b 000057147985 | |
035 | |a (OCoLC)907924109 |z (OCoLC)908074999 |z (OCoLC)910341711 |z (OCoLC)1105174611 |z (OCoLC)1105569336 |z (OCoLC)1156000418 |z (OCoLC)1156930315 |z (OCoLC)1162131451 |z (OCoLC)1165193477 |z (OCoLC)1166186285 |z (OCoLC)1167835521 |z (OCoLC)1171200169 | ||
037 | |a CL0500000597 |b Safari Books Online | ||
050 | 4 | |a TA190 | |
072 | 7 | |a BUS |x 082000 |2 bisacsh | |
072 | 7 | |a BUS |x 041000 |2 bisacsh | |
072 | 7 | |a BUS |x 042000 |2 bisacsh | |
072 | 7 | |a BUS |x 085000 |2 bisacsh | |
082 | 0 | 4 | |a 658.4/04 |2 22 |
049 | |a UAMI | ||
100 | 1 | |a Watts, Frank B., |e author. | |
245 | 1 | 0 | |a Configuration management for senior managers : |b essential product configuration and lifecycle management for manufacturing / |c Frank B. Watts. |
264 | 1 | |a Amsterdam : |b Elsevier : |b BH, |c [2015] | |
264 | 4 | |c ©2015 | |
300 | |a 1 online resource | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a computer |b c |2 rdamedia | ||
338 | |a online resource |b cr |2 rdacarrier | ||
588 | 0 | |a Vendor-supplied metadata. | |
505 | 0 | |a Front Cover; Configuration Management for Senior Managers; Copyright; Contents; List of Figures; Preface; Policies and Critical Practices; POLICIES; CRITICAL PRACTICES; PLATINUM POLICY; Chapter One -- Introduction; Chapter Two -- Why CM; THE DIRTY HALF DOZEN; PROCESS SPEED; THROW IT OVER THE WALL; QUALITY CONTROL FOR ENGINEERING; SUMMARY; Chapter Three -- CM System, Where to Start; PROCESS MEASUREMENTS; DISTRIBUTED CM; ORGANIZATION; CHAIN OF COMMAND; CM MANAGER; ISO STANDARDS AND CERTIFICATION; DOD/MILITARY STANDARDS; BEST OF THE BEST PRACTICES; STANDARDS RESPONSIBILITY; PEOPLE REQUIRED. | |
505 | 8 | |a FUNCTION NAMERESPONSIBILITIES; REENGINEER OR CONTINUOUS IMPROVEMENT; PLAN TO IMPROVE; SUMMARY; Chapter Four -- CM and Software; SOFTWARE'S CURRENT CONDITION; MODERN TREND; PROCESS REDESIGN BEFORE SOFTWARE; CM'S ROLL IN SOFTWARE; WHAT CM SHOULD CONTROL-AND NOT; SOFTWARE (SW) AND FIRMWARE (FW) CONTROL; SUMMARY; Chapter Five -- Standard Foundation Blocks; STANDARDS WRITING; GENERAL STANDARDS; ACRONYMS AND DEFINITIONS; PART NUMBERS-SIGNIFICANT OR NOT; CLASS CODING; INTERCHANGEABILITY AND THE PART NUMBER; INTERCHANGEABILITY/PART NUMBER/REV CHANGE; ITEM/DOCUMENT NUMBERING. | |
505 | 8 | |a INTERCHANGEABILITY DISCUSSEDINTERCHANGEABILITY DEFINED; IDEAL PART/DOCUMENT NUMBER; ASSIGNMENT OF PART NUMBER AND REVISION LEVEL; REVISION LEVELS; REVISION CONTROL; PART MARKING; COGNIZANT ENGINEER; APPROVED MANUFACTURERS LIST; DEVIATIONS; SPARE PARTS; PUBLICATIONS; NAMEPLATE/SERIAL NUMBER/LABELS; TRANSMISSIONS TO CUSTOMERS; SUMMARY; Chapter Six -- Signatures on CM Documents; INVOLVEMENT VERSUS SIGNATURE; ONE AUTHOR AND ONE ACCEPTOR; SIGNING THE BOM OR PARTS LIST; JUST IN TIME; WHO OBTAINS SIGNATURES?; QUALITY ASSURANCE ROLE; TECHNICAL RELEASE; SIGNATURE ALTERNATIVES; SUMMARY. | |
505 | 8 | |a Chapter Seven -- Process ImprovementPROCESS SPEED-CASE HISTORY; CASE STUDY CHANGE PROCESS REENGINEERING; PROCESS TIME EXPECTATIONS; TEAMS; CHANGE BOARDS; FORMS; CUSTOMER ORDERS; BACKLOGS/WORK IN PROCESS; AGE REPORTS; SUMMARY; Chapter Eight -- Release Process; ENGINEERING AND COMPANY PHASES; PHASES OF RELEASE; RELEASE IN LEAD TIME; LEAD TIME RELEASE PERFORMANCE; TEAM IN RELEASE; SIGNATURES ON RELEASES; RELEASE PHASE CHART; RULES FOR RELEASE; PRODUCT SPECIFICATION RELEASE; CONTRACT/PLANNING PHASE; DESIGN AND DEVELOPMENT PHASE; PILOT PHASE; PRODUCTION PHASE; OBSOLETE; SOFTWARE RELEASE. | |
505 | 8 | |a RELEASE PROCESS STANDARDSRELEASE METRICS; RELEASE PROCESS QUALITY; RELEASE PROCESS FLOW; RELEASE TIME AND VOLUME MEASUREMENT; SUMMARY; Chapter Nine -- Bill of Material Process; DESIGN DATA; NEW PRODUCT BOM; PRODUCT COST; PLM AND ERP; ONE BOM ENTRY; OPERATIONS BOM DATA; ENGINEERING-FRIENDLY PARTS LIST; BOM CONTENT; STRUCTURING THE BOM; EVOLVE THE BOM; JUST-IN-TIME BOM; STRUCTURING FIRMWARE AND SOFTWARE; FEATURES AND OPTIONS; THE PERFECT BOM; BOM WORK FLOW; BOM STANDARDS; BOM METRICS; SUMMARY; Chapter Ten -- Request for Change Process; SEPARATE REQUEST PROCESS; DOES YOUR REQUEST PROCESS WORK? ; Cost reduction and improvements. | |
520 | |a Configuration Management for Senior Managers is written to help managers in product manufacturing and engineering environments identify the ways in which they can℗ streamline their products and processes through proactive documentation control and product lifecycle management. Experienced consultant Frank Watts gives a practitioner's view tailored to the needs of management, without the textbook theory that can be hard to translate into real-world change. | ||
546 | |a English. | ||
590 | |a O'Reilly |b O'Reilly Online Learning: Academic/Public Library Edition | ||
590 | |a ProQuest Ebook Central |b Ebook Central Academic Complete | ||
650 | 0 | |a Project management. | |
650 | 0 | |a Configuration management. | |
650 | 0 | |a Manufacturing industries. | |
650 | 6 | |a Gestion de projet. | |
650 | 6 | |a Gestion de configurations. | |
650 | 6 | |a Industrie manufacturière. | |
650 | 7 | |a BUSINESS & ECONOMICS |x Industrial Management. |2 bisacsh | |
650 | 7 | |a BUSINESS & ECONOMICS |x Management. |2 bisacsh | |
650 | 7 | |a BUSINESS & ECONOMICS |x Management Science. |2 bisacsh | |
650 | 7 | |a BUSINESS & ECONOMICS |x Organizational Behavior. |2 bisacsh | |
650 | 7 | |a Configuration management |2 fast | |
650 | 7 | |a Manufacturing industries |2 fast | |
650 | 7 | |a Project management |2 fast | |
758 | |i has work: |a Configuration management for senior managers (Text) |1 https://id.oclc.org/worldcat/entity/E39PCFCjgdq7g79vfwt3cXyy3P |4 https://id.oclc.org/worldcat/ontology/hasWork | ||
776 | 0 | 8 | |i Print version: |z 9780128026014 |w (OCoLC)907924109 |
856 | 4 | 0 | |u https://learning.oreilly.com/library/view/~/9780128023822/?ar |z Texto completo |
856 | 4 | 0 | |u https://ebookcentral.uam.elogim.com/lib/uam-ebooks/detail.action?docID=2030666 |z Texto completo |
938 | |a Books 24x7 |b B247 |n bke00089240 | ||
938 | |a Coutts Information Services |b COUT |n 31458756 | ||
938 | |a ProQuest Ebook Central |b EBLB |n EBL2030666 | ||
938 | |a ebrary |b EBRY |n ebr11047011 | ||
938 | |a EBSCOhost |b EBSC |n 981414 | ||
938 | |a ProQuest MyiLibrary Digital eBook Collection |b IDEB |n cis31458756 | ||
938 | |a YBP Library Services |b YANK |n 12393175 | ||
994 | |a 92 |b IZTAP |